Home / Browse projects / Thane, Maharashtra / Goldcrest Residency - Phase 2
Goldcrest Residency - Phase 2
RG-MH-24985 · RERA P51700010579 · Last updated on MahaRERA portal: 11 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 92 complaints at MahaRERA
- Completion date moved by 69 months
- 7 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Goldcrest Residency - Phase 2 is a Residential / Group Housing project by SAVITA HOMEMAKERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700010579 on 31 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 69 months from the original filing. 316 of the 316 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete. 92 complaints are on record with the regulator.
At a glance
Project
- NameGoldcrest Residency - Phase 2
- TypeResidential / Group Housing
- Location
- NEW PALM BEACH ROAD
- GHANSOLI
- Navi Mumbai (M Corp.)
- Thane
- 400701
- Pincode400701
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700010579
- ReraGenie IDRG-MH-24985
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 30 Jun 2021)
- Buildings3 building records
- Documents filed224 files
Current status
Figures as on 11 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Harmony - Wing B | NA | 30 | 25 | 91 | 0 | 91 |
| Peace - Wing C | NA | 30 | 25 | 134 | 0 | 134 |
| Pride - Wing A | NA | 30 | 25 | 91 | 0 | 91 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 97%.
Harmony - Wing B98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 96% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 94% |
Peace - Wing C96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 81% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 91% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92% |
Pride - Wing A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 96% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 93% |
Progress on shared amenities15
As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 96% |
| Water Supply | Yes | 88% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | Yes | 93% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 97% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 91% |
| Electrical meter room, sub-station, receiving station | Yes | 93% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed307
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Harmony - Wing B | 88 | 0 | 88 |
| Peace - Wing C | 130 | 1 | 131 |
| Pride - Wing A | 88 | 0 | 88 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Peace - Wing C | NA | Rs 42.34 cr | Rs 34.49 cr |
| Harmony - Wing B | NA | Rs 31.21 cr | Rs 28.78 cr |
| Pride - Wing A | NA | Rs 31.07 cr | Rs 28.45 cr |
| - | NA | Rs 30.19 cr | Rs 27.49 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Soyuz Talib |
| Engineer | Ali Abbas Jaffrey |
| Chartered Accountant | K KAveria and Co. |
| Chartered Accountant | Nitesh Jain |
| Partner | Role in project |
|---|---|
| SAVITA HOMEMAKERS LLP | - |
Extensions applied for7
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterForce Majeure as defined under RERA to mean "a case of war, flood, drought, fire, cyclone, earthquake or any other calamity caused by nature affecting the regular development of the real estate project". The Govt., looking at the COVID scenario across the country since March 2020 have already declared the current pandemic as force majeure adversely affecting development of real estate projects. The ongoing pandemic situation which resulted in reverse migration of the workers to their native places and break in supply chain of the construction material causing an adverse impact on the construct
Reason as filed by the promoterDue to space constraint the Reasons for Extension of the Project has been uploaded hereunder. You are requested to kindly go thru the same & accord your consent for Extension of the Project. We sincerely assure your good offices that the Project would be completed along with O.C & all amenities as mentioned well within Dec 2023.
Reason as filed by the promoterPhase II comprise Wing A, B &C of which Wing A&B Part OC upto 26th Floor has been received on 11th July 2023. OC application for Wing C has already been made and all NOCs including CFO NOC, Health NOC, Debris NOC, Tree NOC, MHADA NOC etc have been obtained and OC is expected shortly. For obtaining the final OC and completion of balance amenities in the project, it is just and necessary to obtain RERA extension. Exigencies faced by the Promoter resulting delay in completion of the project include: i. Inclusive Housing Scheme imposed ii. COVID phase of 2 years creating unprecedented challenges i
Reason as filed by the promoterPhase II comprise Wing A, B &C of which Wing A&B Part OC has been received on 11th July 2023 and the possession of flats handed over. Further, application for OC for Balance area is currently under process. For obtaining the final OC and completion of balance amenities in the project, it is deemed necessary to obtain RERA extension so that all approvals can be obtained during the project validity. Impediments/ exigencies faced by the Project Proponent in the past from time to time resulting delay in completion of amenities/construction mentioned hereunder: i. Inclusive Housing Scheme imposed c
Reason as filed by the promoterPhase II comprise Wing A, B &C of which Wing A&B Part OC upto 26th Floor has been received on 11th July 2023. OC application for Wing C has already been made and all NOCs including CFO NOC, Health NOC, Debris NOC, Tree NOC, MHADA NOC etc have been obtained and OC is expected shortly. For obtaining the final OC and completion of balance amenities in the project, it is just and necessary to obtain RERA extension. Exigencies faced by the Promoter resulting delay in completion of the project include: i. Inclusive Housing Scheme imposed ii. COVID phase of 2 years creating unprecedented challenges i
Reason as filed by the promoterPhase II comprise Wing A, B &C of which Wing A&B Part OC upto 26th Floor has been received on 11th July 2023. An OC application for Wing C has already been made and all NOCs including CFO NOC, Health NOC, Debris NOC, Tree NOC, MHADA NOC etc have been obtained. Part OC for C Wing is expected shortly. For obtaining the final OC and completion of balance amenities in the project, it is just and necessary to obtain RERA extension. Exigencies faced by the Promoter resulting delay in completion of the project include: (i) Inclusive Housing Scheme imposed ii. COVID phase of 2 years creating unprecede
Reason as filed by the promoterPhase II comprises Wings A, B, and C. Full applications for Occupancy Certificate (OC) have been submitted for all three wings. In respect of Wings A and B, Part Occupancy Certificate has been received up to the 26th floor on 11th July 2023. In respect of Wing C, Part Occupancy Certificate has been received up to the 20th floor on 1st July 2025. In order to obtain the Final Occupancy Certificate for the entire Phase II project and to complete the balance amenities, it is just, necessary, and in the interest of justice that an extension of the project registration under RERA be granted. Exigenc
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 000385/2016 | Supreme Court of India | to be listed for final hearing before the regular bench |
| 97/2015 | High court of Bombay | to be listed for final hearing before the regular bench |
Complaints filed with MahaRERA92
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000192330 | Sheetal Shirke | Savita Homemakers LLP | 08/09/2020 |
| CC006000000193706 | Bharat Kudalkar | Savita Homemakers LLP | 12/08/2020 |
| CC006000000195050 | MAHESH SHIVAJI DIGHE | M/S. SAVITA HOMEMAKERS LLP | 01/12/2020 |
| CC006000000198702 | Sandeep Satyawan Parab | Savita Home Makers LLP | 17/10/2021 |
| CC006000000199170 | Laxmikant Kolge,Suchitra Kolge | Savita Home Makers LLP | 28/11/2021 |
| CC006000000209942 | Rohan Darekar, Lata Darekar | Savita Homemakers LLP | 07/02/2022 |
| CC006000000398053 | Rohan Rohidas Darekar | Savita Homemakers LLP | 03/11/2023 |
| CC006000000210412 | Mr.Bajirao Kolhe Mrs Manisha Kolhe | savita homemaker llp | 15/03/2022 |
| CC006000000210423 | Savita Homemakers LLP | Sandeep Parab | 17/03/2022 |
| CC006000000540732 | Akkshay Jain | Sandeep Satyawan Parab | 10/06/2024 |
| CC006000000591532 | Akkshay Jain | MAYUR RAMCHANDRA AKADE | 13/08/2024 |
| CC006000000591534 | Akkshay Jain | LAXMIKANT POPAT KOLGE | 13/08/2024 |
| CC006000000220642 | Suraj Bhushannawar | SAVITA HOMEMAKERS LLP | 31/03/2022 |
| CC006000000220709 | Oawis Idris | Savita Homemakers LLP | 25/04/2022 |
| CC006000000220853 | Nikhil Rao | M/s Savita Homemakers LLP | 17/04/2022 |
| CC006000000220895 | Arunkumar Upendra Rai | M/s Savita Homemakers LLP | 20/04/2022 |
| CC006000000220947 | Tushar korgaonkar | Savita Home Makers LLP | 24/04/2022 |
| CC006000000398062 | Tushar korgaonkar | Savita Homemakers LLP | 04/11/2023 |
| CC006000000221106 | Vijay Chavan | Savita Home Makers LLP | 06/05/2022 |
| CC006000000398037 | Vijay Chavan | SAVITA HOMEMAKERS LLP | 01/11/2023 |
| CC006000000221107 | chandrakant Khare | Savita Home Makers LLP | 06/05/2022 |
| CC006000000398059 | chandrakant Khare | Savita Homemakers LLP | 03/11/2023 |
| CC006000000231283 | Mayur Ramchandra Akhade | M/s Savita Homemakers LPP | 24/05/2022 |
| CC006000000251359 | Sri Rama Chandra Murty Joka | Savita Homemakers LLP | 05/06/2022 |
| CC006000000251411 | Jeevan Jain | Savita Home Makers LLP | 10/06/2022 |
| CC006000000292400 | Raviteja Yanamandra | Savita Home Makers LLP | 19/08/2022 |
| CC006000000292745 | Hitesh Dhanraj Paliwal | Savita Homemakers LLP | 19/09/2022 |
| CC006000000292746 | Naresh Dhanraj Paliwal | Savita Homemakers LLP | 19/09/2022 |
| CC006000000302931 | udhayasankar shanmugasundaram | Savita Homemakers LLP | 05/10/2022 |
| CC006000000398057 | udhayasankar shanmugasundaram | Savita Homemakers LLP | 03/11/2023 |
| CC006000000303168 | ramkrishna kamath | Savita Home Makers LLP | 28/10/2022 |
| CC006000000303761 | Harshal Sonawane | Savita Home Makers LLP | 22/12/2022 |
| CC006000000323766 | Arun Agrawal | Savita Homemakers LLP | 23/12/2022 |
| CC006000000333878 | Shivanand katakdhond | Savita Home makers LLP | 03/01/2023 |
| CC006000000333954 | shailesh d | Savita Home makers LLP | 14/01/2023 |
| CC006000000364585 | Parag Shringarpure | Savita Homemakers LLP | 03/03/2023 |
| CC006000000374848 | Maninder Singh Bhumra | Savita Homemakers LLP | 20/03/2023 |
| CC006000000374910 | mohandas shetty | Savita Home makers LLP | 23/03/2023 |
| CC006000000374967 | Bhanudas Nakade | Savita Homemakers LLP | 27/03/2023 |
| CC006000000374989 | Deepak Roundhal | Savita Home Makers LLP | 28/03/2023 |
| CC006000000375315 | Mahesh Ashok Morde | Savita Homemakers LLP | 18/04/2023 |
| CC006000000375400 | Avinash Patil | Savita Homemakers LLP | 26/04/2023 |
| CC006000000375385 | Dinesh Bhanushali | Savita Homemakers LLP | 24/04/2023 |
| CC006000000375381 | Shivaji Minde | Savita Homemakers LLP | 24/04/2023 |
| CC006000000375387 | maruti minde | Savita Homemakers LLP | 25/04/2023 |
| CC006000000395504 | mayur pawar | Savita Homemakers LLP | 03/05/2023 |
| CC006000000395509 | namrata desai | Savita Homemakers LLP | 03/05/2023 |
| CC006000000395525 | Akash Ghadge | Savita Homemakers LLP | 04/05/2023 |
| CC006000000395542 | Meraj Khan | Savita Homemakers LLP | 05/05/2023 |
| CC006000000395840 | yash gajra | Savita Home Makers LLP | 17/05/2023 |
| CC006000000395838 | Ayandeep M | Savita Home Makers LLP | 17/05/2023 |
| CC006000000395851 | Vaibhav Jadhav | Savita Home Makers LLP | 18/05/2023 |
| CC006000000395995 | Dinesh R Somani | Savita Home Makers LLP | 30/05/2023 |
| CC006000000395996 | Suresh P Mantri | Savita Home Makers LLP | 30/05/2023 |
| CC006000000395992 | Harsh Sethi | Savita Home Makers LLP | 30/05/2023 |
| CC006000000395994 | Nirupam Chowdhury | Savita Home Makers LLP | 30/05/2023 |
| CC006000000396043 | Vishal v Prasade | Savita Home Makers LLP | 02/06/2023 |
| CC006000000396104 | Amit Uttam sarang | Savita Home Makers LLP | 07/06/2023 |
| CC006000000396191 | Bhavna Thakur | Savita Home Makers LLP | 14/06/2023 |
| CC006000000396228 | Swati Tawde | Savita Home Makers LLP | 15/06/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Jul 2023
Documents filed224
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 224 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Q4-Form 1 architects certificate_03-04-2026.pdf | 11 May 2026 |
| Withdrawal Update Form 2File: GCR PHASE II RERA FORM 2 For MARCH 2026.pdf | 11 May 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 25-26.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: Q3-Form 1 architects certificate_17-04-2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Q3-Form 1 architects certificate_17-04-2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: GCR PHASE II RERA FORM 2 For DEC 2025.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: GCR PHASE II RERA FORM 2 For DEC 2025.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 25.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 DEC 25.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Q1-Form 1 architects certificate_17-04-2026_Scan.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: Q2-Form 1 architects certificate_17-04-2026.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: GCR PHASE II RERA FORM 2 For JUNE 2025.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: GCR PHASE II RERA FORM 2 For SEPT 2025.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 JUNE 25.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 SEPT 25 .pdf | 18 Apr 2026 |
| Form 1File: Q4 Architech Certificate Form1.pdf | 30 Jun 2025 |
| Form 2File: Q4 Engineer Certificate Form2.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q4 Sold Unsold data 2025.pdf | 30 Jun 2025 |
| OthersFile: Q4 Quality Certificate Form 2A.pdf | 30 Jun 2025 |
| Form 3File: Q4 CA Certificate From 3 c.pdf | 30 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration MArch 2025.pdf | 30 Jun 2025 |
| Declaration in FORM BFile: form B REVISED.pdf | 7 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA FORM 1 GCR Sep 2024.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: GCR A WING SOLD UNSOLD Inventory till Sep 2024.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: GCR B WING SOLD UNSOLD Inventory till Sep 2024.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: GCR C WING SOLD UNSOLD Inventory till Sep 2024.pdf | 27 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2A GCR Sep 2024.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: GCR PHASE II ALL WING SOLD UNSOLD LIST FOR JUNE 2024.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: GCR PHASE II ALL WING SOLD UNSOLD LIST FOR DEC 2023_.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: GCR PHASE II ALL WING SOLD UNSOLD LIST FOR March 2024_.pdf | 11 Jul 2024 |
| Declaration in FORM BFile: Form B New.pdf | 10 Jul 2024 |
| Layout approvalFile: 19 20 sheet to upload.pdf | 9 Jul 2024 |
| Layout approvalFile: 21 22 sheet to upload.pdf | 9 Jul 2024 |
| Layout approvalFile: 23 24 sheet to upload.pdf | 9 Jul 2024 |
| Layout approvalFile: 25 26 sheet to upload.pdf | 9 Jul 2024 |
| Layout approvalFile: 27 28 sheet to upload.pdf | 9 Jul 2024 |
| Layout approvalFile: 29 30 sheet to upload.pdf | 9 Jul 2024 |
| Layout approvalFile: 31 32 33 sheet to upload.pdf | 9 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Form B Declaration 01_07_2024-4.pdf | 9 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Form B Declaration 01_07_2024-4.pdf | 9 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 19 20 sheet to upload.pdf | 9 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 21 22 sheet to upload.pdf | 9 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 23 24 sheet to upload.pdf | 9 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 25 26 sheet to upload.pdf | 9 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 27 28 sheet to upload.pdf | 9 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 29 30 sheet to upload.pdf | 9 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 31 32 33 sheet to upload.pdf | 9 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GCR PHASE II RERA FORM 1 For DEC 2023.pdf | 9 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GCR PHASE II RERA FORM 1 For March 2024.pdf | 9 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA June 2024.pdf | 9 Jul 2024 |
| Layout approvalFile: 15 18 sheet to upload.pdf | 8 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 15 18 sheet to upload.pdf | 8 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GCR RERA FORM 2 For Dec 2023.pdf | 8 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GCR RERA FORM 2 For March 2024.pdf | 8 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -1 of 33_BUA calculation Sheet _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -2 of 33_Ground Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -3 of 33_First Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -4 of 33_Second Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -5 of 33_Third Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -6 of 33_Layout Plan _plot area _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -7 of 33_BUA calculation for commercial _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -8 of 33_BUA Ground floor _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -9 of 33_BUA 1st floor podium _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -10 of 33_BUA 2nd floor podium _19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -11 of 33_BUA 3rd floor podium_19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -12 of 33_BUA Typical floor podium_19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -13 of 33_Block Plan_19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -14 of 33_Typical floor Layout Plan_19-03-2019.pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -16 of 33_19-03-2019 (4).pdf | 6 Jul 2024 |
| Building plan approvalFile: 40_GCR_amend CC_sheet -17 of 33_21st floor Layout Plan_19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -1 of 33_BUA calculation Sheet _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -2 of 33_Ground Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -3 of 33_First Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -4 of 33_Second Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -5 of 33_Third Floor Plan _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -6 of 33_Layout Plan _plot area _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -7 of 33_BUA calculation for commercial _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -8 of 33_BUA Ground floor _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -9 of 33_BUA 1st floor podium _19-03-2019.pdf | 6 Jul 2024 |
| Building Plan Approval (IOD)File: 40_GCR_amend CC_sheet -10 of 33_BUA 2nd floor podium _19-03-2019.pdf | 6 Jul 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| FOUR SEASONS | PLOT NO 2 and 3 SECTOR 12 VASHI NAVI MUMBAI | 10 | Completed | Jan 2009 | Jan 2009 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 224 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Goldcrest Residency - Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GHANSOLI7,600+ in Thane
Filed coordinates, straight-line distance. 60 registered projects within 2 km.
Aveon City Building B
Balaji Tricity Realty LLP
The Elements
TPV Ventures LLP
ORBIS PHASE 1
INFOPARK DEVELOPERS PRIVATE LIMITED
ALLIAANCE THE VIEW
ALLIAANCE REALTY
NEELKANTH PALM PRESIDENT
NEELKANTH INFRATECH
NEELKANTH PALM AVENUE
NEELKANTH INFRATECH
See every Thane project, with the district possession charts
Builder: SAVITA HOMEMAKERS LLP
SAVITA HOMEMAKERS LLP has 2 registrations on MahaRERA, including GOLDCREST RESIDENCY - PHASE 1 and Goldcrest Residency - Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Goldcrest Residency - Phase 2 is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Goldcrest Residency - Phase 2?
The registered promoter entity is SAVITA HOMEMAKERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Goldcrest Residency - Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Goldcrest Residency - Phase 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Goldcrest Residency - Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Goldcrest Residency - Phase 2?
The professionals named in the filing: Architect: Soyuz Talib; Engineer: Ali Abbas Jaffrey; Chartered Accountant: K KAveria and Co.; Chartered Accountant: Nitesh Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Goldcrest Residency - Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback