Home / Browse projects / Raigarh, Maharashtra / The Mist Phase II
The Mist Phase II
RG-MH-27913 · RERA P52000024728 · Last updated on MahaRERA portal: 5 Jul 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 6 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
The Mist Phase II is a Others project by GeeCee Ventures Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000024728 on 2 Mar 2020. The registration is recorded completed; possession was promised by 30 Dec 2022.
At a glance
Project
- NameThe Mist Phase II
- TypeOthers
- Location
- Konadavane Road
- Dahiwali T. Waredi
- Karjat
- Raigarh
- 410201
- Pincode410201
- RERA no.P52000024728
- ReraGenie IDRG-MH-27913
Builder
- NameGeeCee Ventures Limited
- Entity typeCompany
- CINL24249MH1984PLC032170
- GSTIN27AAACG3914A1Z7
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Non- Executive DirectorRohit Ashwin Kothari
- Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
- Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
- Other registrations10 more →
- Completed7 of 11
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Mar 2020
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A wing | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
A wing: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 95% |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Smt. Devayani Musale (M/S Design Direction) |
| Engineer | Girish Daiya |
| Chartered Accountant | MRB & Associates |
| Chartered Accountant | Sarda & Pareek |
| Partner | Role in project |
|---|---|
| GeeCee Ventures Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Aug 2022
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: Legal Litigation.pdf | 5 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Legal Litigation.pdf | 5 Jul 2023 |
| Declaration about Commencement CertificateFile: CC MIST.pdf | 5 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 5 Jul 2023 |
| CERSAI detailsFile: CERSAI.pdf | 5 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI.pdf | 5 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 1718.pdf | 5 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1819.pdf | 5 Jul 2023 |
| Proforma of Agreement for saleFile: PROFORMA.pdf | 5 Jul 2023 |
| Status of ConveyanceFile: MIST SOCIETY.pdf | 5 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf | 5 Jul 2023 |
| Foreclosure of the ProjectFile: Forecloure.pdf | 5 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter.pdf | 5 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report model.pdf | 5 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - GCVL The Mist - Phase (ii).pdf | 30 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2 Form 5 - GCVL The Mist - Phase (ii).pdf | 30 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: NONDANI PRAMANPATRA.pdf | 6 Sep 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC MIST PHASE II.pdf | 12 Aug 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Architect Certificate.pdf | 12 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AR CERT MIST PH II JUNE 2022.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ER CERT MIST PH II JUNE 2022.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY MIST PH II JUNE 2022.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT MIST PH II JUNE 2022new.pdf | 7 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-Architecht Certificate-Mist-II-Size Reduced.pdf | 7 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Mist P 2.pdf | 7 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-ENGINEERS CERTIFICATE- THE MIST.pdf | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: DETAILS OF UNSOLD INVENTORIES MIST PHASE II.pdf | 7 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Mist Phase II -March 2022.pdf | 7 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECHT CERTIFICATE.pdf | 7 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Mist Ph II.pdf | 7 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A ENGINEER CERTIFICATE_MIST PHASE ll.pdf | 7 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORIES GEECEE MIST PHASE ll.pdf | 7 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE MIST PHASE ll.pdf | 7 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AR CERT.pdf | 7 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Mist P 2 Sep 2021.pdf | 7 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Quality Assurance Certificate The Mist Phase II Sep 21.pdf | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf | 7 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE MIST PHASE 2 SEPT 2021.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5 The Mist II.pdf | 29 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-THE MIST.pdf | 13 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Mist P 2.pdf | 13 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A ENGINEERS CERTIFICATE-KARJAT.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY THE MIST.pdf | 13 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - 163__Geecee_RERA - June 2021_Mist Phase-II_Final.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: MIST PHASE II - Disclosure of Sold Inventory.pdf | 21 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MIST PHASE II.pdf | 28 May 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - QUALITY ASSURANCE Mist Phase II.pdf | 24 May 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory-Mist Phase II.pdf | 21 May 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - ER CERTIFICATE The Mist P 2.pdf | 20 May 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SUBSEQUENT WITHDRAWAL 050_Geecee_Rera Certificate - March 2021 - Mist Phase II_Fi | 20 May 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE.pdf | 22 Feb 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEER CERTIFICATE.pdf | 22 Feb 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE.pdf | 22 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SUBSEQUENT WITHDRAWAL OF MONEY.pdf | 22 Feb 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - The Mist Phase II.pdf | 27 Nov 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Mist Ph-II - Engineer certificate.pdf | 27 Nov 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_Quality Assurance certificate.pdf | 27 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 27 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - The Mist Phase II.pdf | 2 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase II Jun 20.pdf | 15 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Mist Ph II June 2020.pdf | 15 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mist Phase 2 Form 3 June 2020 .pdf | 15 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Mist Phase - II_Final (1).pdf | 17 Jul 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 The Mist P 2.pdf | 6 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A P2.pdf | 6 Jul 2020 |
| Layout approvalFile: LAYOUT.PDF | 15 Feb 2020 |
| Building plan approvalFile: IOD.pdf | 15 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.PDF | 15 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf | 15 Feb 2020 |
| PAN CardFile: GEECEE PAN.pdf | 3 Feb 2020 |
| Copy of the legal title reportFile: Title Certficate.pdf | 3 Feb 2020 |
| Details of encumbrancesFile: ENCUMRANCE CERTIFICATE.pdf | 3 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: A Wing CC.pdf | 3 Feb 2020 |
| Declaration in FORM BFile: FORM B.pdf | 3 Feb 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 3 Feb 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE MIST P II DEC 2019.pdf | 3 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Form 3.pdf | 3 Feb 2020 |
| Proforma of Allotment letterFile: Draft Agreement - The Mist - Phase II.pdf | 3 Feb 2020 |
| OtherFile: PLOT AREA DECL.pdf | 3 Feb 2020 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PROXIMUSP51800027318 | CHEMBUR, Mumbai Suburban | 37 | Dec 2020 | Completed | Jun 2025 | Mar 2024 |
| Laxmi KunjP51800046721 | JUHU, Mumbai Suburban | - | Sep 2022 | Completed | Dec 2024 | Nov 2024 |
| GeeCee Aspira 206P52000019788 | Navi Mumbai, Raigarh | 149 | Mar 2019 | Completed | Aug 2024Registered original: Aug 2023 | Sep 2023 |
| The Mist -Phase IP52000007101 | Dahiwali T. Waredi, Raigarh | - | Aug 2017 | Completed | Sep 2020 | Sep 2020 |
| Cloud 36-Phase IIP51700004872 | Ghansoli, Thane | - | Aug 2017 | Completed | Dec 2018 | Jul 2018 |
| Cloud 36 -Phase I | Plot No. 6 Sector 11. Ghansoli Node | 252 | - | Completed | Dec 2018 | Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 10 other registrations, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
Keep The Mist Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dahiwali T. Waredi5,900+ in Raigarh
Bellezza Woods
DOTOM BUILD SQUARE
Winds of Calm
Eiffel Lifespaces Pvt Ltd
PURANIK CITY SECTOR 2
Puranik Builders Limited
Foothills of Matheran P - 2
HOABL Impactum Land Private Limited
FLORENCE TOWN
BRIGHT DEVELOPERS
The Destination
DOVE BUILDMART PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: GeeCee Ventures Limited
GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if The Mist Phase II is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of The Mist Phase II?
The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in The Mist Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for The Mist Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at The Mist Phase II?
The professionals named in the filing: Architect: Smt. Devayani Musale (M/S Design Direction); Engineer: Girish Daiya; Chartered Accountant: MRB & Associates; Chartered Accountant: Sarda & Pareek. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in The Mist Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback