Home / Browse projects / Thane, Maharashtra / Cloud 36 -Phase I

Completed No litigation declared Residential / Group Housing project

Cloud 36 -Phase I

By GeeCee Ventures Limited

RG-MH-10111 · RERA P51700001178 · Last updated on MahaRERA portal: 5 Jul 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 7 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Cloud 36 -Phase I is a Residential / Group Housing project by GeeCee Ventures Limited in Thane, Maharashtra, registered with MahaRERA as P51700001178 on 27 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018.

At a glance

Project

  • NameCloud 36 -Phase I
  • TypeResidential / Group Housing
  • Location
    • Sector 11
    • Ghansoli
    • Navi Mumbai (M Corp.)
    • Thane
    • 400701
  • Pincode400701
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001178
  • ReraGenie IDRG-MH-10111

Builder

  • NameGeeCee Ventures Limited
  • Entity typeCompany
  • CINL24249MH1984PLC032170
  • GSTIN27AAACG3914A1Z7
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Non- Executive DirectorRohit Ashwin Kothari
  • Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
  • Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
  • Other registrations10 more →
  • Completed7 of 11
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings3 building records
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-WingNA400000
B-WingNA400000
C- WingNA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

A-Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B-Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C- Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities23

As on 5 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Swimming poolYes0%
Society OfficeYes0%
Landscape GardenYes0%
Jogging TrackYes0%
GymnasiumYes0%
Club HouseYes0%
Children Play AreaYes0%
CCTV Surveillance in Common AreaYes0%

Parking filed370

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots370
Closed/Covered370
BuildingClosed/CoveredTotal
A-Wing132132
B-Wing119119
C- Wing119119

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,717 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13621.73
Proposed, not sanctioned13,622 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 13 and 14 Shree Manoshi Apts Sector-3 Plot No 5 and 6 Ghansoli West Navi Mumbai 400701

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSatish V Ahuja & Associates (Consulting Architect)
ArchitectHafeez Contractor (Design Architect)
EngineerMahimtura Consultants Pvt. Ltd.
PartnerRole in project
GeeCee Ventures Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jul 2023

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: Legal Litigation.pdf5 Jul 2023
Details of encumbrances concerned to LegalFile: Legal Litigation.pdf5 Jul 2023
Declaration about Commencement CertificateFile: CC.pdf5 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1920.pdf5 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2021.pdf5 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2122.pdf5 Jul 2023
CERSAI detailsFile: CERSAI.pdf5 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1819.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1920.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2021.pdf5 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2122.pdf5 Jul 2023
Proforma of Agreement for saleFile: Proforma.pdf5 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf5 Jul 2023
Status of ConveyanceFile: Leased Deed8.pdf5 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank.pdf5 Jul 2023
Foreclosure of the ProjectFile: Forecloure.pdf5 Jul 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf5 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation model copy of Agreement.pdf5 Jul 2023
Certificates of CA (Form 5)File: CLOUDE 36 PHAE 1Geecee_ Rera Form-5.pdf12 Dec 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Regn Certificate.pdf4 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 -PHASE I.pdf2 Jun 2018
Certificates of CA (Form 3)File: FORM 3- CL 36 -I.pdf2 Jun 2018
Certificates of Architect (Form 4)File: Form -4 Architect Cert.pdf2 Jun 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society -Application Form.pdf9 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 .pdf3 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf3 Apr 2018
Certificates of CA (Form 3)File: FORM 3 .pdf3 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: NMMC Amend CC.pdf28 Feb 2018
OtherFile: OC.pdf28 Feb 2018
Layout approvalFile: 0001.pdf29 Nov 2017
Layout approvalFile: 002.pdf29 Nov 2017
Layout approvalFile: 0003.pdf29 Nov 2017
Layout approvalFile: 0004.pdf29 Nov 2017
Layout approvalFile: 0005.pdf29 Nov 2017
Layout approvalFile: 0006.pdf29 Nov 2017
Layout approvalFile: 0007.pdf29 Nov 2017
Layout approvalFile: 0008.pdf29 Nov 2017
Layout approvalFile: 0009.pdf29 Nov 2017
Layout approvalFile: 0010.pdf29 Nov 2017
Layout approvalFile: 0011.pdf29 Nov 2017
Layout approvalFile: 0012.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0001.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 002.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0003.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0004.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0005.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0006.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0007.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0008.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0009.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0010.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0011.pdf29 Nov 2017
Copy of Layout Approval (in case of layout)File: 0012.pdf29 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: NMMC-CERTIFICATE.pdf23 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf23 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate-Phase-I.pdf26 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate-Phase-I.pdf26 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate -Form 2.pdf26 Oct 2017
Certificates of CA (Form 3)File: CA Certificate .pdf26 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- PHASE-I-Engineer's certificate.pdf25 Jul 2017
Certificates of CA (Form 3)File: Certificate - RERA.pdf25 Jul 2017
Proforma of Allotment letterFile: PHASE I -AGREEMENT AND ALLOTMENT LETTER.pdf25 Jul 2017
Building plan approvalFile: DECLARATION IOD PHASE I.pdf24 Jul 2017
Layout approvalFile: 14_01.pdf24 Jul 2017
Layout approvalFile: 14_02.pdf24 Jul 2017
Layout approvalFile: 14_03.pdf24 Jul 2017
Layout approvalFile: 14_04.pdf24 Jul 2017
Layout approvalFile: 14_05.pdf24 Jul 2017
Layout approvalFile: 14_06.pdf24 Jul 2017
Layout approvalFile: 14_07.pdf24 Jul 2017
Layout approvalFile: 14_08.pdf24 Jul 2017
Layout approvalFile: 14_09.pdf24 Jul 2017
Layout approvalFile: 14_10.pdf24 Jul 2017
Layout approvalFile: 14_11.pdf24 Jul 2017
Layout approvalFile: 14_12.pdf24 Jul 2017
Layout approvalFile: 14_13.pdf24 Jul 2017
Layout approvalFile: 14_14.pdf24 Jul 2017
PAN CardFile: GEECEE PAN.pdf24 Jul 2017
Copy of the legal title reportFile: TITLE REPORT- CLOUD 36.pdf24 Jul 2017

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PROXIMUSP51800027318CHEMBUR, Mumbai Suburban37Dec 2020CompletedJun 2025Mar 2024
Laxmi KunjP51800046721JUHU, Mumbai Suburban-Sep 2022CompletedDec 2024Nov 2024
GeeCee Aspira 206P52000019788Navi Mumbai, Raigarh149Mar 2019CompletedAug 2024Registered original: Aug 2023Sep 2023
The Mist Phase IIP52000024728Dahiwali T. Waredi, Raigarh-Mar 2020CompletedDec 2022Aug 2022
The Mist -Phase IP52000007101Dahiwali T. Waredi, Raigarh-Aug 2017CompletedSep 2020Sep 2020
Cloud 36-Phase IIP51700004872Ghansoli, Thane-Aug 2017CompletedDec 2018Jul 2018
Cloud 36 -Phase IPlot No. 6 Sector 11. Ghansoli Node252-CompletedDec 2018Feb 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Cloud 36 -Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghansoli7,600+ in Thane

2 kmCloud 36 -Phase ICompleted 29Lapsed / revoked 4Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: GeeCee Ventures Limited

GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Cloud 36 -Phase I is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Cloud 36 -Phase I?

The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Cloud 36 -Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Cloud 36 -Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Cloud 36 -Phase I?

The professionals named in the filing: Architect: Satish V Ahuja & Associates (Consulting Architect); Architect: Hafeez Contractor (Design Architect); Engineer: Mahimtura Consultants Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Cloud 36 -Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Cloud 36 -Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Cloud 36 -Phase I to a free account