Home / Browse projects / Mumbai Suburban, Maharashtra / Laxmi Kunj

Completed No litigation declared Residential / Group Housing project

Laxmi Kunj

By GeeCee Ventures Limited

RG-MH-40611 · RERA P51800046721 · Last updated on MahaRERA portal: 18 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 6 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Laxmi Kunj is a Residential / Group Housing project by GeeCee Ventures Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046721 on 1 Sep 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameLaxmi Kunj
  • TypeResidential / Group Housing
  • Location
    • JVPD
    • JUHU
    • Andheri
    • Mumbai Suburban
    • 400049
  • Pincode400049
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046721
  • ReraGenie IDRG-MH-40611

Builder

  • NameGeeCee Ventures Limited
  • Entity typeCompany
  • CINL24249MH1984PLC032170
  • GSTIN27AAACG3914A1Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Non- Executive DirectorRohit Ashwin Kothari
  • Whole - time DirectorsSureshkumar Vasudevan Vazhathara Pillai, Gaurav Shyamsukha
  • Independent DirectorsVallabh Prasad Biyani, Neha Bandyopadhyay, Rupal Vora
  • Other registrations10 more →
  • Completed7 of 11
  • Declared earlier projects7 →

Key dates

this monthRegisteredSep 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAXMI KUNJNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

LAXMI KUNJ: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities17

As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes100%
Street LightingYes95%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Passenger LiftsYes100%
Car Parking SystemsYes100%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered15
Open Space2

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area502 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Declared on6 Sep 2024
LandownerVillageDistrict
MR. KANTILAL JIVANBHAI PATELAndheriMumbai Suburban
MR. KISHOR JIVANBHAI PATELAndheriMumbai Suburban
MR. BHARAT JIVANBHAI PATELAndheriMumbai Suburban
MRS. CHANDANBEN KANTILAL PATELAndheriMumbai Suburban
MRS. RANGITA KISHOR PATELAndheriMumbai Suburban
MRS. SANGITA BHARAT PATELAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1626.16
Proposed, not sanctioned1,626 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LIMITED, GROUND FLOOR, JEHANGIR BUILDING, MG ROAD, FORT, MUMBAI

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
GeeCee Ventures Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Dec 2024

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Laxmi Kunj_Signed.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold_unsold_30th sept 2024-signed.pdf27 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - 23-24.pdf27 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 WITH OC.pdf25 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2447199_OC_signed.pdf4 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 LAXMI KUN J.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA_LaxmiKunj.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Laxmi Kunj.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold report_LAXMI KUNJ.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Laxmikunj.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Laxmikunj.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Signed Geecee Form 5_Laxmikunj.pdf28 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Laxmi Kunj.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate_Laxmi Kunj.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold_LaxmiKunj_June-24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_June 2024__Laxmi Kunj.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 GC-LK-FORM-A-VIII-IV-24-1s.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Laxmikunj_signed.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Laxmi Kunj_Signed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3-GeeCee_Laxmi Kunj_March2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: laxmi kunj_sold_unsold_signed.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1AC LAXMI KUNJ_DEC 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate- Laxmi Kunj.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory - Laxmi Kunj.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 LAXMI KUNJ.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2LaxmiKunjSEP2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3LaxmiKunjSEP2023.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: SoldUnsoldLaxmikunjSEP2023.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1LaxmikunjSEP2023.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5LAXMIKUNJ2223.pdf12 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2LAXMIKUNJ16082023.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3LAXMIKUNJ16082023.pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LKFORM1JUNE2023.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LKFORM2JUNE2023.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: LKSOLDUNSOLDJUNE2023SIGNED.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LKFORM3JUNE2023.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or Booked Inventory.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Laxmikunj.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Laxmikunj Form 2.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Laxmikunj 2A.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Laxmikunj.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Laxmi Kunj Form 3.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificate of Architect (Form1)-Laxmi Kunj.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Laxmi Kunj.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold Inventory-Dec,22 Laxmikunj.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed Laxmi kunj.pdf20 Jan 2023
Layout approvalFile: DECLARATION FOR WRONG UPLOAD.pdf20 Dec 2022
Copy of Layout Approval (in case of layout)File: DECLARATION FOR WRONG UPLOAD.pdf20 Dec 2022
Layout approvalFile: Layout Juhu.pdf9 Dec 2022
Layout approvalFile: Layout.pdf9 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf9 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout Juhu.pdf9 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_signed.pdf9 Dec 2022
Declaration about Commencement CertificateFile: DECLARATION - FOR CC.pdf9 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Laxmi Kunj Form 1.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Laxmi Kunj.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Laxmi Kunj.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Geecee Form 3.pdf20 Aug 2022
Proforma of Allotment letterFile: 14 Allotment Letter.pdf20 Aug 2022
Proforma of Allotment letterFile: 14B.pdf20 Aug 2022
Deviation Report with respect to Allotment letterFile: 19b Deviation Report - Allotment Letter.pdf20 Aug 2022
Deviation Report with respect to model copy of AgreementFile: 19a Deviation Report - Agreement for Sale.pdf20 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 16 FORMAT A decl on separate bank acc.pdf29 Jul 2022
Other - LegalFile: 18A Other Legal Hatkesh Society NOC.pdf28 Jul 2022
Other - LegalFile: 18B Other Legal Leasedeed (1).pdf28 Jul 2022
Details of encumbrances concerned to FinanceFile: 3ENCUMRANCE CERTIFICATE - FIN.pdf16 Jul 2022
Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCE CERTIFICATE.pdf13 Jul 2022
Copy of the legal title reportFile: 2 LEGALTITLEREPORT.pdf5 Jul 2022
Layout approvalFile: 4 Layout Approval Drawing.pdf16 Jun 2022
Copy of Layout Approval (in case of layout)File: 4 Layout Approval Drawing.pdf16 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect Form1.pdf16 Jun 2022
CERSAI detailsFile: 12 CERSAI ENCUMRANCE CERTIFICATE.pdf16 Jun 2022
Building plan approvalFile: 10 IOD.pdf15 Jun 2022
PAN CardFile: 1 GEECEEPAN.pdf15 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: 10 IOD.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 9 FIRST CC.pdf15 Jun 2022
Declaration about Commencement CertificateFile: 13 FORMAT D DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf15 Jun 2022
Declaration in FORM BFile: 5 FORM B.pdf15 Jun 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PROXIMUSP51800027318CHEMBUR, Mumbai Suburban37Dec 2020CompletedJun 2025Mar 2024
GeeCee Aspira 206P52000019788Navi Mumbai, Raigarh149Mar 2019CompletedAug 2024Registered original: Aug 2023Sep 2023
The Mist Phase IIP52000024728Dahiwali T. Waredi, Raigarh-Mar 2020CompletedDec 2022Aug 2022
The Mist -Phase IP52000007101Dahiwali T. Waredi, Raigarh-Aug 2017CompletedSep 2020Sep 2020
Cloud 36-Phase IIP51700004872Ghansoli, Thane-Aug 2017CompletedDec 2018Jul 2018
Cloud 36 -Phase IPlot No. 6 Sector 11. Ghansoli Node252-CompletedDec 2018Feb 2018

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Laxmi Kunj on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JUHU6,700+ in Mumbai Suburban

2 kmLaxmi KunjCompleted 126Lapsed / revoked 68Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 293 registered projects within 2 km.

Builder: GeeCee Ventures Limited

GeeCee Ventures Limited has 11 registrations on MahaRERA, including Cloud 36 -Phase I and Cloud 36-Phase II. Its filings disclose 7 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Laxmi Kunj is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Laxmi Kunj?

The registered promoter entity is GeeCee Ventures Limited, a company as per the filing. Its CIN L24249MH1984PLC032170 and GSTIN 27AAACG3914A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Laxmi Kunj?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Laxmi Kunj?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Laxmi Kunj?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Laxmi Kunj. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Laxmi Kunj to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.