Completed No litigation declared Residential / Group Housing project

JP North Euphoria

By JP Infra Realty Private Limited

RG-MH-99646 · RERA P51700016290 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Staircases, 95%
2Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

JP North Euphoria is a Residential / Group Housing project by JP Infra Realty Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700016290 on 2 May 2018. The registration is recorded completed; possession was promised by 30 Dec 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameJP North Euphoria
  • TypeResidential / Group Housing
  • Location
    • Vinaynagar
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016290
  • ReraGenie IDRG-MH-99646

Builder

  • NameJP Infra Realty Private Limited
  • Entity typeCompany
  • CINU45200MH2010PTC206022
  • GSTIN27AAOCS9607A1Z7
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSHUBHAM VIJAYKUMAR JAIN, ABHISHEK CHHAGANLAL KHETAN
  • Other registrations16 more →
  • Completed8 of 17
  • Declared earlier projects15 →

Key dates

this monthRegisteredMay 2018PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 May 2018
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JP North EuphoriaNA380000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

JP North Euphoria: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises67%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed228

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots228
Closed/Covered228

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,861 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Anita Kamal JainAndheriMumbai Suburban

Approvals and building plan

Permissible FSI20355.55
Proposed, not sanctioned15,588 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch101, Raheja Centre, 1st Floor, Nariman Point, Mumbai 400021

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajesh Khandeparkar of M/s Urbdes
EngineerSmita Ankush Jadhav
Chartered AccountantK.M. Tulsian & Associates
Chartered AccountantSGCO & Co. LLP Chartered Accountants
PartnerRole in project
JP Infra Realty Private Limited-

Litigation declared1

CaseCourtStatus
203/2016Thane CourtReport

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000171779Priti Mridul DubeySkylark Realtors Private Limited05/12/2019
CC006000000396838Ritika SinghJP Infra Realty Private Limited28/07/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Apr 2023

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: IOD CC Plan 4 MLCP Bldg Dt 21102021.pdf25 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: IOD CC Letter MLCP Bldg Dt 21102021.pdf25 Apr 2025
Building Plan Approval (IOD)File: IOD CC Plan 4 MLCP Bldg Dt 21102021.pdf25 Apr 2025
OtherFile: JP NORTH EUPHORIA- Allocation Letter.pdf25 Apr 2025
OtherFile: IMPORTANT DISCLOSURE WRT MLCP TOWER clean 010425.pdf25 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC.pdf7 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf7 Apr 2023
Certificates of CA (Form 3)File: Form 3 - Euphoria - March 2022.pdf23 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate March 2021.pdf28 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf7 Feb 2023
Certificates of CA (Form 3)File: Form 3 - Euphoria Jan 21-Mar 21.pdf4 Feb 2023
Certificates of CA (Form 3)File: Form 3 - Euphoria April 21- June 21.pdf4 Feb 2023
Certificates of CA (Form 3)File: Form -3 Euphoria July 21 - Sept 21.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Euphoria - April 2019 to March 2020.pdf4 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - April 21 - June 21.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - July 21 - Sep - 21.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jan 21 - Mar 21.pdf20 Jan 2023
Proforma of Agreement for saleFile: Euphoria- Agreement.pdf20 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory- Euphoria.pdf19 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Nov 2022
Certificates of CA (Form 3)File: Form 3.pdf21 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf21 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- JP North Euphoria (July-September 2022).pdf2 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Euphoria 2022.pdf21 Oct 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SRC.pdf21 Oct 2022
Copy of the legal title reportFile: TC.pdf27 Sep 2022
Certificates of CA (Form 3)File: Form 3.pdf22 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JP North Euphoria.pdf8 Aug 2022
CERSAI detailsFile: CERSAI Search Report.pdf25 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory.pdf22 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 - Euphoria.pdf19 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A- Euphoria.pdf19 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J5169 EUPHORIA C12 Architect's Certificate.pdf6 May 2022
Certificates of CA (Form 3)File: Form 3 - JP North Euphoria.pdf12 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J5169 EUPHORIA C11 Architect's CertificatE.pdf16 Mar 2022
Details of encumbrancesFile: Encumbrance-17022022.pdf17 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Euphoria-Engineers Certificate.pdf10 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Euphoria.pdf14 Jan 2022
Copy of the legal title reportFile: 3rd Suppl.pdf27 Oct 2021
Copy of the legal title reportFile: 4th Suppl.pdf27 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Euphoria.pdf27 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Euphoria.pdf27 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Euphoria.pdf27 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Euphoria.pdf27 Oct 2021
Layout approvalFile: IOD.pdf26 Oct 2021
Copy of Layout Approval (in case of layout)File: IOD.pdf26 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Oct 2021
Declaration about Commencement CertificateFile: Declaration.pdf26 Oct 2021
OtherFile: CERSAI_Search_Report_Security_Interest_Id_Based_Search_03_09_2021_15_43_52_303.pdf4 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf27 Aug 2021
Declaration about Commencement CertificateFile: Declaration.pdf27 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Euphoria_compressed.pdf12 Dec 2019
Proforma of Allotment letterFile: AFS.pdf1 Apr 2019
Building plan approvalFile: IOD CC.pdf28 Feb 2019
Layout approvalFile: Layout.pdf28 Feb 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf28 Feb 2019
Building Plan Approval (IOD)File: IOD CC.pdf28 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: IOD CC.pdf28 Feb 2019
Copy of the legal title reportFile: Second Supplemental Title Certificate.pdf24 Nov 2018
Details of encumbrancesFile: Encumbrance Certificate.pdf24 Nov 2018
Declaration in FORM BFile: Form B Promoter 2.pdf24 Nov 2018
Declaration in FORM BFile: Form B Promoter 1.pdf24 Nov 2018
Proforma of Allotment letterFile: AFS.pdf24 Nov 2018
Copy of the legal title reportFile: Supplemental Title Certificate 20180718.pdf1 Aug 2018
Copy of the legal title reportFile: Supplemental Title Certificate 20180718.pdf1 Aug 2018
Details of encumbrancesFile: Encumbrance Certificate.pdf1 Aug 2018
Declaration in FORM BFile: Form B Promoter 1.pdf1 Aug 2018
Declaration in FORM BFile: Form B Promoter 2.pdf1 Aug 2018
Proforma of Allotment letterFile: 20180730 AFS.pdf1 Aug 2018
Layout approvalFile: Euphoria Layout 17_04_08 compressed.pdf23 Apr 2018
Copy of the legal title reportFile: 20180423 Title Certificate Final compressed.pdf23 Apr 2018
Copy of Layout Approval (in case of layout)File: Euphoria Layout 17_04_08 compressed.pdf23 Apr 2018
Proforma of Allotment letterFile: 20180423 AFS Euphoria R1_0.pdf23 Apr 2018
Building plan approvalFile: IOD-CC Letter Euphoria 17_04_2018 compressed_rotated.pdf21 Apr 2018
PAN CardFile: 1 Pan Card Skylark.pdf21 Apr 2018
Details of encumbrancesFile: 20180421 Details of Encubrances JP North Euphoria.pdf21 Apr 2018
Building Plan Approval (IOD)File: IOD-CC Letter Euphoria 17_04_2018 compressed_rotated.pdf21 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: IOD-CC Letter Euphoria 17_04_2018 compressed_rotated.pdf21 Apr 2018
Declaration in FORM BFile: 20180421 Form B Euphoria Skylark Promoter 1 compressed rotated.pdf21 Apr 2018

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise4 not delivered by the promised date8 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JP CONNECT-MIRAROADPC1330002502082VINAY NAGAR, Thane624Jan 2026OngoingDec 2032Not due yet
The Palace Tower AP51700078483VINAY NAGAR, Thane567Dec 2024OngoingDec 2031Not due yet
North Westend Tower 2P51700079721BHAYANDER, Thane308Mar 2025OngoingDec 2031Not due yet
Codename StarLifeP51700054275Bhayander East, Thane1,539Jan 2024OngoingDec 2031Not due yet
North Westend Tower 1P51700053522Bhayander, Thane865Nov 2023OngoingDec 2029Not due yet
The Palace Tower CP51700033431Vinay Nagar, Thane637Feb 2022OngoingDec 2028Not due yet
The Palace Tower BP51700033430Vinay Nagar, Thane942Feb 2022OngoingDec 2028Not due yet
JP North AvivaP51700023940Vinay Nagar, Thane-Jan 2020Certificate SignedDec 2026Not due yet
JP North Imperia - Tower 2P51700019783Near Vinay Nagar, Thane-Mar 2019CompletedDec 2025Dec 2025
JP North Imperia - Tower 1P51700019613Near Vinay Nagar, Thane-Feb 2019CompletedDec 2025Dec 2025
JP North AlexaP51700016736near Vinay Nagar, Thane-Jun 2018Certificate SignedDec 2025Not delivered
JP North ElaraP51700007001Vinaynagar, Thane-Aug 2017Certificate SignedJun 2022Not delivered
JP North EstellaP51700008916Vinaynagar, Thane-Aug 2017Certificate SignedDec 2021Not delivered
JP North AtriaP51700004117Vinaynagar, Thane-Aug 2017Certificate SignedDec 2021Not delivered

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JP North Euphoria on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vinaynagar7,600+ in Thane

2 kmJP North EuphoriaCompleted 42Lapsed / revoked 27Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: JP Infra Realty Private Limited

JP Infra Realty Private Limited has 17 registrations on MahaRERA, including JP North Estella and JP North Atria. Its filings disclose 15 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JP North Euphoria is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JP North Euphoria?

The registered promoter entity is JP Infra Realty Private Limited, a company as per the filing. Its CIN U45200MH2010PTC206022 and GSTIN 27AAOCS9607A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JP North Euphoria?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JP North Euphoria?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JP North Euphoria?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JP North Euphoria?

The professionals named in the filing: Architect: Rajesh Khandeparkar of M/s Urbdes; Engineer: Smita Ankush Jadhav; Chartered Accountant: K.M. Tulsian & Associates; Chartered Accountant: SGCO & Co. LLP Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JP North Euphoria?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JP North Euphoria. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JP North Euphoria to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.