Home / Browse projects / Thane, Maharashtra / JP CONNECT-MIRAROAD
JP CONNECT-MIRAROAD
By JP Infra Realty Private Limited
RG-MH-74933 · RERA PC1330002502082 · Last updated on MahaRERA portal: 3 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 4 months
- 1 extension taken
- Rs 50.00 crore secured on the land, in favour of ARKA FINCAP LIMITED
- Allotment letter deviates from the model form
Clear
- No litigation declared
- Separate project account declared
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
JP CONNECT-MIRAROAD is a Commercial project by JP Infra Realty Private Limited in Thane, Maharashtra, registered with MahaRERA as PC1330002502082 on 14 Jan 2026. Possession is promised by 30 Apr 2033. The completion date has moved by 4 months from the original filing. 133 of the 624 units on this registration are recorded sold or booked, and 0 of 16 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameJP CONNECT-MIRAROAD
- TypeCommercial
- Location
- VINAY NAGAR ROAD
- VINAY NAGAR
- Mira-Bhayandar (M Corp.)
- Thane
- 401107
- Pincode401107
- MapView location on Google Maps (as filed on RERA)
- RERA no.PC1330002502082
- ReraGenie IDRG-MH-74933
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Jan 2026
- Promised completion30 Apr 2033
- Revised completionRevised to 30 Apr 2033 (originally 31 Dec 2032)
- Buildings2 building records
- Documents filed22 files
Current status
Figures as on 3 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) | A (COMMERCIAL BUILDING) | 28 | 27 | 0 | 613 | 613 |
| A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) | B (COMMERCIAL BUILDING) | 4 | 1 | 0 | 11 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 16 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) · wing A (COMMERCIAL BUILDING)0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) · wing B (COMMERCIAL BUILDING)0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed707
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Mechanical | Basement | Total |
|---|---|---|---|---|
| A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) A (COMMERCIAL BUILDING) | 0 | 546 | 0 | 546 |
| A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) B (COMMERCIAL BUILDING) | 100 | 0 | 61 | 161 |
Land and ownership6
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| NARMADA KAMALAKAR PATIL | Mira-Bhayandar (M Corp.) | Thane |
| NARENDRA KAMALAKAR PATIL | Mira-Bhayandar (M Corp.) | Thane |
| NIRMALA NARENDRA PATIL | Mira-Bhayandar (M Corp.) | Thane |
| JAYANT NARENDRA PATIL | Mira-Bhayandar (M Corp.) | Thane |
| ROHAN NARENDRA PATIL | Mira-Bhayandar (M Corp.) | Thane |
| BORDER NARENDRA PATIL | Mira-Bhayandar (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) | A (COMMERCIAL BUILDING) | Rs 91.73 cr | Rs 6.66 cr |
| A (COMMERCIAL BUILDING), B (COMMERCIAL BUILIDNG ) | B (COMMERCIAL BUILDING) | Rs 91.73 cr | Rs 6.66 cr |
| - | NA | Rs 3.79 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | URBDES |
| Architect | Anand Dhokay & Associates |
| Engineer | VIJAY JOSHI |
| Engineer | AVP STRUCTURAL CONSULTANTS |
| Chartered Accountant | CAS & CO |
| Chartered Accountant | SGCO & CO LLP |
| Partner | Role in project |
|---|---|
| JP Infra Realty Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602250 | Ronald Rocky Alphonso | JP Infra Realty Private Limited | 17/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalNot on the file
The planning authority's approval of how the plots and buildings sit on the land.
- Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Dec 2025 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2033
Documents filed22
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_ JUNE 26_JP CONNECT-MIRAROAD.pdf | 3 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2_ JUNE 26_JP CONNECT-MIRAROAD.pdf | 3 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3_ JUNE 26_JP CONNECT-MIRAROAD.pdf | 3 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 JP Connect Miraroad 31032026.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: Form 2 JP Connect 31032026.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: Form 3 JP Connect Miraroad 3132026.pdf | 15 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A JP Connect.pdf | 15 May 2026 |
| Withdrawal Update Form 1File: Form 1 JP Connect Miraroad 31032026.pdf | 14 May 2026 |
| Withdrawal Update Form 2File: Form 2 JP Connect 31032026.pdf | 14 May 2026 |
| Withdrawal Update Form 3File: Form 3 JP Connect Miraroad 3132026.pdf | 14 May 2026 |
| Declaration and undertaking (Annexure A)File: Annexure A 50-2024.pdf | 4 Dec 2025 |
| Building plan approvalFile: PLANS-1.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-2.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-3.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-4.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-5.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-6.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-7.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-8.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-9.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-10.pdf | 3 Dec 2025 |
| Building plan approvalFile: PLANS-11.pdf | 3 Dec 2025 |
Promoter's earlier projects14
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| The Palace Tower AP51700078483 | VINAY NAGAR, Thane | 567 | Dec 2024 | Ongoing | Dec 2031 | Not due yet |
| North Westend Tower 2P51700079721 | BHAYANDER, Thane | 308 | Mar 2025 | Ongoing | Dec 2031 | Not due yet |
| Codename StarLifeP51700054275 | Bhayander East, Thane | 1,539 | Jan 2024 | Ongoing | Dec 2031 | Not due yet |
| North Westend Tower 1P51700053522 | Bhayander, Thane | 865 | Nov 2023 | Ongoing | Dec 2029 | Not due yet |
| The Palace Tower CP51700033431 | Vinay Nagar, Thane | 637 | Feb 2022 | Ongoing | Dec 2028 | Not due yet |
| The Palace Tower BP51700033430 | Vinay Nagar, Thane | 942 | Feb 2022 | Ongoing | Dec 2028 | Not due yet |
| JP North AvivaP51700023940 | Vinay Nagar, Thane | - | Jan 2020 | Certificate Signed | Dec 2026 | Not due yet |
| JP North Imperia - Tower 2P51700019783 | Near Vinay Nagar, Thane | - | Mar 2019 | Completed | Dec 2025 | Dec 2025 |
| JP North Imperia - Tower 1P51700019613 | Near Vinay Nagar, Thane | - | Feb 2019 | Completed | Dec 2025 | Dec 2025 |
| JP North EuphoriaP51700016290 | Vinaynagar, Thane | - | May 2018 | Certificate Signed | Dec 2025 | Not delivered |
| JP North AlexaP51700016736 | near Vinay Nagar, Thane | - | Jun 2018 | Certificate Signed | Dec 2025 | Not delivered |
| JP North ElaraP51700007001 | Vinaynagar, Thane | - | Aug 2017 | Certificate Signed | Jun 2022 | Not delivered |
| JP North EstellaP51700008916 | Vinaynagar, Thane | - | Aug 2017 | Certificate Signed | Dec 2021 | Not delivered |
| JP North AtriaP51700004117 | Vinaynagar, Thane | - | Aug 2017 | Certificate Signed | Dec 2021 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 16 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 22 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep JP CONNECT-MIRAROAD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VINAY NAGAR7,600+ in Thane
Filed coordinates, straight-line distance. 235 registered projects within 2 km.
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: JP Infra Realty Private Limited
JP Infra Realty Private Limited has 17 registrations on MahaRERA, including JP North Estella and JP North Atria. Its filings disclose 15 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if JP CONNECT-MIRAROAD is delayed beyond 30 Apr 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of JP CONNECT-MIRAROAD?
The registered promoter entity is JP Infra Realty Private Limited, a company as per the filing. Its CIN U45200MH2010PTC206022 and GSTIN 27AAOCS9607A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in JP CONNECT-MIRAROAD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against JP CONNECT-MIRAROAD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for JP CONNECT-MIRAROAD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at JP CONNECT-MIRAROAD?
The professionals named in the filing: Architect: URBDES; Architect: Anand Dhokay & Associates; Engineer: VIJAY JOSHI; Engineer: AVP STRUCTURAL CONSULTANTS; Chartered Accountant: CAS & CO; Chartered Accountant: SGCO & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in JP CONNECT-MIRAROAD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback