ReraGenieLog inGet a buyer report

Home / Areas / Nagpur

New projects and RERA data in Nagpur district, Maharashtra

2885 projects are registered in Nagpur district: 226,103 units across them, 267 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

2885Projects covered
267Registered, last 12 months
226,103Units declared
161,989Units not yet booked
400Completion dates revised
15With declared litigation

Of the 2885 covered registrations, 400 have revised their promised completion date and 15 declare litigation. The median project here is 35% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Free · a new edition every month

Nagpur monthly RERA report

What registered month by month, this city against its own twelve-month run and against the other six, with the possession pipeline, the taluka split and the busiest pincodes. Built from the same filings as this page.

September 2026: 14 new registrations, 2,359 homes and units.

When Nagpur projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 2,884 projects with a promised date, 1,116 are recorded delivered, 1,124 are still on the register and 644 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0125250375500today2017: 18 projects, delivered2017: 1 projects, registration lapsed or cancelled’172018: 91 projects, delivered2018: 4 projects, registration lapsed or cancelled’182019: 114 projects, delivered2019: 14 projects, registration lapsed or cancelled’192020: 56 projects, delivered2020: 22 projects, registration lapsed or cancelled’202021: 60 projects, delivered2021: 37 projects, registration lapsed or cancelled’212022: 110 projects, delivered2022: 63 projects, registration lapsed or cancelled’222023: 143 projects, delivered2023: 105 projects, registration lapsed or cancelled’232024: 135 projects, delivered2024: 137 projects, registration lapsed or cancelled’242025: 133 projects, delivered2025: 158 projects, registration lapsed or cancelled’252026: 109 projects, delivered2026: 194 projects, on the register2026: 95 projects, registration lapsed or cancelled’262027: 73 projects, delivered2027: 290 projects, on the register2027: 6 projects, registration lapsed or cancelled’272028: 44 projects, delivered2028: 237 projects, on the register’282029: 22 projects, delivered2029: 173 projects, on the register2029: 1 projects, registration lapsed or cancelled’292030: 6 projects, delivered2030: 137 projects, on the register’302031: 2 projects, delivered2031: 61 projects, on the register2031: 1 projects, registration lapsed or cancelled’312032: 16 projects, on the register’322033: 6 projects, on the register’332034: 2 projects, on the register’342035: 6 projects, on the register’35

1,481 projects promise possession in 2026 or later. Years outside 2017 to 2035 hold 2 further projects and are not shown. Facts as per filings on RERA website.

012k25k37k50ktoday2017: 1 flats, delivered (only 1 of 19 projects filed a flat count)’172018: 807 flats, delivered (only 14 of 95 projects filed a flat count)’182019: 766 flats, delivered (only 24 of 128 projects filed a flat count)2019: 1,049 flats, registration lapsed or cancelled (only 24 of 128 projects filed a flat count)’192020: 35,689 flats, delivered (only 11 of 78 projects filed a flat count)2020: 142 flats, registration lapsed or cancelled (only 11 of 78 projects filed a flat count)’202021: 5,527 flats, delivered (only 26 of 97 projects filed a flat count)2021: 777 flats, registration lapsed or cancelled (only 26 of 97 projects filed a flat count)’212022: 5,095 flats, delivered (only 52 of 173 projects filed a flat count)2022: 1,212 flats, registration lapsed or cancelled (only 52 of 173 projects filed a flat count)’222023: 12,164 flats, delivered (only 106 of 248 projects filed a flat count)2023: 17,825 flats, registration lapsed or cancelled (only 106 of 248 projects filed a flat count)’232024: 3,768 flats, delivered (only 126 of 272 projects filed a flat count)2024: 5,340 flats, registration lapsed or cancelled (only 126 of 272 projects filed a flat count)’242025: 9,507 flats, delivered2025: 7,434 flats, registration lapsed or cancelled’252026: 6,023 flats, delivered2026: 14,325 flats, on the register2026: 4,410 flats, registration lapsed or cancelled’262027: 8,281 flats, delivered2027: 19,997 flats, on the register’272028: 2,545 flats, delivered2028: 15,979 flats, on the register’282029: 2,067 flats, delivered2029: 14,716 flats, on the register’292030: 255 flats, delivered2030: 15,793 flats, on the register’302031: 129 flats, delivered2031: 7,048 flats, on the register’312032: 2,604 flats, on the register’322033: 986 flats, on the register’332034: 45 flats, on the register’342035: 2,703 flats, on the register’35

117,906 flats are promised in 2026 or later, across the 88% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Years outside 2017 to 2035 hold 2 further projects and are not shown. Facts as per filings on RERA website.

How far Nagpur possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 398 of 2,885 projects (14%) have moved at least once; the median move is 22 months and the longest is 180 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0125250375500Originally due 2017: 18 projects kept the original date, 67% of the yearOriginally due 2017: 8 projects moved by under 2 years, 30% of the yearOriginally due 2017: 1 projects moved by 2 years or more, 4% of the year’17Originally due 2018: 86 projects kept the original date, 60% of the yearOriginally due 2018: 27 projects moved by under 2 years, 19% of the yearOriginally due 2018: 30 projects moved by 2 years or more, 21% of the year’18Originally due 2019: 111 projects kept the original date, 72% of the yearOriginally due 2019: 18 projects moved by under 2 years, 12% of the yearOriginally due 2019: 26 projects moved by 2 years or more, 17% of the year’19Originally due 2020: 50 projects kept the original date, 71% of the yearOriginally due 2020: 8 projects moved by under 2 years, 11% of the yearOriginally due 2020: 12 projects moved by 2 years or more, 17% of the year’20Originally due 2021: 78 projects kept the original date, 76% of the yearOriginally due 2021: 11 projects moved by under 2 years, 11% of the yearOriginally due 2021: 14 projects moved by 2 years or more, 14% of the year’21Originally due 2022: 147 projects kept the original date, 81% of the yearOriginally due 2022: 14 projects moved by under 2 years, 8% of the yearOriginally due 2022: 21 projects moved by 2 years or more, 12% of the year’22Originally due 2023: 227 projects kept the original date, 83% of the yearOriginally due 2023: 19 projects moved by under 2 years, 7% of the yearOriginally due 2023: 29 projects moved by 2 years or more, 11% of the year’23Originally due 2024: 237 projects kept the original date, 83% of the yearOriginally due 2024: 26 projects moved by under 2 years, 9% of the yearOriginally due 2024: 24 projects moved by 2 years or more, 8% of the year’24Originally due 2025: 245 projects kept the original date, 78% of the yearOriginally due 2025: 41 projects moved by under 2 years, 13% of the yearOriginally due 2025: 29 projects moved by 2 years or more, 9% of the year’25Originally due 2026: 305 projects kept the original date, 91% of the yearOriginally due 2026: 24 projects moved by under 2 years, 7% of the yearOriginally due 2026: 7 projects moved by 2 years or more, 2% of the year’26Originally due 2027: 314 projects kept the original date, 99% of the yearOriginally due 2027: 3 projects moved by under 2 years, 1% of the year’27Originally due 2028: 262 projects kept the original date, 99% of the yearOriginally due 2028: 2 projects moved by under 2 years, 1% of the year’28Originally due 2029: 187 projects kept the original date, 99% of the yearOriginally due 2029: 1 projects moved by under 2 years, 1% of the year’29Originally due 2030: 136 projects kept the original date, 99% of the yearOriginally due 2030: 1 projects moved by under 2 years, 1% of the year’30Originally due 2031: 57 projects kept the original date, 97% of the yearOriginally due 2031: 2 projects moved by under 2 years, 3% of the year’31Originally due 2032: 15 projects kept the original date, 100% of the year’32Originally due 2033: 4 projects kept the original date, 100% of the year’33Originally due 2034: 2 projects kept the original date, 100% of the year’34Originally due 2035: 4 projects kept the original date, 100% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

012k25k37k50kOriginally due 2017: 1 flats kept the original date, 67% of the year (only 1 of 27 projects filed a flat count)’17Originally due 2018: 807 flats kept the original date, 60% of the year (only 20 of 143 projects filed a flat count)Originally due 2018: 137 flats moved by under 2 years, 19% of the year (only 20 of 143 projects filed a flat count)Originally due 2018: 38 flats moved by 2 years or more, 21% of the year (only 20 of 143 projects filed a flat count)’18Originally due 2019: 1,767 flats kept the original date, 72% of the year (only 34 of 155 projects filed a flat count)Originally due 2019: 54 flats moved by under 2 years, 12% of the year (only 34 of 155 projects filed a flat count)Originally due 2019: 439 flats moved by 2 years or more, 17% of the year (only 34 of 155 projects filed a flat count)’19Originally due 2020: 35,688 flats kept the original date, 71% of the year (only 16 of 70 projects filed a flat count)Originally due 2020: 223 flats moved by under 2 years, 11% of the year (only 16 of 70 projects filed a flat count)Originally due 2020: 794 flats moved by 2 years or more, 17% of the year (only 16 of 70 projects filed a flat count)’20Originally due 2021: 6,181 flats kept the original date, 76% of the year (only 38 of 103 projects filed a flat count)Originally due 2021: 244 flats moved by under 2 years, 11% of the year (only 38 of 103 projects filed a flat count)Originally due 2021: 496 flats moved by 2 years or more, 14% of the year (only 38 of 103 projects filed a flat count)’21Originally due 2022: 6,004 flats kept the original date, 81% of the year (only 69 of 182 projects filed a flat count)Originally due 2022: 428 flats moved by under 2 years, 8% of the year (only 69 of 182 projects filed a flat count)Originally due 2022: 792 flats moved by 2 years or more, 12% of the year (only 69 of 182 projects filed a flat count)’22Originally due 2023: 29,502 flats kept the original date, 83% of the year (only 129 of 275 projects filed a flat count)Originally due 2023: 403 flats moved by under 2 years, 7% of the year (only 129 of 275 projects filed a flat count)Originally due 2023: 2,246 flats moved by 2 years or more, 11% of the year (only 129 of 275 projects filed a flat count)’23Originally due 2024: 8,515 flats kept the original date, 83% of the yearOriginally due 2024: 536 flats moved by under 2 years, 9% of the yearOriginally due 2024: 3,709 flats moved by 2 years or more, 8% of the year’24Originally due 2025: 15,689 flats kept the original date, 78% of the yearOriginally due 2025: 2,876 flats moved by under 2 years, 13% of the yearOriginally due 2025: 2,198 flats moved by 2 years or more, 9% of the year’25Originally due 2026: 18,485 flats kept the original date, 91% of the yearOriginally due 2026: 1,706 flats moved by under 2 years, 7% of the yearOriginally due 2026: 1,368 flats moved by 2 years or more, 2% of the year’26Originally due 2027: 24,674 flats kept the original date, 99% of the yearOriginally due 2027: 241 flats moved by under 2 years, 1% of the year’27Originally due 2028: 16,428 flats kept the original date, 99% of the yearOriginally due 2028: 33 flats moved by under 2 years, 1% of the year’28Originally due 2029: 16,119 flats kept the original date, 99% of the yearOriginally due 2029: 24 flats moved by under 2 years, 1% of the year’29Originally due 2030: 15,360 flats kept the original date, 99% of the yearOriginally due 2030: 98 flats moved by under 2 years, 1% of the year’30Originally due 2031: 6,199 flats kept the original date, 97% of the yearOriginally due 2031: 68 flats moved by under 2 years, 3% of the year’31Originally due 2032: 2,454 flats kept the original date, 100% of the year’32Originally due 2033: 986 flats kept the original date, 100% of the year’33Originally due 2034: 45 flats kept the original date, 100% of the year’34Originally due 2035: 1,004 flats kept the original date, 100% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Nagpur

Who sanctions building in Nagpur

1,191 of the 2,885 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Nagpur Metropolitan Region Development Authority438
Nagpur Municipal Corporation203
Nagpur Improvement Trust136
178 other bodies414

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 2,885 registrations on this page answers this: on 2,118 the promoter is the only owner named; on 710 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 57 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Nagpur: projects by taluka

2,885 of the 2,885 registrations on this page name their taluka.

TalukaProjectsShare
Nagpur (Urban)1,15340%
Nagpur (Rural)1,03736%
Hingna39614%
Kamptee1405%
10 other talukas1596%

Projects in Nagpur

Showing 1 to 60 of 2,885 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
SHIVTHIRTH NAGAR 3PEWTHA VILLAGE, 441304ASHISH KALODE & OTHERS352450%4 Jul 2018Completed
Kanher Nagri DevelopersWagdara (536054), 441108KANHER NAGRI DEVELOPERS152256%7 Nov 2017Registration lapsed
MAHALAXMI NAGAR 6WARDHA ROAD, 441108MAHALAXMI ESTATE62160%6 Feb 2019Completed
MAHALAXMI NAGAR 4WARDHA ROAD, 441108PADMALAXMI DEVELOPERS41482%22 Jun 2018Completed
Moreshwar park 4jamtha, 441108PRASANNA PLANNERS22780%9 Feb 2022Completed
PRIME PLATINUMZARI(RITHI), 441108UMAKANT VITTHAL MENDHE18303%9 Feb 2022Completed
Rivershore EstateSumthana & Takli, 441122Godrej Skyline Developers Ltd17580%16 Jun 2026Registered
ARS SAMRUDHICHAMPA, 441204SHREE VENKATESHWARA INNFRA DEVELOPERS16990%4 Dec 2020Registered
MAULI NAGAR 8BESA GHOGLI ROAD, 441108MAULI INFRATECH16530%25 Aug 2021Completed
MAHALAXMI NAGAR 41GUMGAON, 441108MAHALAXMI INFRACON158449%8 Oct 2024Registered
Shiv Kailasa Phase IIOpp. AIIMS, MIHAN, Nagpur, 441108Om Shivam Buildcon Private Limited147157%18 Jul 2021Registered
Godrej Forest EstateSumthana, 441122Dream World Landmarks LLP141497%15 Feb 2024Registered
BHEDE NAGARI -CHARITONAWADUT NAGAR, 440034DILIP GANPATRAO BHEDE11760%10 May 2022Registered
BROOKSIDEVILLAGE WELA HARISHCHANDRA AND VILLAGE KHARSOLI, 441304LOK8 INFRA PRIVATE LIMITED100348%13 Nov 2025Registered
A2 UniversalIsasani, 441110Aditya Anagha Multi State Credit Co-Operative Society Limited9910%29 Nov 2024Registered
SOHAM AND SANDESH CITYMOUJA: KANHOLI AND CHICHGHAT, 441108R SANDESH AND SOHAM DEVELOPERS95697%29 Dec 2023Completed
Nagpur MarinaMondha, 441110HOABL Impactum Land Private Limited9187%16 Jan 2026Registered
Sandesh Nagari-5Salaigodhani and Pewtha, 441108NMDS INFRA LLP8020%9 Jul 2024Completed
MAULI NAGAR 2PANJARI FARM, WARDHA ROAD, 441108MAULI ASSOCIATES7410%27 Jan 2020Completed
Godrej Orchard EstateGhogli, 440034Godrej Properties Limited74092%3 Jan 2023Completed
MAULI NAGAR 5OPP BELTARODI POLICE STATION, 441108MAULI INFRATECH7220%31 Oct 2020Completed
MAULI NAGAR 6BELTARODI, 441108PRAVIN JAIN & ASHOK SINGH6660%14 Dec 2020Completed
MELBOURNE CITYKALDONGRI, 440034M/S 4 PILLARS REALTY6620%27 Aug 2019Registration lapsed
SANDESH NAGARI - 4PEWATHA, 441108R SANDESH PROJECTS660100%15 Feb 2023Completed
Ozen Infinia CityMouza- Mohgaon, 441108Ozen Infrastructure6470%7 Nov 2024Registered
CANAL FRONT-02HINGNA, 441110SHIVAJI LAND BUILDERS AND DEVELOPERS6400%23 Oct 2021Registration lapsed
NIRMAL TRINITY TOWERSMouza-Harpur, 440009The Nirmal Ujjwal Credit Co-operative Society Limited6142%18 Jun 2024Registered
ANJANEYA NAGAR VMOUZA WARANGA, 441202Shri Anjaneya Developers Pvt. Ltd.5967%3 Jan 2023Registered
MAuli Nagar 12Hingna, 441110P SQUARE REALTY59595%15 Jun 2022Completed
Sai Nagri 13Kalamana, 441204Saidham Builders and Infratech5813%29 Jan 2026Registered
MAYA NAGARI PARK-1MOUZA KARLI, 441501PRAVIN WAMANRAO BHOYAR57280%28 Apr 2023Registered
KANCHAN NAGARI 7WANADONGARI, SANGAM ROAD, 441110SHUBH INFRASTRUCTURE5610%28 Apr 2022Completed
PREMIER HERITAGE WADDHAMNA -182Near Gram Panchayat Office, 440023PREMIER HERITAGE56183%3 Mar 2021Completed
MAHALAXMI NAGAR 51 ANAYASumthana, 441108MAHALAXMI INFRAVENTURES LLP5540%22 Sep 2026Registered
Vrindavan Phase-3Jamtha, 441122Radha Madhav Developers55364%30 Mar 2022Completed
MAULI TOWN- 21KH NO 40/1/2(PART), 41 (PART),42/2, 42/3, 52/1(PART), 52/2, 53/1 (PART), 54(PART), 441110KIRTISAGAR REALTY PRIVATE LIMITED55279%4 Mar 2024Completed
Royal PalmsSavner Nagpur, 441107SAFFRON INDUSTRIES LIMITED53818%17 Jan 2023Registered
B PARKPOPULARLY KNOWN AS BUDHWAR BAZAR, MAHAL, NAGPUR, 440002VIDARBHA INFOTECH B PARK SPV LLP5340%8 Apr 2025Registered
Swapnapurtee - A Project by NMCMouza Nari, 440026SANDEEP DWELLERS PVT. LTD.5330%24 Sep 2026Registered
AURA - 4Degma (bujurk), 441110Pravin Bhayyaji Totalwar52146%22 Aug 2017Registration lapsed
ROYAL PARKHarapur, 440009RAI UDYOG GLOBE ASSOCIATES5180%5 Oct 2026Registered
METRO HOMESBehind Champa Weekly Market, 441204LISHA YOGESH GANGWANI5140%25 Aug 2021Registration lapsed
MAULI NAGAR 4NEAR BELTARODI POLICE STATION, 441108MAULI INFRATECH5000%24 Nov 2020Completed
HANUMAN NAGARHALADGAON, 441204RAJESH GYANDEORAO TIDKE4970%31 May 2019Registration lapsed
KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGEWANJARA, 440026KARAN KOTHARI BUSINESS PARK PRIVATE LIMITED4960%5 Apr 2024Registered
MAHALAXMI NAGAR - 45 : SECTOR 2SUMTHANA, 441108MAHALAXMI INFRACON47344%20 Oct 2025Registered
AYODHYA BHUMIGonhi Sim., 441204Ayodhya Niwas LLP47013%18 Aug 2025Registered
Sunrise ParkMouza Turakmari, 440016Sirsikar Developers & Builders Pvt. Ltd.47013%18 Dec 2019Registered
PREMIER HERITAGE WADDHAMNA -181Near Grampanchayat, 440023PREMIER HERITAGE46574%8 Mar 2021Completed
Kalpataru ArdeneVillage Khadka, 441122Azure Tree Enviro Farms Private Limited4470%9 Aug 2024Registered
DERA GREENS 3NA, 441501NARAYAN CHANDIRAM DEMBLE44035%7 Nov 2024Registered
MAHALAXMI NAGAR-10KOTEWADA, 441122PADMALAXMI INFRTECH440100%9 May 2019Completed
Moreshwar Park 3Nagpur, 440001PRASANNA BUILDCON4353%25 Oct 2021Completed
SHREE RAM EMPIRELavha, 440023SANJAY PAIDLEWAR, NITISH CHORDIA AND SHISHIR DIOTE4340%18 Feb 2026Registered
MAHALAXMI NAGAR-49 AYANASONDAPAR, 441110MAHALAXMI INFRAVENTURES LLP4240%10 Apr 2026Registered
GARDEN HOMES ATHARVA NAGARI VIIPIPLA, 440034ATHARVA INFRASTRUCTURES42071%11 Apr 2022Registered
KUKREJA PARIS CITY WING-A, B, E AND FNEAR UMRED ROAD, 440024KUKREJA INFRASTRUCTURES41827%9 Jul 2024Registered
AADHAR NAGRI - IIKANHOLI DONGARGAON, 440010S R INFRA40896%12 Oct 2023Registered
SDPL Aashray Dabha IIDabha, 440023SANDEEP DWELLERS PVT. LTD.40534%2 Mar 2022Registered
Ozen City - Residential Layout Plan in Kh. No 192/A And 192/BNA, 441108Promoter name not stated in filing40091%24 Jan 2023Registered
Planning a launch in Nagpur? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Nagpur

TIRUPATI DEVELOPERS (65), SANDEEP DWELLERS PVT. LTD. (26), Luxora Infrastructure Private Limited (23), Mahindra Bebanco Developers Limited (19), MHADA (Nagpur board) (16), MAHALAXMI INFRACON (14). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Nagpur projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 35% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Nagpur project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Nagpur district?

Within the municipal corporation areas of Nagpur district the rate is 7 percent for men and joint buyers and 6 percent for a woman buying in her sole name (metro cess and local body tax included). Municipal council areas pay 4 percent and gram panchayat areas 3 percent. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Nagpur registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Nagpur project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Nagpur district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.