GeeCee Aspira 206
RG-MH-65978 · RERA P52000019788 · Last updated on MahaRERA portal: 7 Oct 2024
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 6 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GeeCee Aspira 206 is a Others project by GeeCee Ventures Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000019788 on 5 Mar 2019. The registration is recorded completed; possession was promised by 28 Aug 2023. 120 of the 149 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameGeeCee Aspira 206
- TypeOthers
- Location
- F3
- Navi Mumbai
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000019788
- ReraGenie IDRG-MH-65978
Builder
- NameGeeCee Ventures Limited
- Entity typeCompany
- CINL24249MH1984PLC032170
- GSTIN27AAACG3914A1Z7
- Non- Executive DirectorRohit Ashwin Kothari
- Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
- Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
- Other registrations10 more →
- Completed7 of 11
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Mar 2019
- Promised completion28 Aug 2023
- Revised completionNone
- Buildings1 building record
- Documents filed130 files
Current status
Figures as on 7 Oct 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GeeCee Aspira 206 | NA | 16 | 0 | 121 | 28 | 149 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
GeeCee Aspira 206: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GeeCee Aspira 206 | NA | Rs 25.40 cr | Rs 25.35 cr |
| - | NA | Rs 7.70 cr | Rs 1.75 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Satish V Ahuja |
| Engineer | Mr Girish Daiya |
| Chartered Accountant | SARDA & PAREEK LLP |
| Chartered Accountant | MRB & Associates |
| Chartered Accountant | Sarda & Pareek |
| Partner | Role in project |
|---|---|
| GeeCee Ventures Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per the subject matter, the undersigned is hereby applying for availing extension of RERA registration in respect of one of our project - Geecee Aspira 206 located at Plot No. F3, Sector 06, New Panvel- East, Navi Mumbai at Panvel, Raigarh, 410 206 upto a period of (one) 1 year i.e. 27th August, 2024 as the registration will be expiring on 28th August, 2023.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Feb 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Feb 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Mar 2024
Documents filed130
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure B - Form 5 - Annual Report -Aspira 206.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure B - Form 5 - Annual Report -Aspira 206.pdf | 7 Oct 2024 |
| Form 2AFile: FORM-2A_Aspira 206 2A_signed.pdf | 20 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Letter - Aspira 206.pdf | 22 Mar 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 - ASPIRA 206.pdf | 22 Mar 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DeclarationOCSIGNED.pdf | 21 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 PROJECT COMPLETION ARCHITECT CERTIFICATE.pdf | 19 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 PROJECT COMPLETION ARCHITECT CERTIFICATE.pdf | 11 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ONLINE OC PDF 150923.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5ASPIRA2223.pdf | 12 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ASPIRAFORM1JUNE2023.pdf | 20 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ASPIRAFORM2JUNE2023.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: ASPIRASOLDUNSOLDJUNE2023SIGNED.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: ASPIRAFORM3JUNE2023.pdf | 20 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Aspira206.pdf | 20 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aspira206 Form 2.pdf | 20 Apr 2023 |
| Form 2AFile: Form 2A -Aspira.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Aspira.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Aspira Form 3.pdf | 20 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect (Form1)-Aspira 206.pdf | 20 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Aspira206.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory-Aspira 206-Dec,22.pdf | 20 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Signed Aspira.pdf | 20 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aspira 206 Form 1.pdf | 20 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf | 20 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Aspira206.pdf | 20 Oct 2022 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 20 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - GCVL Aspira 206.pdf | 30 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 AR CERT ASPIRA206 JUNE 2022.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ER CERT ASPIRA206 JUNE 2022.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY ASPIRA206 JUNE 2022.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: FORM 3 CA CERT ASPIRA206 JUNE 2022 new.pdf | 7 Jul 2022 |
| Layout approvalFile: 13TH FLOOR PLAN.pdf | 16 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: 13TH FLOOR PLAN.pdf | 16 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1-Architecht Certificate-Aspira 206.pdf | 7 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf | 7 Apr 2022 |
| Form 2AFile: Form 2A-ENGINEERS CERTIFICATE-ASPIRA 206.pdf | 7 Apr 2022 |
| Certificates of CA (Form 3)File: FORM 3 - GCVL Aspira 206 - March 2022.pdf | 7 Apr 2022 |
| Layout approvalFile: LAYOUT APPROVAL.pdf | 6 Apr 2022 |
| Details of encumbrancesFile: Encumbrance - Cersai Declaration.pdf | 6 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Details of Unsold Inventory as on 31 03 22-Aspira 206_Signed.pdf | 5 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC CONSENT LETTER upload.pdf | 24 Mar 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 24 Mar 2022 |
| OtherFile: FORMAT C Consent letter Aspira206 upload.pdf | 24 Mar 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REG CER.pdf | 27 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECTS CERTIFICATE ASPIRA 206.pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira 206.pdf | 7 Jan 2022 |
| Form 2AFile: FORM 2A ENGINEER CERTIFICATE GEECEE ASPIRA 206.pdf | 7 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORIES GEECEE ASPIRA 206.pdf | 7 Jan 2022 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE_ASPIRA 206.pdf | 7 Jan 2022 |
| OtherFile: Part OC -Geecee Aspira 206.pdf | 2 Dec 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Reservation of Name aspira 206.pdf | 21 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate Aspira 206.pdf | 7 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf | 7 Oct 2021 |
| Form 2AFile: FORM 2A ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE Aspira 206.pdf | 7 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Sep 21.pdf | 7 Oct 2021 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE SEPT 2021 ASPIR.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5 Aspira 206.pdf | 29 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1-ASPIRA.pdf | 13 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Aspira206.pdf | 13 Aug 2021 |
| Form 2AFile: form 2a - RERA QUALITY CERTIFICATE - PANVEL.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY GEECEE ASPIRA 206.pdf | 13 Aug 2021 |
| Certificates of CA (Form 3)File: 162_Geecee_RERA - June 2021_Aspira_Final.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: ASPIRA 206 - Disclosure of Sold Inventory.pdf | 21 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory-Aspira.pdf | 21 May 2021 |
| Certificates of CA (Form 3)File: NEW FORM 3 049_Geecee_Rera Certificate - March 2021 - Aspira_Final1.pdf | 20 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEW FORM 1 ASPIRA.pdf | 19 May 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: NEW Form 2 Aspira206.pdf | 19 May 2021 |
| Form 2AFile: NEW Form 2A-Aspira.pdf | 19 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - ARCHITECT CERTIFICATE.pdf | 20 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ENGINEER CERTIFICATE.pdf | 20 Feb 2021 |
| Form 2AFile: FORM 2A - QUALITY ASSURANCE.pdf | 20 Feb 2021 |
| Certificates of CA (Form 3)File: FORM 3 - SUBSEQUENT WITHDRAWAL OF MONEY.pdf | 20 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 27 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer certificate.pdf | 27 Nov 2020 |
| Form 2AFile: Form 2AEngineers Certificate For Quality Assurance.pdf | 27 Nov 2020 |
| Certificates of CA (Form 3)File: Form 3 Subsequent withdrawl of money.pdf | 27 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Aspira 206.pdf | 2 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -ASPIRA.pdf | 15 Sep 2020 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PROXIMUSP51800027318 | CHEMBUR, Mumbai Suburban | 37 | Dec 2020 | Completed | Jun 2025 | Mar 2024 |
| Laxmi KunjP51800046721 | JUHU, Mumbai Suburban | - | Sep 2022 | Completed | Dec 2024 | Nov 2024 |
| The Mist Phase IIP52000024728 | Dahiwali T. Waredi, Raigarh | - | Mar 2020 | Completed | Dec 2022 | Aug 2022 |
| The Mist -Phase IP52000007101 | Dahiwali T. Waredi, Raigarh | - | Aug 2017 | Completed | Sep 2020 | Sep 2020 |
| Cloud 36-Phase IIP51700004872 | Ghansoli, Thane | - | Aug 2017 | Completed | Dec 2018 | Jul 2018 |
| Cloud 36 -Phase I | Plot No. 6 Sector 11. Ghansoli Node | 252 | - | Completed | Dec 2018 | Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 130 filed documents as one ZIP, foldered, with a manifest
Keep GeeCee Aspira 206 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Navi Mumbai5,900+ in Raigarh
Filed coordinates, straight-line distance. 127 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: GeeCee Ventures Limited
GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if GeeCee Aspira 206 is delayed beyond 28 Aug 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GeeCee Aspira 206?
The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GeeCee Aspira 206?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GeeCee Aspira 206?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GeeCee Aspira 206?
The professionals named in the filing: Architect: Mr Satish V Ahuja; Engineer: Mr Girish Daiya; Chartered Accountant: SARDA & PAREEK LLP; Chartered Accountant: MRB & Associates; Chartered Accountant: Sarda & Pareek. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GeeCee Aspira 206?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback