Home / Browse projects / Thane, Maharashtra / NEELKANTH PALM PRESIDENT

Registered No litigation declared Others project

NEELKANTH PALM PRESIDENT

By NEELKANTH INFRATECH

RG-MH-06433 · RERA P51700052965 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
153 of 361Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 154 documents Report an error

NEELKANTH PALM PRESIDENT is a Others project by NEELKANTH INFRATECH in Thane, Maharashtra, registered with MahaRERA as P51700052965 on 6 Oct 2023. Possession is promised by 31 Dec 2029. 208 of the 361 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameNEELKANTH PALM PRESIDENT
  • TypeOthers
  • Location
    • GHANSOLI PLOT NO 10
    • SECTOR 11
    • Navi Mumbai (M Corp.)
    • Thane
    • 400701
  • Pincode400701
  • RERA no.P51700052965
  • ReraGenie IDRG-MH-06433

Builder

  • NameNEELKANTH INFRATECH
  • Entity typePartnership
  • GSTIN27AASFN9973H1ZB
  • PartnersJAYANTI AMBA CHOUDHARY, HIRJI DEVJI VAVIYA, VALJI DEVJI VAVIYA
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Oct 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed154 files

Current status

58%208 of 361 units booked
30.5%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEELKANTH PALM PRESIDENT A-WINGNA524015618174
NEELKANTH PALM PRESIDENT B-WINGNA41281870187

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

NEELKANTH PALM PRESIDENT A-WING57%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NEELKANTH PALM PRESIDENT B-WING50%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed552

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots552
Closed/Covered552

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,336 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jun 2025

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI35528.01
Proposed, not sanctioned35,528 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAPE
Estimated costRs 139.99 cr
Cost incurredRs 42.72 cr
Work done30.52%
BuildingWingEstimatedIncurred
NEELKANTH PALM PRESIDENT A-WINGNARs 72.80 crRs 24.71 cr
NEELKANTH PALM PRESIDENT B-WINGNARs 56.19 crRs 18.01 cr
-NARs 11.00 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATISH V AHUJA
ArchitectSATISH V. AHUJA & ASSOCIATES
EngineerMAHESH VASANT CHAUDHARI
EngineerHITEN HASMUKHLAL KHATRA
Chartered AccountantH M SHAH & ASSOCAITES
Chartered AccountantH. M. SHAH & ASSOCIATES
Chartered AccountantP. R. VORA & ASSOCIATES
PartnerRole in project
NEELKANTH INFRATECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed154

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 154 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4 25-26.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 Q4 25-26.pdf7 May 2026
Withdrawal Update Form 3File: Form3 Q4 25-26.pdf7 May 2026
Withdrawal Update Form 1File: FORM1 Q3 25-26.pdf30 Jan 2026
Withdrawal Update Form 2File: FORM2 Q3 25-26.pdf30 Jan 2026
Withdrawal Update Form 3File: Form3 Q3 25-26.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: FORM5 24-25.pdf31 Dec 2025
Withdrawal Update Form 1File: Form1 Q2 2025.pdf11 Nov 2025
Withdrawal Update Form 2File: Form2 Q2 2025.pdf11 Nov 2025
Withdrawal Update Form 3File: FORM3 Q2 2025 (2).pdf11 Nov 2025
Withdrawal Update Form 1File: FORM1.pdf19 Aug 2025
Withdrawal Update Form 2File: Form2.pdf19 Aug 2025
Withdrawal Update Form 3File: Form3.pdf19 Aug 2025
Withdrawal Update Form 1File: FORM1.pdf28 Jul 2025
Withdrawal Update Form 2File: Form2.pdf28 Jul 2025
Withdrawal Update Form 3File: Form3.pdf28 Jul 2025
Withdrawal Update Form 1File: FORM1.pdf23 Jul 2025
Withdrawal Update Form 2File: Form2.pdf23 Jul 2025
Withdrawal Update Form 3File: Form3.pdf23 Jul 2025
Form 1File: Form-1.pdf29 May 2025
Form 3File: Form 3 with sign.pdf29 May 2025
Form 2File: Form-2.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Inevntory sold letter (plot-10).pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sold Letter-march24.pdf29 May 2025
Form 1File: form 1.pdf29 May 2025
Form 2File: form 2.pdf29 May 2025
Form 3File: Form 3.pdf29 May 2025
Form 1File: FORM 1.pdf29 May 2025
Form 2File: Form 2.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sold Letter.pdf29 May 2025
Form 3File: Form 3 with sign.pdf29 May 2025
Form 1File: Final FORM 1.pdf29 May 2025
Form 3File: Final FORM 3.pdf29 May 2025
Form 2File: FORM 2.pdf29 May 2025
Form 5 (FY 2023-2024)File: Form 5 with sign.pdf29 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FInal FORM 1.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FInal FORM 3.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FInal FORM 2.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Aug 2024
Layout approvalFile: highlighted layout-1.pdf10 Aug 2024
Layout approvalFile: Lay out-2.pdf10 Aug 2024
Layout approvalFile: Lay out-3.pdf10 Aug 2024
Layout approvalFile: Lay out-4.pdf10 Aug 2024
Layout approvalFile: Lay out-5.pdf10 Aug 2024
Layout approvalFile: Lay out-6.pdf10 Aug 2024
Layout approvalFile: Lay out-7.pdf10 Aug 2024
Layout approvalFile: Lay out-8.pdf10 Aug 2024
Layout approvalFile: Lay out-9.pdf10 Aug 2024
Layout approvalFile: highlighted layout-10.pdf10 Aug 2024
Layout approvalFile: Lay out-11.pdf10 Aug 2024
Layout approvalFile: Lay out-12.pdf10 Aug 2024
Building plan approvalFile: Lay out-13.pdf10 Aug 2024
Building plan approvalFile: Lay out-14.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: highlighted layout-1.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-2.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-3.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-4.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-5.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-6.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-7.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-8.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-9.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: highlighted layout-10.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-11.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Lay out-12.pdf10 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Lay out-13.pdf10 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Lay out-14.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Inventory Sold Letter.pdf8 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 with sign.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf6 Aug 2024

How this compares with Thane

58%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELKANTH PALM PRESIDENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR 117,600+ in Thane

Builder: NEELKANTH INFRATECH

NEELKANTH INFRATECH has 2 registrations on MahaRERA, including NEELKANTH PALM PRESIDENT and NEELKANTH PALM AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NEELKANTH PALM PRESIDENT is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELKANTH PALM PRESIDENT?

The registered promoter entity is NEELKANTH INFRATECH, a partnership as per the filing. Its GSTIN 27AASFN9973H1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELKANTH PALM PRESIDENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEELKANTH PALM PRESIDENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELKANTH PALM PRESIDENT?

The professionals named in the filing: Architect: SATISH V AHUJA; Architect: SATISH V. AHUJA & ASSOCIATES; Engineer: MAHESH VASANT CHAUDHARI; Engineer: HITEN HASMUKHLAL KHATRA; Chartered Accountant: H M SHAH & ASSOCAITES; Chartered Accountant: H. M. SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELKANTH PALM PRESIDENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELKANTH PALM PRESIDENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELKANTH PALM PRESIDENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.