ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Sector 2A - Wings JKL

Registered Litigation declared Residential / Group Housing project

Sector 2A - Wings JKL

By Eversmile Properties Private Limited

RG-MH-18634 · RERA PR1338082400025 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 180.00 crore secured on the land, in favour of Vistra ITCL (India) Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
602 of 673Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

Sector 2A - Wings JKL is a Residential / Group Housing project by Eversmile Properties Private Limited in Thane, Maharashtra, registered with MahaRERA as PR1338082400025 on 3 Oct 2024. Possession is promised by 31 Dec 2029. 71 of the 673 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameSector 2A - Wings JKL
  • TypeResidential / Group Housing
  • Location
    • Bhaktivedanta Swami Marg
    • Shrushti Road
    • Mira Road
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1338082400025
  • ReraGenie IDRG-MH-18634

Builder

  • NameEversmile Properties Private Limited
  • Entity typeCompany
  • CINU70100MH1979PTC021291
  • GSTIN27AAACE1576C2ZY
  • DirectorsNarendra Kumar Lodha, Devesh DHANANJAY BHATT, SHRAVAN KUMAR BALI
  • Other registrations8 more →
  • Completed2 of 9

Key dates

this monthRegisteredOct 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Oct 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed34 files

Current status

11%71 of 673 units booked
0.0%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing JNA413817413187
Wing KNA41362430243
Wing LNA41362430243

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Wing J0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing K0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing L0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed1203

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,203
Closed/Covered1,203
BuildingClosed/CoveredTotal
Wing J417417
Wing K393393
Wing L393393

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area37,880 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofVistra ITCL (India) Limited
Secured amountRs 180.00 crore
Declared on22 May 2025

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI81786.96
Proposed, not sanctioned80,287 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD GROUND FLOOR JEHANGIR BUILDING M G ROAD FORT MUMBAI MAHARASHTRA 400001
Estimated costRs 356.54 cr
Work done0.0%
BuildingWingEstimatedIncurred
-NARs 108.89 cr-
Wing JNARs 88.49 cr-
Wing LNARs 80.59 cr-
Wing KNARs 78.57 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJethe & Associates
EngineerSachin Moghe
EngineerVijendra Vartak
Chartered AccountantM A Parikh Shah & Associates LLP
Chartered AccountantC.R Mohnot & Co.
Chartered AccountantN.A. Shah Associates LLP
PartnerRole in project
Eversmile Properties Private Limited-

Litigation declared2

CaseCourtStatus
107/2022National Green TribunalOngoing
23 of 2023/2023National Green TribunalOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2024
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Sector 2A Wings JKL.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sector 2A Wing JKL.pdf17 Apr 2026
Form 1File: Sector 2A JKL AC.pdf17 Apr 2026
Form 2File: Sector 2A JKL EC.pdf17 Apr 2026
Form 3File: Sector 2A JKL EC.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sector 2A- JKL.pdf20 Jan 2026
Form 1File: Sector 2A Wing JKL AC.pdf20 Jan 2026
Form 2File: Sector 2A Wing JKL EC.pdf20 Jan 2026
Form 3File: CA Certificate Srishti Sector 2A Wing JKL 311225.pdf20 Jan 2026
Form 1File: Sector 2A JKL AC.pdf15 Oct 2025
Form 2File: Sector 2A JKL EC.pdf15 Oct 2025
Form 3File: CA Certificate Srishti Sector 2A Wing JKL 300925.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sector 2A- Wings JKL.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Sector 2A Wing JKL March 25.pdf29 Sep 2025
Form 1File: Sector 2A Wing JKL.pdf20 Jul 2025
Form 2File: 2A-WING JKL.pdf20 Jul 2025
Form 3File: Srishti Sector 2A Wing JKL.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: 2A Wing JKL.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Sector 2A JKL.pdf30 Jun 2025
Building plan approvalFile: FSI Declaration.pdf16 Sep 2024
Building plan approvalFile: Declaration for project land area.pdf16 Sep 2024
Building plan approvalFile: 2 3.pdf12 Sep 2024
Building plan approvalFile: 15-16.pdf9 Sep 2024
Building plan approvalFile: 17-18.pdf9 Sep 2024
Building plan approvalFile: 19.pdf9 Sep 2024
Building plan approvalFile: 20-21.pdf9 Sep 2024
Building plan approvalFile: 22-23.pdf9 Sep 2024
Layout approvalFile: 1.pdf4 Sep 2024
Building plan approvalFile: 4-5.pdf4 Sep 2024
Building plan approvalFile: 6-7.pdf4 Sep 2024
Building plan approvalFile: 8-9.pdf4 Sep 2024
Building plan approvalFile: 10.pdf4 Sep 2024
Building plan approvalFile: 11-12.pdf4 Sep 2024
Building plan approvalFile: 13-14.pdf4 Sep 2024

How this compares with Thane

11%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sector 2A - Wings JKL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shrushti Road, Mira Road7,600+ in Thane

Builder: Eversmile Properties Private Limited

Eversmile Properties Private Limited has 9 registrations on MahaRERA, including Sector 2A - Wing A and Sector 2A - Wing B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sector 2A - Wings JKL is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sector 2A - Wings JKL?

The registered promoter entity is Eversmile Properties Private Limited, a company as per the filing. Its CIN U70100MH1979PTC021291 and GSTIN 27AAACE1576C2ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sector 2A - Wings JKL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sector 2A - Wings JKL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sector 2A - Wings JKL?

The professionals named in the filing: Architect: Jethe & Associates; Engineer: Sachin Moghe; Engineer: Vijendra Vartak; Chartered Accountant: M A Parikh Shah & Associates LLP; Chartered Accountant: C.R Mohnot & Co.; Chartered Accountant: N.A. Shah Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sector 2A - Wings JKL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sector 2A - Wings JKL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sector 2A - Wings JKL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.