ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / GeeCee Aspira 206

Completed No litigation declared Others project

GeeCee Aspira 206

By GeeCee Ventures Limited

RG-MH-65978 · RERA P52000019788 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 6 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Aug 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
29 of 149Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

GeeCee Aspira 206 is a Others project by GeeCee Ventures Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000019788 on 5 Mar 2019. The registration is recorded completed; possession was promised by 28 Aug 2023. 120 of the 149 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameGeeCee Aspira 206
  • TypeOthers
  • Location
    • F3
    • Navi Mumbai
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000019788
  • ReraGenie IDRG-MH-65978

Builder

  • NameGeeCee Ventures Limited
  • Entity typeCompany
  • CINL24249MH1984PLC032170
  • GSTIN27AAACG3914A1Z7
  • Non- Executive DirectorRohit Ashwin Kothari
  • Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
  • Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
  • Other registrations10 more →
  • Completed7 of 11
  • Declared earlier projects7 →

Key dates

this monthRegisteredMar 2019PromisedAug 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Mar 2019
  • Promised completion28 Aug 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed130 files

Current status

81%120 of 149 units booked
81.9%Work done, per cost certificate

Figures as on 7 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GeeCee Aspira 206NA16012128149

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

GeeCee Aspira 206: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered1
Open Space7

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,520 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2024

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI6084.51
Proposed, not sanctioned6,085 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManekji Wadia Bldg Ground Floor Nanik Motwani Marg Fort Mumbai 400001
Estimated costRs 33.10 cr
Cost incurredRs 27.10 cr
Work done81.87%
BuildingWingEstimatedIncurred
GeeCee Aspira 206NARs 25.40 crRs 25.35 cr
-NARs 7.70 crRs 1.75 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Satish V Ahuja
EngineerMr Girish Daiya
Chartered AccountantSARDA & PAREEK LLP
Chartered AccountantMRB & Associates
Chartered AccountantSarda & Pareek
PartnerRole in project
GeeCee Ventures Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017380Aug 2023 → Aug 2024

Reason as filed by the promoterAs per the subject matter, the undersigned is hereby applying for availing extension of RERA registration in respect of one of our project - Geecee Aspira 206 located at Plot No. F3, Sector 06, New Panvel- East, Navi Mumbai at Panvel, Raigarh, 410 206 upto a period of (one) 1 year i.e. 27th August, 2024 as the registration will be expiring on 28th August, 2023.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Mar 2024

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure B - Form 5 - Annual Report -Aspira 206.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure B - Form 5 - Annual Report -Aspira 206.pdf7 Oct 2024
Form 2AFile: FORM-2A_Aspira 206 2A_signed.pdf20 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Letter - Aspira 206.pdf22 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 - ASPIRA 206.pdf22 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DeclarationOCSIGNED.pdf21 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 PROJECT COMPLETION ARCHITECT CERTIFICATE.pdf19 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 PROJECT COMPLETION ARCHITECT CERTIFICATE.pdf11 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ONLINE OC PDF 150923.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5ASPIRA2223.pdf12 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ASPIRAFORM1JUNE2023.pdf20 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ASPIRAFORM2JUNE2023.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: ASPIRASOLDUNSOLDJUNE2023SIGNED.pdf20 Jul 2023
Certificates of CA (Form 3)File: ASPIRAFORM3JUNE2023.pdf20 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Aspira206.pdf20 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aspira206 Form 2.pdf20 Apr 2023
Form 2AFile: Form 2A -Aspira.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Aspira.pdf20 Apr 2023
Certificates of CA (Form 3)File: Aspira Form 3.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect (Form1)-Aspira 206.pdf20 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Aspira206.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory-Aspira 206-Dec,22.pdf20 Jan 2023
Certificates of CA (Form 3)File: Form 3 Signed Aspira.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aspira 206 Form 1.pdf20 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Aspira206.pdf20 Oct 2022
Certificates of CA (Form 3)File: FORM 3.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - GCVL Aspira 206.pdf30 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 AR CERT ASPIRA206 JUNE 2022.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ER CERT ASPIRA206 JUNE 2022.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY ASPIRA206 JUNE 2022.pdf7 Jul 2022
Certificates of CA (Form 3)File: FORM 3 CA CERT ASPIRA206 JUNE 2022 new.pdf7 Jul 2022
Layout approvalFile: 13TH FLOOR PLAN.pdf16 Apr 2022
Copy of Layout Approval (in case of layout)File: 13TH FLOOR PLAN.pdf16 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-Architecht Certificate-Aspira 206.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf7 Apr 2022
Form 2AFile: Form 2A-ENGINEERS CERTIFICATE-ASPIRA 206.pdf7 Apr 2022
Certificates of CA (Form 3)File: FORM 3 - GCVL Aspira 206 - March 2022.pdf7 Apr 2022
Layout approvalFile: LAYOUT APPROVAL.pdf6 Apr 2022
Details of encumbrancesFile: Encumbrance - Cersai Declaration.pdf6 Apr 2022
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf6 Apr 2022
Disclosure of sold/ booked inventoryFile: Details of Unsold Inventory as on 31 03 22-Aspira 206_Signed.pdf5 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC CONSENT LETTER upload.pdf24 Mar 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf24 Mar 2022
OtherFile: FORMAT C Consent letter Aspira206 upload.pdf24 Mar 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REG CER.pdf27 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECTS CERTIFICATE ASPIRA 206.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira 206.pdf7 Jan 2022
Form 2AFile: FORM 2A ENGINEER CERTIFICATE GEECEE ASPIRA 206.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORIES GEECEE ASPIRA 206.pdf7 Jan 2022
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE_ASPIRA 206.pdf7 Jan 2022
OtherFile: Part OC -Geecee Aspira 206.pdf2 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Reservation of Name aspira 206.pdf21 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate Aspira 206.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf7 Oct 2021
Form 2AFile: FORM 2A ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE Aspira 206.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Sep 21.pdf7 Oct 2021
Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE SEPT 2021 ASPIR.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5 Aspira 206.pdf29 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-ASPIRA.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf13 Aug 2021
Form 2AFile: form 2a - RERA QUALITY CERTIFICATE - PANVEL.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY GEECEE ASPIRA 206.pdf13 Aug 2021
Certificates of CA (Form 3)File: 162_Geecee_RERA - June 2021_Aspira_Final.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: ASPIRA 206 - Disclosure of Sold Inventory.pdf21 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory-Aspira.pdf21 May 2021
Certificates of CA (Form 3)File: NEW FORM 3 049_Geecee_Rera Certificate - March 2021 - Aspira_Final1.pdf20 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEW FORM 1 ASPIRA.pdf19 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEW Form 2 Aspira206.pdf19 May 2021
Form 2AFile: NEW Form 2A-Aspira.pdf19 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - ARCHITECT CERTIFICATE.pdf20 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ENGINEER CERTIFICATE.pdf20 Feb 2021
Form 2AFile: FORM 2A - QUALITY ASSURANCE.pdf20 Feb 2021
Certificates of CA (Form 3)File: FORM 3 - SUBSEQUENT WITHDRAWAL OF MONEY.pdf20 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf27 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer certificate.pdf27 Nov 2020
Form 2AFile: Form 2AEngineers Certificate For Quality Assurance.pdf27 Nov 2020
Certificates of CA (Form 3)File: Form 3 Subsequent withdrawl of money.pdf27 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Aspira 206.pdf2 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -ASPIRA.pdf15 Sep 2020

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PROXIMUSP51800027318CHEMBUR, Mumbai Suburban37Dec 2020CompletedJun 2025Mar 2024
Laxmi KunjP51800046721JUHU, Mumbai Suburban-Sep 2022CompletedDec 2024Nov 2024
The Mist Phase IIP52000024728Dahiwali T. Waredi, Raigarh-Mar 2020CompletedDec 2022Aug 2022
The Mist -Phase IP52000007101Dahiwali T. Waredi, Raigarh-Aug 2017CompletedSep 2020Sep 2020
Cloud 36-Phase IIP51700004872Ghansoli, Thane-Aug 2017CompletedDec 2018Jul 2018
Cloud 36 -Phase IPlot No. 6 Sector 11. Ghansoli Node252-CompletedDec 2018Feb 2018

How this compares with Raigarh

81%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GeeCee Aspira 206 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Navi Mumbai5,900+ in Raigarh

2 kmGeeCee Aspira 206Completed 44Lapsed / revoked 13Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: GeeCee Ventures Limited

GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GeeCee Aspira 206 is delayed beyond 28 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GeeCee Aspira 206?

The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GeeCee Aspira 206?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GeeCee Aspira 206?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GeeCee Aspira 206?

The professionals named in the filing: Architect: Mr Satish V Ahuja; Engineer: Mr Girish Daiya; Chartered Accountant: SARDA & PAREEK LLP; Chartered Accountant: MRB & Associates; Chartered Accountant: Sarda & Pareek. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GeeCee Aspira 206?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GeeCee Aspira 206. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GeeCee Aspira 206 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.