Home / Browse projects / Solapur, Maharashtra / SAI ICON

Registered No litigation declared Residential / Group Housing project

SAI ICON

By BJR CONTRUCTIONS PRIVATE LIMITED

RG-MH-73469 · RERA P52600054657 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 62%
56 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SAI ICON is a Residential / Group Housing project by BJR CONTRUCTIONS PRIVATE LIMITED in Solapur, Maharashtra, registered with MahaRERA as P52600054657 on 2 Feb 2024. Possession is promised by 31 Oct 2027. 15 of the 71 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI ICON
  • TypeResidential / Group Housing
  • Location
    • TP-4
    • F.P No.117
    • Sub Plot No 41
    • UMA Nagari
    • Murarji Peth
    • Solapur
    • Solapur North
    • Solapur
    • 413001
  • Pincode413001
  • RERA no.P52600054657
  • ReraGenie IDRG-MH-73469

Builder

  • NameBJR CONTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsBHARATKUMAR JAGANNATH RATHI, BHARATHI BHARATKUMAR RATHI

Key dates

this monthRegisteredFeb 2024PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2024
  • Promised completion31 Oct 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

21%15 of 71 units booked
35.8%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI ICONNA55333871

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 62%.

SAI ICON: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Sanitary Fittings within the flats / premises3%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership28

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,878 sq m
Land owned byThe promoter, with other names on the file
Named landowners28
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2026
LandownerVillageDistrict
BHAURAO CHATURBHUJ ZAGADESolapur (M Corp.)Solapur
Paramjeet Nandaji KadamSolapur (M Corp.)Solapur
Yoginath GadekarSolapur (M Corp.)Solapur
Ramchandra GaikwadSolapur (M Corp.)Solapur
Gurunath KalshettiSolapur (M Corp.)Solapur
Maruti TodkarSolapur (M Corp.)Solapur
Ambadas KambleSolapur (M Corp.)Solapur
Sudesh DhodmiseSolapur (M Corp.)Solapur
Sambhaji GavadeSolapur (M Corp.)Solapur
Hanumant PatilSolapur (M Corp.)Solapur
Shrishail KoliSolapur (M Corp.)Solapur
Shankar BuchuteSolapur (M Corp.)Solapur
Sambhaji JudagarSolapur (M Corp.)Solapur
Suresh ShindePune (M Corp.)Pune
Shivaji DeshmukhSolapur (M Corp.)Solapur
Sunil KimbahuneSolapur (M Corp.)Solapur
Dilip MoreSolapur (M Corp.)Solapur
Suyog GadekarSolapur (M Corp.)Solapur
Prasad PawarSolapur (M Corp.)Solapur
Prabhavati PawarSolapur (M Corp.)Solapur
Manisha WadveraoSolapur (M Corp.)Solapur
Narayan ShelakeSolapur (M Corp.)Solapur
Mahesh YelaveSolapur (M Corp.)Solapur
Vasant GawadeSolapur (M Corp.)Solapur
Yogesh PawarSolapur (M Corp.)Solapur
Shilpa MailSolapur (M Corp.)Solapur
Sneha MailSolapur (M Corp.)Solapur
Onkar Deepak RajageSolapur (M Corp.)Solapur

Approvals and building plan

Sanctioning authoritySolapur Municipal Corportation
Permissible FSI9128.3
Proposed, not sanctioned2,593 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAYUR COLONY KARVE ROAD KOTHRUD PUNE - 411038
Estimated costRs 15.00 cr
Cost incurredRs 5.36 cr
Work done35.77%
BuildingWingEstimatedIncurred
SAI ICONNARs 12.89 crRs 5.17 cr
-NARs 2.11 crRs 19.46 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMukund Kalantri
EngineerRajesh Jujare
EngineerAnant Sudhakar Dhole
EngineerVikas Shrinivas Padage
Chartered AccountantMahesh S Bajaj
Chartered AccountantVinod B Asawa
PartnerRole in project
BJR CONTRUCTIONS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 300626.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 300626.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 300626.pdf8 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf19 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf19 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 2026.pdf19 Jun 2026
Form 1File: Form_1_310326.pdf29 Apr 2026
Form 2File: Form_2_310326.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold Declaration.pdf29 Apr 2026
Form 3File: Form_3_310326.pdf29 Apr 2026
Form 1File: Form 1.pdf29 Jan 2026
Form 2File: Form 2.pdf29 Jan 2026
Form 3File: Form 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 311225.pdf29 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 310324.pdf13 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 310325.pdf13 Nov 2025
Form 1File: Form 1.pdf11 Nov 2025
Form 2File: Form 2.pdf11 Nov 2025
Form 3File: Form 3.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold.pdf11 Nov 2025
Form 1File: Form 1 June 25.pdf2 Sep 2025
Form 2File: Form 2 June 25.pdf2 Sep 2025
Form 3File: Form 3 June 25.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold units 300625.pdf2 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 310325_compressed.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Cert31-12-24.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate.pdf14 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BJR 7102024.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BJR 25102024.pdf7 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BJR 15112024.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2BJR 31032024.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BJR 20072024.pdf7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BJR 10112024.pdf7 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf7 Dec 2024
Other - LegalFile: 6848-1-20.pdf30 Jan 2024
Other - LegalFile: 6848-21-50.pdf30 Jan 2024
Other - LegalFile: 6848-51-75.pdf30 Jan 2024
Other - LegalFile: 6848-76-95.pdf30 Jan 2024
Other - LegalFile: 6848-96-120.pdf30 Jan 2024
Other - LegalFile: 6848-121-140.pdf30 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A bank Declaration.pdf25 Jan 2024
Other - LegalFile: DA-1-50_upload.pdf24 Jan 2024
Other - LegalFile: DA-51-100_upload.pdf24 Jan 2024
Other - LegalFile: DA-101-143_upload.pdf24 Jan 2024
Other - LegalFile: POA-1-40 upload.pdf24 Jan 2024
Other - LegalFile: POA-41-85 upload.pdf24 Jan 2024
Copy of the legal title reportFile: Legal Title.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Jan 2024
Proforma of Allotment letterFile: Allotment Letter with Annx A.pdf16 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviations or Additional Clauses in Allotment Letter.pdf16 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviations or Additional Clauses in Agreement for Sale.pdf16 Jan 2024
Other - TechnicalFile: Building Plan.pdf16 Jan 2024
CERSAI detailsFile: Cersai Declaration.pdf10 Jan 2024
Proforma of Agreement for saleFile: Solapur RERA agreement to sale Updated.pdf9 Jan 2024
Layout approvalFile: Plan.pdf7 Dec 2023
Copy of Layout Approval (in case of layout)File: Plan.pdf7 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Interest Bharat.pdf1 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Interest Bharati.pdf1 Dec 2023
Building plan approvalFile: 7TH and 12 FLOOR FLOOR REFUSE.pdf30 Nov 2023
PAN CardFile: PAN BJR.pdf30 Nov 2023
Details of encumbrances concerned to FinanceFile: Non Encumberance.pdf30 Nov 2023
Details of encumbrances concerned to LegalFile: Non Encumberance.pdf30 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 7TH and 12 FLOOR FLOOR REFUSE.pdf30 Nov 2023
Declaration in FORM BFile: From B Builder.pdf30 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf30 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf22 Nov 2023
Declaration about Commencement CertificateFile: Declaration Commencemant Certificate.pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: CERSAI_Search_Report.pdf22 Nov 2023

How this compares with Solapur

21%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep SAI ICON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Murarji Peth, Solapur550+ in Solapur

Builder: BJR CONTRUCTIONS PRIVATE LIMITED

BJR CONTRUCTIONS PRIVATE LIMITED has 1 registration on MahaRERA, including SAI ICON. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if SAI ICON is delayed beyond 31 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI ICON?

The registered promoter entity is BJR CONTRUCTIONS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI ICON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI ICON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI ICON?

The professionals named in the filing: Architect: Mukund Kalantri; Engineer: Rajesh Jujare; Engineer: Anant Sudhakar Dhole; Engineer: Vikas Shrinivas Padage; Chartered Accountant: Mahesh S Bajaj; Chartered Accountant: Vinod B Asawa. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI ICON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI ICON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI ICON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.