Home / Browse projects / Solapur, Maharashtra / Chhoriya Township Wakhari Pandharpur Phase 2

Registered No litigation declared Plotted project

Chhoriya Township Wakhari Pandharpur Phase 2

By Chhoriya Properties And Development Company

RG-MH-16734 · RERA P52600026682 · Last updated on MahaRERA portal: 17 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
119 of 153Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Chhoriya Township Wakhari Pandharpur Phase 2 is a Plotted project by Chhoriya Properties And Development Company in Solapur, Maharashtra, registered with MahaRERA as P52600026682 on 21 Oct 2020. Possession is promised by 30 Jun 2029. 34 of the 153 units on this registration are recorded sold or booked.

At a glance

Project

  • NameChhoriya Township Wakhari Pandharpur Phase 2
  • TypePlotted
  • Location
    • 12 M W Road
    • Wakhari
    • Pandharpur
    • Wakhari
    • Pandharpur
    • Solapur
    • 413304
  • Pincode413304
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600026682
  • ReraGenie IDRG-MH-16734

Builder

  • NameChhoriya Properties And Development Company
  • Entity typePartnership
  • PartnersVinay Shantilal Chhoriya, Anmol Kanhaiyalal Chhoriya (HUF), Shantilal Devichand Jain (HUF), Dilip Devichand Jain
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2020PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Oct 2020
  • Promised completion30 Jun 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed65 files

Current status

22%34 of 153 units booked

Figures as on 17 Feb 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities17

As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Layout Compound WallYes40%
Ent GateYes80%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,832 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySDO Pandharpur
Permissible FSI17338.26
Proposed, not sanctioned17,338 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBibvewadi, Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Kunal P Patil
EngineerIMPower Projects - Mr Manish Pande
Chartered AccountantAyush S. Kankariya
PartnerRole in project
Chhoriya Properties And Development Company-

Litigation declared8

CaseCourtStatus
Spl CS No 6/2015/2015Honble One Jt Civil Judge Senior Division Pandharpurfor Steps
Spl CS No 63/2014/2014Honble One Jt Civil Judge Senior Division Pandharpurfor Argument on Exh
RCS no 274/2017/2017Honble Three Jt Civil Judge Senior Division Pandharpurfor Argument on Exh
861/2023BARA ivth jt CJJD JMFC PANDHARPURArgument on EXH Unready
1151/2023Twenty three vth Jt CJJD JMFC PANDHARPURVerification
63/2014Civil court Senior Division PandharpurArgument on EXH Unready
274/2017Civil court Senior Division PandharpurAmended Plaint
528/2022Civil court Senior Division PandharpurSteps

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f 3 2.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2.pdf17 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: f 3 2.pdf17 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Wakhari Pandharpur P2 April21-March22.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 2.pdf29 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 2.pdf29 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 2.pdf29 Dec 2023
Other - LegalFile: Phase 2.pdf29 Dec 2023
Other - LegalFile: police complaint__11zon.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pandharpur Architect's Certificate.PDF23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Wakhari Pandharpur P2 Dec 2022.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Pandharpur Dec2022.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Wakhari pandharpur P2 dec 2022.pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pandharpur CA_compressed.pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Wakhari pandharpur P2 dec 2022_compressed.pdf23 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CPDC PH II.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar pandharpur p2.pdf30 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er pandharpur 52 phase 2.pdf30 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA pandharpur 52 p2_11zon.pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: Pandharpur 52 A-2.pdf28 Dec 2022
Disclosure of sold/ booked inventoryFile: Pandharpur 52A P2.pdf27 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA pandharpur p2_11zon.pdf24 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ar certificate pandharpur 52p2.pdf23 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er pandharpur 52 p2.pdf23 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certi chhoriya township wakhari pandharpur phase 2.pdf4 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: er certi wakhari pandharpur phase 2.pdf4 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certi chhoriya township wakhari pandharpur phase 2.pdf4 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 jan 22 wakhari phase 2.pdf1 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 jan 22 wakhari phase 2.pdf1 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 wakhari phase 2.pdf1 Apr 2022
Disclosure of sold/ booked inventoryFile: Pandharpur Phase 2.pdf11 Feb 2022
Declaration about Commencement CertificateFile: declaration about commencement certificate wakhari phase 2.pdf10 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 WAKHARI PANDHARPUR PHASE 2_compressed.pdf25 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 RM DHARIWALGARDEN CITY WAKHARI PANDHARPUR PHASE 2.pdf15 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SodaPDF-compressed-FORM 2 R M DHARIWAL GARDEN CITY WAKHARI PANDHARPUR PHASE 2_reduce.pdf15 Oct 2021
Declaration in FORM BFile: Pandharpur 52A Phase - 1 , 2 Updated Form B.pdf1 Feb 2021
Copy of the legal title reportFile: Search Report 30-05-2020.pdf13 Oct 2020
Layout approvalFile: Pandharpur_Demarcated.pdf12 Oct 2020
Layout approvalFile: 1 1.pdf12 Oct 2020
Layout approvalFile: 2 2.pdf12 Oct 2020
Layout approvalFile: 3 3.pdf12 Oct 2020
Layout approvalFile: 4 4.pdf12 Oct 2020
Layout approvalFile: 5 5.pdf12 Oct 2020
Building plan approval or NA orderFile: Pandharpur 52 Acre Na Order.pdf12 Oct 2020
Building plan approval or NA orderFile: TP order.pdf12 Oct 2020
Layout approvalFile: Phase wise layout.pdf12 Oct 2020
PAN CardFile: Pan Pnadharpur 52A.pdf12 Oct 2020
Details of encumbrancesFile: Encumbrance Certificate_30-5-2020.pdf12 Oct 2020
Details of encumbrancesFile: Builer Encumbrance Certificate_30-5-2020.pdf12 Oct 2020
Copy of Layout Approval (in case of layout)File: Pandharpur_Demarcated.pdf12 Oct 2020
Copy of Layout Approval (in case of layout)File: 1 1.pdf12 Oct 2020
Copy of Layout Approval (in case of layout)File: 2 2.pdf12 Oct 2020
Copy of Layout Approval (in case of layout)File: 3 3.pdf12 Oct 2020
Copy of Layout Approval (in case of layout)File: 4 4.pdf12 Oct 2020
Copy of Layout Approval (in case of layout)File: 5 5.pdf12 Oct 2020
Copy of Layout Approval (in case of layout)File: Phase wise layout.pdf12 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Pandharpur 52 Acre Na Order.pdf12 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: TP order.pdf12 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Pandharpur 52 Acre Na Order.pdf12 Oct 2020
Declaration in FORM BFile: Form B.pdf12 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P - 52 Phase - 2 CA Certificate.pdf12 Oct 2020
Proforma of Allotment letterFile: ATS DRAFT.pdf12 Oct 2020
Proforma of Allotment letterFile: Allotment Latter.pdf12 Oct 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
R M Dhariwal Township Tembhurni PlottingAt Post - Tembhurni Tal - Madha Dist - SolapurCompletedDec 2019Dec 2019

How this compares with Solapur

22%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Chhoriya Township Wakhari Pandharpur Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakhari, Pandharpur550+ in Solapur

2 kmChhoriya Township WakharCompleted 5Lapsed / revoked 1Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Chhoriya Properties And Development Company

Chhoriya Properties And Development Company has 2 registrations on MahaRERA, including Chhoriya Township Wakhari Pandharpur Phase 2 and CHHORIYA TOWNSHIP WAKHARI PANDHARPUR PHASE 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Chhoriya Township Wakhari Pandharpur Phase 2 is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chhoriya Township Wakhari Pandharpur Phase 2?

The registered promoter entity is Chhoriya Properties And Development Company, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chhoriya Township Wakhari Pandharpur Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chhoriya Township Wakhari Pandharpur Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chhoriya Township Wakhari Pandharpur Phase 2?

The professionals named in the filing: Architect: Mr Kunal P Patil; Engineer: IMPower Projects - Mr Manish Pande; Chartered Accountant: Ayush S. Kankariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chhoriya Township Wakhari Pandharpur Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chhoriya Township Wakhari Pandharpur Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chhoriya Township Wakhari Pandharpur Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.