ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / JP North Imperia - Tower 1

Completed No litigation declared Residential / Group Housing project

JP North Imperia - Tower 1

By JP Infra Realty Private Limited

RG-MH-96939 · RERA P51700019613 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 85%
1Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

JP North Imperia - Tower 1 is a Residential / Group Housing project by JP Infra Realty Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700019613 on 14 Feb 2019. The registration is recorded completed; possession was promised by 30 Dec 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameJP North Imperia - Tower 1
  • TypeResidential / Group Housing
  • Location
    • Vinay Nagar Road
    • Near Vinay Nagar
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019613
  • ReraGenie IDRG-MH-96939

Builder

  • NameJP Infra Realty Private Limited
  • Entity typeCompany
  • CINU45200MH2010PTC206022
  • GSTIN27AAOCS9607A1Z7
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSHUBHAM VIJAYKUMAR JAIN, ABHISHEK CHHAGANLAL KHETAN
  • Other registrations16 more →
  • Completed8 of 17
  • Declared earlier projects15 →

Key dates

this monthRegisteredFeb 2019PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Feb 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JP North Imperia - Tower 1NA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 85%.

JP North Imperia - Tower 1: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises83%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,319 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12087.25
Proposed, not sanctioned8,424 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch30 Navyug Society Krishna Kunj V L Mehta Road Opp Sunflower Hospital JVPD Scheme Mumbai 400056

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajesh Khandeparkar of M/s. Urbdes
EngineerSmita Ankush Jadhav
Chartered AccountantK.M. Tulsian & Associates
Chartered AccountantSGCO & Co. LLP Chartered Accountants
PartnerRole in project
JP Infra Realty Private Limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000182004Naveen KrishnaJP Infra Realty Private Limited09/01/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2023

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate of Imperia Tower 1.pdf12 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Imperia Tower - 1.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2021.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- June 2021.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 2021.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Tower 1 Jan 21- March 21.pdf7 Apr 2023
Certificates of CA (Form 3)File: Form 3 Imperia 1 Jan 21-Mar 21.pdf7 Apr 2023
Certificates of CA (Form 3)File: Form 3 Imperia 1 April 21- June 21.pdf7 Apr 2023
Certificates of CA (Form 3)File: Imperia Tower 1 Form -3 - Sep 2021.pdf7 Apr 2023
Certificates of CA (Form 3)File: Form 3 - JP North Imperia - Tower 1 - March 2022.pdf7 Apr 2023
Certificates of CA (Form 3)File: Form 3 - JP North Imperia - Tower 1 - March 2022.pdf21 Mar 2023
Certificates of CA (Form 3)File: Form 3 - JP North Imperia - Tower 1 - June 2022.pdf21 Mar 2023
Proforma of Agreement for saleFile: Imperia - T1 - Agreement.pdf20 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory - Imperia Tower 1.pdf19 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- JP North Imperia- Tower 1 (July-September 2022).pdf2 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Imperia T1- OC.pdf2 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4- Imperia Tower 1.pdf2 Nov 2022
Certificates of CA (Form 3)File: Form 3.pdf28 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Imperia 2022.pdf21 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JP Infra Imperia Tower 1 Project RERA Form 2- 30-6-2022.pdf26 Aug 2022
CERSAI detailsFile: CERSAI Search Report.pdf25 Jul 2022
Details of encumbrancesFile: Non Encumbrance Certificate.pdf22 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory.pdf22 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 - Imperia Tower 1.pdf19 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 - Imperia Tower 1.pdf19 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A- Imperia Tower 1.pdf19 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J5169 IMPERIA T1 C07 Architect's Certificate.pdf6 May 2022
Certificates of CA (Form 3)File: Form 3 - JP North Imperia - Tower 1.pdf29 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J5169 IMPERIA T1 C06 Architect's Certificate.pdf16 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Imperia- Tower 1-Engineers Certificate.pdf10 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Imperia.pdf14 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower 1.pdf28 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower 1.pdf28 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Imperia Tower 1.pdf28 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Imperia Tower 1.pdf28 Oct 2021
OtherFile: CERSAI_Search_Report_Imperia 1.pdf4 Sep 2021
Building plan approvalFile: Plan.pdf27 Aug 2021
Building Plan Approval (IOD)File: Plan.pdf27 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf27 Aug 2021
Declaration about Commencement CertificateFile: Declaration.pdf27 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Imperia Tower 1_compressed.pdf12 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A _ June.pdf4 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A _ September.pdf4 Dec 2019
Proforma of Allotment letterFile: AFS.pdf29 Mar 2019
Building plan approvalFile: IOD-CC.pdf1 Feb 2019
Layout approvalFile: Layout.pdf1 Feb 2019
Copy of the legal title reportFile: Title certificate.pdf1 Feb 2019
Details of encumbrancesFile: Encumbrance.pdf1 Feb 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf1 Feb 2019
Building Plan Approval (IOD)File: IOD-CC.pdf1 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: IOD-CC.pdf1 Feb 2019
Declaration in FORM BFile: Form B.pdf1 Feb 2019
Certificates of CA (Form 3)File: CA certificate.pdf1 Feb 2019
Proforma of Allotment letterFile: AFS not uploaded.pdf1 Feb 2019

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise5 not delivered by the promised date8 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JP CONNECT-MIRAROADPC1330002502082VINAY NAGAR, Thane624Jan 2026OngoingDec 2032Not due yet
The Palace Tower AP51700078483VINAY NAGAR, Thane567Dec 2024OngoingDec 2031Not due yet
North Westend Tower 2P51700079721BHAYANDER, Thane308Mar 2025OngoingDec 2031Not due yet
Codename StarLifeP51700054275Bhayander East, Thane1,539Jan 2024OngoingDec 2031Not due yet
North Westend Tower 1P51700053522Bhayander, Thane865Nov 2023OngoingDec 2029Not due yet
The Palace Tower CP51700033431Vinay Nagar, Thane637Feb 2022OngoingDec 2028Not due yet
The Palace Tower BP51700033430Vinay Nagar, Thane942Feb 2022OngoingDec 2028Not due yet
JP North AvivaP51700023940Vinay Nagar, Thane-Jan 2020Certificate SignedDec 2026Not due yet
JP North Imperia - Tower 2P51700019783Near Vinay Nagar, Thane-Mar 2019CompletedDec 2025Dec 2025
JP North EuphoriaP51700016290Vinaynagar, Thane-May 2018Certificate SignedDec 2025Not delivered
JP North AlexaP51700016736near Vinay Nagar, Thane-Jun 2018Certificate SignedDec 2025Not delivered
JP North ElaraP51700007001Vinaynagar, Thane-Aug 2017Certificate SignedJun 2022Not delivered
JP North EstellaP51700008916Vinaynagar, Thane-Aug 2017Certificate SignedDec 2021Not delivered
JP North AtriaP51700004117Vinaynagar, Thane-Aug 2017Certificate SignedDec 2021Not delivered

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JP North Imperia - Tower 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Vinay Nagar7,600+ in Thane

2 kmJP North Imperia - TowerCompleted 42Lapsed / revoked 27Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: JP Infra Realty Private Limited

JP Infra Realty Private Limited has 17 registrations on MahaRERA, including JP North Estella and JP North Atria. Its filings disclose 15 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JP North Imperia - Tower 1 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JP North Imperia - Tower 1?

The registered promoter entity is JP Infra Realty Private Limited, a company as per the filing. Its CIN U45200MH2010PTC206022 and GSTIN 27AAOCS9607A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JP North Imperia - Tower 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JP North Imperia - Tower 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JP North Imperia - Tower 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JP North Imperia - Tower 1?

The professionals named in the filing: Architect: Rajesh Khandeparkar of M/s. Urbdes; Engineer: Smita Ankush Jadhav; Chartered Accountant: K.M. Tulsian & Associates; Chartered Accountant: SGCO & Co. LLP Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JP North Imperia - Tower 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JP North Imperia - Tower 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JP North Imperia - Tower 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.