Home / Browse projects / Mumbai Suburban, Maharashtra / PROXIMUS

Completed No litigation declared Residential / Group Housing project

PROXIMUS

By GeeCee Ventures Limited

RG-MH-28860 · RERA P51800027318 · Last updated on MahaRERA portal: 20 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 6 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
5 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

PROXIMUS is a Residential / Group Housing project by GeeCee Ventures Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027318 on 1 Dec 2020. The registration is recorded completed; possession was promised by 30 Jun 2025. 32 of the 37 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NamePROXIMUS
  • TypeResidential / Group Housing
  • Location
    • CHEMBUR
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800027318
  • ReraGenie IDRG-MH-28860

Builder

  • NameGeeCee Ventures Limited
  • Entity typeCompany
  • CINL24249MH1984PLC032170
  • GSTIN27AAACG3914A1Z7
  • Non- Executive DirectorRohit Ashwin Kothari
  • Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
  • Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
  • Other registrations10 more →
  • Completed7 of 11
  • Declared earlier projects7 →

Key dates

this monthRegisteredDec 2020PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Dec 2020
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Current status

86%32 of 37 units booked
98.4%Work done, per cost certificate

Figures as on 20 Mar 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PROXIMUSNA14037037

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

PROXIMUS: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered53

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area959 sq m
Land owned byThe promoter
Named landownersNone
Declared on26 Sep 2024

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI3063.23
Proposed, not sanctioned3,063 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANEKJI WADIA BLDG GROUND FLOOR NANIK MOTWANI MARG FORT MUMBAI 400001
Estimated costRs 16.50 cr
Cost incurredRs 16.24 cr
Work done98.42%
BuildingWingEstimatedIncurred
PROXIMUSNARs 15.70 crRs 15.67 cr
-NARs 80.00 lakhRs 57.00 lakh

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
GeeCee Ventures Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Mar 2024

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf20 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure A - Form 5 - Annual Report -Proximus.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A of Proximus for FY 2023-24_SIGNED.pdf20 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2402383_OC_PROXIMUS_Signed.pdf19 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Project Completion Architect Certificate.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1AC PROXIMUS DEC2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate- Proximus.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Proximus.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PROXIMUS.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2ProximusSEP2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3ProximusSEP2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SoldUnsoldProximusSEP2023.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1ProximusSEP2023.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5PROXIMUS2223.pdf12 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PROXIMUSFORM1JUNE2023.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PROXIMUSFORM2JUNE2023.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: PROXIMUSSOLDUNSOLDJUNE2023SIGNED.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PROXIMUSFORM3JUNE2023.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Proximus.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Proximus Form 2.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Proximus 2A.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Proximus 2A.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Proximus.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Proximus Form 3.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificate of Architect (Form1)-Proximus.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Proximus.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold Inventory-Dec,22 Proximus.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Signed Proximus.pdf20 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed.pdf28 Dec 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf28 Dec 2022
Layout approvalFile: LAYOUT PAGE 1.pdf11 Nov 2022
Layout approvalFile: LAYOUT PAGE 2.pdf11 Nov 2022
Layout approvalFile: LAYOUT PAGE 3.pdf11 Nov 2022
Layout approvalFile: LAYOUT PAGE 4.pdf11 Nov 2022
Layout approvalFile: LAYOUT PAGE 5.pdf11 Nov 2022
Details of encumbrances concerned to FinanceFile: ENCUMRANCE CERTIFICATE Legal Litigation.pdf11 Nov 2022
Details of encumbrances concerned to LegalFile: ENCUMRANCE CERTIFICATE Legal Litigation.pdf11 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PAGE 1.pdf11 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PAGE 2.pdf11 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PAGE 3.pdf11 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PAGE 4.pdf11 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PAGE 5.pdf11 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf11 Nov 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf11 Nov 2022
CERSAI detailsFile: CERSAI ENCUMRANCE CERTIFICATE.pdf11 Nov 2022
Proforma of Agreement for saleFile: Agreement for Sale.pdf11 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A decl on separate bank acc.pdf11 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Proximus Form 1.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Proximus.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Proximus.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Oct 2022
OtherFile: Letter in relation to amalgamation and sub-division of Plot.pdf3 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - GCVL Proximus.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2 Form 5 - GCVL Proximus.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AR CERT PROXIMUS JUNE 2022.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ER CERT PROXIMUS JUNE 2022.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY PROXIMUS JUNE 2022.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERT PROXIMUS JUNE 2022 new.pdf7 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: 2 2275891FirstCC.pdf4 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 3 2277806FurtherCC.pdf4 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 4 2304869FurtherCC.pdf4 Jun 2022
Declaration about Commencement CertificateFile: Declaration.pdf4 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate-Proximus.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Proximus Engineers Certificate.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-ENGINEERS CERTIFICATE-PROXIMUS.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: DETAILS OF UNSOLD INVENTORIES - PROXIMUS.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Proximus - March 2022.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CERTIFICATE OF ARCHITECT PROXIMUS.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Proximus.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A ENGINEER CERTIFICATE PROXIMUS.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORIES GEECEE PROXIMUS.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATAE PROXIMUS.pdf7 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE SEPT 2021 PROXIMUS.pdf7 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (FORM1) CERTIFICATE OF ARCHITECT 30 09 2021.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Proximus Sep 2021_REDUCED.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A PROXIMUS.pdf6 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5 Proximus.pdf29 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - CERTIFICATE OF ARCHITECT (FORM1) 30 06 2021.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Proximus - ER CERTIFICATE.pdf13 Aug 2021

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Laxmi KunjP51800046721JUHU, Mumbai Suburban-Sep 2022CompletedDec 2024Nov 2024
GeeCee Aspira 206P52000019788Navi Mumbai, Raigarh149Mar 2019CompletedAug 2024Registered original: Aug 2023Sep 2023
The Mist Phase IIP52000024728Dahiwali T. Waredi, Raigarh-Mar 2020CompletedDec 2022Aug 2022
The Mist -Phase IP52000007101Dahiwali T. Waredi, Raigarh-Aug 2017CompletedSep 2020Sep 2020
Cloud 36-Phase IIP51700004872Ghansoli, Thane-Aug 2017CompletedDec 2018Jul 2018
Cloud 36 -Phase IPlot No. 6 Sector 11. Ghansoli Node252-CompletedDec 2018Feb 2018

How this compares with Mumbai Suburban

86%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PROXIMUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

Builder: GeeCee Ventures Limited

GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PROXIMUS is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PROXIMUS?

The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PROXIMUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PROXIMUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in PROXIMUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PROXIMUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PROXIMUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.