Home / Browse projects / Thane, Maharashtra / The Elements

Registered No litigation declared Others project

The Elements

By TPV Ventures LLP

RG-MH-31279 · RERA P51700079613 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 248.40 crore secured on the land, in favour of TPV Infra

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
5 of 66Construction stages doneacross 6 buildings; furthest along: Plinth, 90%
487 of 581Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

The Elements is a Others project by TPV Ventures LLP in Thane, Maharashtra, registered with MahaRERA as P51700079613 on 17 Mar 2025. Possession is promised by 31 Dec 2031. 94 of the 581 units on this registration are recorded sold or booked, and 5 of 66 construction stages are filed complete.

At a glance

Project

  • NameThe Elements
  • TypeOthers
  • Location
    • Sector 11
    • Ghansoli
    • Navi Mumbai (M Corp.)
    • Thane
    • 400701
  • Pincode400701
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700079613
  • ReraGenie IDRG-MH-31279

Builder

  • NameTPV Ventures LLP
  • Entity typePartnership
  • GSTIN27AASFT3914G1ZU
  • PartnersGanesh Valji Vaid, Mahadev Pragji Gothi, Everest Nisarg Greenland Developers Private Limited, Murji Bhanji Gami
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Mar 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings6 building records
  • Documents filed82 files

Current status

16%94 of 581 units booked
15.4%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA514082082
Wing BNA51461760176
Wing CNA514694094
Wing DNA514694094
Wing ENA514684084
CommercialNA6605151

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Plinth, at 90%.

Wing A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)36%
Plinth90%
Stilt Floor90%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D34%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E34%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1628

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,628
Closed/Covered959
Open Space669
BuildingClosed/CoveredOpen SpaceTotal
Wing A173105278
Wing B185117302
Wing C185117302
Wing D185117302
Wing E174105279
Commercial57108165

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area13,513 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTPV Infra
Secured amountRs 248.40 crore
CERSAI search filedYes
Declared on14 Jun 2025

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI85095.8
Proposed, not sanctioned80,096 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch.5 C/ II, MITTAL COURT,224, NARIMAN POINT,MUMBAI - 400 021
Estimated costRs 394.02 cr
Cost incurredRs 60.74 cr
Work done15.41%
BuildingWingEstimatedIncurred
Wing ANARs 64.02 crRs 10.12 cr
Wing BNARs 64.02 crRs 10.12 cr
Wing CNARs 64.02 crRs 10.12 cr
Wing DNARs 64.02 crRs 10.12 cr
Wing ENARs 64.02 crRs 10.12 cr
CommercialNARs 64.02 crRs 10.12 cr
-NARs 9.90 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLena Krishna Gosavi
EngineerM/s J.W. Consultants LLP
EngineerSK Consultants & Engineers
Chartered AccountantVikas Abhang & Associates
Chartered AccountantN B Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
TPV Ventures LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - The Elements as on Sept 2025.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 - The Elements as on Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - The Elements as on 30-09-2025.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 - The Elements as on 31-12-2025.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3- The Elements as on March 2026.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1- The Elements as on March 2026.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2- The Elements as on March 2026.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3- The Elements as on March 2026.pdf16 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 - The Elements FY 2024-25.pdf2 Jan 2026
Form 1File: Form 1 - The Elements as on March 2025.pdf6 Sep 2025
Form 2File: Form 2 - The Elements as on March 2025.pdf6 Sep 2025
Form 3File: Form 3 - The Elements as on March 2025.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - The Elements as on March 2025.pdf6 Sep 2025
Withdrawal Update Form 1File: Form 1 - The Elements as on June 2025.pdf4 Sep 2025
Withdrawal Update Form 1File: Form 1 - The Elements as on June 2025.pdf4 Sep 2025
Withdrawal Update Form 2File: Form 2 - The Element as on June 2025.pdf4 Sep 2025
Withdrawal Update Form 2File: Form 2 - The Element as on June 2025.pdf4 Sep 2025
Withdrawal Update Form 3File: Form 3 - The Elements as on 30-06-2025.pdf4 Sep 2025
Withdrawal Update Form 3File: Form 3 - The Elements as on 30-06-2025.pdf4 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - The Elements as on March 2025.pdf20 Apr 2025
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance (1).pdf4 Mar 2025
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance (1).pdf4 Mar 2025
Other - TechnicalFile: 1 Other - Technical (3).pdf4 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (4).pdf4 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf4 Mar 2025
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (2).pdf1 Mar 2025
Layout approvalFile: layout plan tpv_compressed.pdf5 Feb 2025
Building plan approvalFile: layout plan tpv_compressed.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part2_2_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part3_3_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part4_4_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part5_5_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part6_6_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part7_7_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part8_8_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part9_9_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part10_10_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part11_11_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part12_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part13_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part14_11zon.pdf5 Feb 2025
Building plan approvalFile: PLAN_Part15_11zon.pdf5 Feb 2025
Copy of Layout Approval (in case of layout)File: layout plan tpv_compressed.pdf5 Feb 2025
Proforma of Allotment letterFile: AL_TPV Ventures LLP 10012025.pdf5 Feb 2025
Declaration in FORM BFile: FORM-B Affidavit Cum Declaration - Noterized.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part11_11_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part15_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part14_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part13_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part12_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part10_10_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part9_9_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part7_7_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part6_6_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part5_5_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part4_4_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part3_3_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part2_2_11zon.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: layout plan tpv_compressed.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: PLAN_Part8_8_11zon.pdf5 Feb 2025
Other - LegalFile: LEASE AGREEMENT (Pl-8 sec-11 Ghansoli)_compressed (1).pdf5 Feb 2025
Other - FinanceFile: Declaration-The Elements.pdf5 Feb 2025
Proforma of Agreement for saleFile: AFS.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3-The Elements.pdf4 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: TPV VENTURES LETTER.pdf4 Feb 2025
PAN CardFile: TPV Ventures LLP PAN CARD.pdf30 Jan 2025
Copy of the legal title reportFile: Short Title_TPV Ventures LLP 10012025_11zon.pdf30 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC CERT.pdf30 Jan 2025
CERSAI detailsFile: Cersai Report-The Elements.pdf30 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A).pdf30 Jan 2025
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (2).pdf30 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf30 Jan 2025

How this compares with Thane

16%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Elements on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghansoli7,600+ in Thane

2 kmThe ElementsCompleted 20Lapsed / revoked 3Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: TPV Ventures LLP

TPV Ventures LLP has 2 registrations on MahaRERA, including Down Town Avenue and The Elements. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if The Elements is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Elements?

The registered promoter entity is TPV Ventures LLP, a partnership as per the filing. Its GSTIN 27AASFT3914G1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Elements?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Elements?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Elements?

The professionals named in the filing: Architect: Lena Krishna Gosavi; Engineer: M/s J.W. Consultants LLP; Engineer: SK Consultants & Engineers; Chartered Accountant: Vikas Abhang & Associates; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Elements?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Elements. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Elements to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.