ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / JP North Atria

Completed No litigation declared Others project

JP North Atria

By JP Infra Realty Private Limited

RG-MH-25407 · RERA P51700004117 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
9Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

JP North Atria is a Others project by JP Infra Realty Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700004117 on 8 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 9 complaints are on record with the regulator.

At a glance

Project

  • NameJP North Atria
  • TypeOthers
  • Location
    • Vinaynagar road
    • Vinaynagar
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700004117
  • ReraGenie IDRG-MH-25407

Builder

  • NameJP Infra Realty Private Limited
  • Entity typeCompany
  • CINU45200MH2010PTC206022
  • GSTIN27AAOCS9607A1Z7
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSHUBHAM VIJAYKUMAR JAIN, ABHISHEK CHHAGANLAL KHETAN
  • Other registrations16 more →
  • Completed8 of 17
  • Declared earlier projects15 →

Key dates

this monthRegisteredAug 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JP North AtriaNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

JP North Atria: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Clubhouse with Amenities as mentioned in AFSYes0%

Parking filed184

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots184
Closed/Covered149
Open Space35

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,859 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
JP Infra Constructions Pvt LtdAndheriMumbai Suburban

Approvals and building plan

Permissible FSI15177.27
Proposed, not sanctioned15,177 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch30 Navyug Society Krishna Kunj V L Mehta Road Opp Sunflower Hospital JVPD Scheme Mumbai 400056

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
JP Infra Realty Private Limited-

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000012511SANJEEV PRAKASHCHANDRA MISHRASKYLARK REALTORS PV LTD19/12/2017
CC006000000209570AARTI SHANTILAL JANISHUBHAM JAIN29/12/2021
CC006000000292564PRADEEP RAMSAJIVAN KANOJIYAJP Infra Mumbai Private Limited19/09/2022
CC12400531Rakesh Ramyagya TiwariJP Infra Realty Private Limited23/10/2024
CC12400486Nagendra Ramesh MishraJP Infra Realty Private Limited21/10/2024
CC12400435Rupal Hasmukh RawalJP Infra Realty Private Limited17/10/2024
CC12400478Pradeep kanojiyaJP Infra Realty Private Limited20/10/2024
CC12400532RONOJIT ROYJP Infra Realty Private Limited23/10/2024
CC12400544RAHUL KUMAR JHAJP Infra Realty Private Limited24/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: IOD CC Plan 4 MLCP Bldg Dt 21102021.pdf25 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: IOD CC Letter MLCP Bldg Dt 21102021.pdf25 Apr 2025
Building Plan Approval (IOD)File: IOD CC Plan 4 MLCP Bldg Dt 21102021.pdf25 Apr 2025
OtherFile: JP NORTH ATRIA- Allocation Letter.pdf25 Apr 2025
OtherFile: IMPORTANT DISCLOSURE WRT MLCP TOWER clean 010425.pdf25 Apr 2025
Proforma of Agreement for saleFile: Atria- Agreement.pdf20 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Atria.pdf14 Jan 2022
Architect’s Certificate on Completion of Project (Form 4)File: Atria.pdf2 Mar 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Atria_compressed.pdf17 Dec 2019
OtherFile: full OC.pdf31 Oct 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration certificate.pdf18 Dec 2018
Copy of the legal title reportFile: Third Supplemental TC.pdf24 Nov 2018
Details of encumbrancesFile: Encumbrance Certificate.pdf24 Nov 2018
Declaration in FORM BFile: Form B Promoter 1.pdf24 Nov 2018
Declaration in FORM BFile: Form B Promoter 2.pdf24 Nov 2018
Proforma of Allotment letterFile: AFS.pdf24 Nov 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society name registration.pdf24 Nov 2018
Certificates of CA (Form 5)File: Atria - JPIC.pdf30 Sep 2018
Certificates of CA (Form 5)File: Atria - Skylark.pdf30 Sep 2018
Proforma of Allotment letterFile: SKY AFS.pdf29 Aug 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society name reservation extension.pdf29 Aug 2018
Copy of the legal title reportFile: Further supp Title certificate.pdf4 Aug 2018
Details of encumbrancesFile: Encumbrances.pdf4 Aug 2018
Declaration in FORM BFile: Form B - Promoter 1.pdf4 Aug 2018
Declaration in FORM BFile: Form B - Promoter 2.pdf4 Aug 2018
Copy of the legal title reportFile: 2nd Corrigendum cum Suppl 13_6_2018 compressed.pdf16 Jun 2018
Proforma of Allotment letterFile: AFS R6_5 Atria dated 15_6_2018.pdf16 Jun 2018
Details of encumbrancesFile: Encumbrance Details - Project Atria.pdf4 May 2018
Declaration in FORM BFile: Form-B-Atria-Skylark-Promoter -compressed.pdf4 May 2018
Proforma of Allotment letterFile: R6_2 Atria Skylark 25_04_2018 Allotment and AFS.pdf4 May 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter For Reservation Name and Open Accounts Bank Atria.pdf6 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Atria Copy to Dy Reg MBMC For Reservation Name of Society.pdf30 Mar 2018
Proforma of Allotment letterFile: AFS and Allotment Letter R6_0 Atria compressed.pdf7 Feb 2018
Layout approvalFile: Sanctioned layout 090817.pdf6 Nov 2017
Building plan approvalFile: IOD Letter dated 090817 compressed.pdf6 Nov 2017
Copy of the legal title reportFile: Corrigendum Atria dated 161017.pdf6 Nov 2017
Details of encumbrancesFile: Encumbrance - Atria with date.pdf6 Nov 2017
Copy of Layout Approval (in case of layout)File: Sanctioned layout 090817.pdf6 Nov 2017
Building Plan Approval (IOD)File: IOD Letter dated 090817 compressed.pdf6 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Letter dated 090817 compressed.pdf6 Nov 2017
Declaration in FORM BFile: 061117 Form B Atria JPIC Co Promoter compressed.pdf6 Nov 2017
Declaration in FORM BFile: 061117Form B Atria Skylark Promoter compressed.pdf6 Nov 2017
Proforma of Allotment letterFile: AFS and Allotment Letter 061117.pdf6 Nov 2017
Proforma of Allotment letterFile: 5 Allotment Letter and AFS.pdf30 Jul 2017
Layout approvalFile: 4 IOD Plan.pdf29 Jul 2017
Building plan approvalFile: 13 IOD Letter.pdf29 Jul 2017
PAN CardFile: 1 Pan Card Skylark.pdf29 Jul 2017
Copy of the legal title reportFile: 2 Title Certificate.pdf29 Jul 2017
Details of encumbrancesFile: 3 Encumbrances.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 4 IOD Plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: 13 IOD Letter.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 12 CC Letter.pdf29 Jul 2017
Declaration in FORM BFile: 6 Declaration Skylark.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Architects Certificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Engineer Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: 9 CA Skylark.pdf29 Jul 2017
Certificates of CA (Form 3)File: 9 CA JPICL.pdf29 Jul 2017

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise4 not delivered by the promised date8 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JP CONNECT-MIRAROADPC1330002502082VINAY NAGAR, Thane624Jan 2026OngoingDec 2032Not due yet
The Palace Tower AP51700078483VINAY NAGAR, Thane567Dec 2024OngoingDec 2031Not due yet
North Westend Tower 2P51700079721BHAYANDER, Thane308Mar 2025OngoingDec 2031Not due yet
Codename StarLifeP51700054275Bhayander East, Thane1,539Jan 2024OngoingDec 2031Not due yet
North Westend Tower 1P51700053522Bhayander, Thane865Nov 2023OngoingDec 2029Not due yet
The Palace Tower CP51700033431Vinay Nagar, Thane637Feb 2022OngoingDec 2028Not due yet
The Palace Tower BP51700033430Vinay Nagar, Thane942Feb 2022OngoingDec 2028Not due yet
JP North AvivaP51700023940Vinay Nagar, Thane-Jan 2020Certificate SignedDec 2026Not due yet
JP North Imperia - Tower 2P51700019783Near Vinay Nagar, Thane-Mar 2019CompletedDec 2025Dec 2025
JP North Imperia - Tower 1P51700019613Near Vinay Nagar, Thane-Feb 2019CompletedDec 2025Dec 2025
JP North EuphoriaP51700016290Vinaynagar, Thane-May 2018Certificate SignedDec 2025Not delivered
JP North AlexaP51700016736near Vinay Nagar, Thane-Jun 2018Certificate SignedDec 2025Not delivered
JP North ElaraP51700007001Vinaynagar, Thane-Aug 2017Certificate SignedJun 2022Not delivered
JP North EstellaP51700008916Vinaynagar, Thane-Aug 2017Certificate SignedDec 2021Not delivered

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JP North Atria on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vinaynagar7,600+ in Thane

2 kmJP North AtriaCompleted 80Lapsed / revoked 63Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: JP Infra Realty Private Limited

JP Infra Realty Private Limited has 17 registrations on MahaRERA, including JP North Estella and JP North Atria. Its filings disclose 15 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JP North Atria is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JP North Atria?

The registered promoter entity is JP Infra Realty Private Limited, a company as per the filing. Its CIN U45200MH2010PTC206022 and GSTIN 27AAOCS9607A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JP North Atria?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JP North Atria?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JP North Atria?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in JP North Atria?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JP North Atria. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JP North Atria to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.