Home / Browse projects / Nagpur, Maharashtra / ARS SAMRUDHI

Registered No litigation declared Residential / Group Housing project

ARS SAMRUDHI

By SHREE VENKATESHWARA INNFRA DEVELOPERS

RG-MH-02709 · RERA P50500027350 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 132 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2035Possession promisedmoved 132 months from the original
0 of 1485Construction stages doneacross 135 buildings; furthest along: Excavation, 0%
1,699 of 1,699Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

ARS SAMRUDHI is a Residential / Group Housing project by SHREE VENKATESHWARA INNFRA DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500027350 on 4 Dec 2020. Possession is promised by 30 Jun 2035. The completion date has moved by 132 months from the original filing. 0 of the 1,699 units on this registration are recorded sold or booked, and 0 of 1485 construction stages are filed complete.

At a glance

Project

  • NameARS SAMRUDHI
  • TypeResidential / Group Housing
  • Location
    • JABALPUR NAGPUR HIGHWAY
    • CHAMPA
    • Champa (Rithi)
    • Parseoni
    • Nagpur
    • 441204
  • Pincode441204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500027350
  • ReraGenie IDRG-MH-02709

Builder

  • NameSHREE VENKATESHWARA INNFRA DEVELOPERS
  • Entity typePartnership
  • PartnersVENKAT RAMANA RAMASWAMY, KRISHNA KUMAR RAMASWAMY, SHREE RAM KUMAR RAMASWAMY
  • Authorised SignatoryRaja ratnam Ramaswamy

Key dates

this monthRegisteredDec 2020First promiseJun 2024Revised toJun 2035

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2020
  • Promised completion30 Jun 2035
  • Revised completionRevised to 30 Jun 2035 (originally 30 Jun 2024)
  • Buildings135 building records
  • Documents filed126 files

Current status

0%0 of 1,699 units booked

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EWS 1 - A1NA3312012
EWS 1- A2NA3312012
EWS 1 - A3NA3312012
EWS 1 - A4NA3312012
EWS 1 - A5NA3312012
EWS 1 - A6NA3312012
EWS 1 - A7NA3312012
EWS 1 - A8NA3312012
EWS 1 - A9NA3312012
EWS 1 - A10NA3312012
EWS 1 - A11NA3312012
EWS 1 - A12NA3312012
EWS 1 - A13NA3312012
EWS 1 - A14NA3312012
EWS 1 - A15NA3312012
EWS 1 - A16NA3312012
EWS 1 - A17NA3312012
EWS 1 - A18NA3312012
EWS 1 - A19NA3312012
EWS 1 - A20NA3312012
EWS 1 - A21NA3312012
EWS 1 - A22NA3312012
EWS 1 - A23NA3312012
EWS 1 - A24NA3312012
EWS 1 - A25NA3312012
EWS 1 - A26NA3312012
EWS 1 - A27NA3312012
EWS 1 - A28NA3312012
EWS 1 - A29NA3312012
EWS 1 - A30NA3312012
EWS 1 - A31NA3312012
EWS 1 - A32NA3312012
EWS 1 - A33NA3312012
EWS 1 - A34NA3312012
EWS 1 - A35NA3312012
EWS 1 - A36NA3312012
EWS 1 - A37NA3312012
EWS 1 - A38NA3312012
EWS 1 - A39NA3312012
EWS 1 - A40NA3312012
EWS 1 - A41NA3312012
EWS 1 - A42NA3312012
EWS 1 - A43NA3312012
EWS 1 - A44NA3312012
EWS 1 - A45NA3312012
EWS 1 - A46NA3312012
EWS 1 - A47NA3312012
EWS 1 - A48NA3312012
EWS 1 - A49NA3312012
EWS 1 - A50NA3312012
EWS 1 - A51NA3312012
EWS 1 - A52NA3312012
EWS 1 - A53NA3312012
EWS 1 - A54NA3312012
EWS 1 - A55NA3312012
EWS 1 - A56NA3312012
EWS 1 - A57NA3312012
EWS 1 - A58NA3312012
EWS 1 - A59NA3312012
EWS 1 - A60NA3312012
EWS 1 - A61NA3312012
EWS 1 - A62NA3312012
EWS 1 - A63NA3312012
EWS 1 - A64NA3312012
EWS 1 - A65NA3312012
EWS 1 - A66NA3312012
EWS 1 - A67NA3312012
EWS 1 - A68NA3312012
EWS 1 - A69NA3312012
EWS 1 - A70NA3312012
EWS 1 - A71NA3312012
EWS 1 - A72NA3312012
EWS 1 - A73NA3312012
EWS 1 - A74NA3312012
EWS 1 - A75NA3312012
EWS 1 - A76NA3312012
EWS 1 - A77NA3312012
EWS 1 - A78NA3312012
EWS 1 - A79NA3312012
EWS II - B1NA33606
EWS II - B2NA33606
EWS II - B3NA33606
EWS II - B4NA33606
EWS II - B5NA33606
EWS II - B6NA33606
EWS II - B7NA33606
EWS II - B8NA33606
EWS II - B9NA63606
EWS II - B10NA33606
EWS II - B11NA33606
EWS II - B12NA33606
EWS II - B13NA33606
EWS II - B14NA33606
EWS II - B15NA33606
EWS II - B16NA33606
EWS II - B17NA33606
EWS II - B18NA33606
EWS II - B19NA33606
EWS II- B20NA33606
LIG I - C1NA3312012
LIG I - C2NA3312012
LIG I - C3NA3312012
LIG I - C4NA3312012
LIG I - C5NA3312012
LIG I - C6NA3312012
LIG I - C7NA3312012
LIG II - D1NA3318018
LIG II - D2NA3318018
LIG II - D3NA3318018
LIG II - D4NA3318018
LIG II - D5NA3318018
LIG II - D6NA3318018
LIG II - D7NA3318018
LIG II - D8NA3318018
LIG II - D9NA3318018
LIG II - D10NA3318018
LIG II - D11NA3318018
LIG II - D12NA3318018
LIG II - D13NA3318018
LIG II - D14NA3318018
LIG II - D15NA3318018
LIG II - D16NA3318018
LIG II - D17NA3318018
LIG II - D18NA3318018
LIG II - D19NA3318018
LIG II - D20NA3318018
LIG II - D21NA3318018
LIG II - D22NA3318018
LIG II - D23NA3318018
LIG II - D24NA3318018
LIG II - D25NA3318018
LIG II - D26NA3318018
LIG II - D27NA3318018
LIG II - D28NA3318018
CONVIENT SHOPPINGNA2204343

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 135 buildings; the table lists the first 20.

0 of 1485 construction stages are filed complete across 135 buildings. The stage furthest along is Excavation, at 0%.

EWS 1 - A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1- A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A110%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A130%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A150%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A170%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A180%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A190%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EWS 1 - A200%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2738

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,738
Open Space2,738
BuildingOpen SpaceTotal
EWS 1 - A12020
EWS 1- A22020
EWS 1 - A32020
EWS 1 - A42020
EWS 1 - A52020
EWS 1 - A62020
EWS 1 - A72020
EWS 1 - A82020
EWS 1 - A92020
EWS 1 - A102020
EWS 1 - A112020
EWS 1 - A122020
EWS 1 - A131919
EWS 1 - A141919
EWS 1 - A151919
EWS 1 - A161919
EWS 1 - A171919
EWS 1 - A181919
EWS 1 - A191919
EWS 1 - A201919
EWS 1 - A211919
EWS 1 - A221919
EWS 1 - A231919
EWS 1 - A241919
EWS 1 - A251919
EWS 1 - A261919
EWS 1 - A271919
EWS 1 - A281919
EWS 1 - A291919
EWS 1 - A301919
EWS 1 - A311919
EWS 1 - A321919
EWS 1 - A331919
EWS 1 - A341919
EWS 1 - A351919
EWS 1 - A361919
EWS 1 - A371919
EWS 1 - A381919
EWS 1 - A391919
EWS 1 - A401919
EWS 1 - A411919
EWS 1 - A421919
EWS 1 - A431919
EWS 1 - A441919
EWS 1 - A451919
EWS 1 - A461919
EWS 1 - A471919
EWS 1 - A481919
EWS 1 - A491919
EWS 1 - A501919
EWS 1 - A511919
EWS 1 - A521919
EWS 1 - A531919
EWS 1 - A541919
EWS 1 - A551919
EWS 1 - A561919
EWS 1 - A571919
EWS 1 - A581919
EWS 1 - A591919
EWS 1 - A601818
EWS 1 - A611818
EWS 1 - A621818
EWS 1 - A631818
EWS 1 - A641818
EWS 1 - A651818
EWS 1 - A661818
EWS 1 - A671818
EWS 1 - A681818
EWS 1 - A691818
EWS 1 - A701818
EWS 1 - A711818
EWS 1 - A721818
EWS 1 - A731818
EWS 1 - A741818
EWS 1 - A751818
EWS 1 - A761818
EWS 1 - A771818
EWS 1 - A781818
EWS 1 - A791818
EWS II - B11010
EWS II - B21010
EWS II - B31010
EWS II - B41010
EWS II - B51010
EWS II - B61010
EWS II - B71010
EWS II - B81010
EWS II - B91010
EWS II - B101010
EWS II - B111010
EWS II - B121010
EWS II - B1399
EWS II - B1499
EWS II - B1599
EWS II - B1699
EWS II - B1799
EWS II - B1899
EWS II - B1988
EWS II- B2088
LIG I - C12222
LIG I - C22121
LIG I - C32121
LIG I - C42121
LIG I - C52121
LIG I - C62121
LIG I - C72020
LIG II - D13333
LIG II - D23333
LIG II - D33333
LIG II - D43333
LIG II - D53333
LIG II - D63333
LIG II - D73232
LIG II - D83232
LIG II - D93131
LIG II - D103131
LIG II - D113131
LIG II - D123131
LIG II - D133131
LIG II - D143131
LIG II - D153131
LIG II - D163131
LIG II - D173131
LIG II - D183131
LIG II - D193131
LIG II - D203131
LIG II - D213131
LIG II - D223131
LIG II - D233131
LIG II - D243131
LIG II - D253131
LIG II - D263131
LIG II - D273131
LIG II - D283131
CONVIENT SHOPPING2626

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area192,562 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMaharashtra Housing And Area Developement Authority
Permissible FSI84031.79
Proposed, not sanctioned84,032 sq m
Buildings approved135
Buildings sanctioned135

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCITY UNION BANK LTD, RANIGUNJ, SECUNDARABAD, HYDERABAD, TELANGANA

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanket Dhamankar
EngineerRAJESH RAJANKAR
EngineerMd shahnewaz Alam
Chartered AccountantT S N MURTHY
Chartered AccountantAPJ & Associate
Chartered AccountantPravin dhiran & co.
PartnerRole in project
SHREE VENKATESHWARA INNFRA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23072502128Jun 2024 → Jun 2035

Reason as filed by the promoterThe delay in the registration of the project was primarily due to the absence of a proper approach road to the project site.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2035

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1_0001.pdf27 Jul 2026
Withdrawal Update Form 2File: ARS Samrudhi - Engineers Certificate.pdf27 Jul 2026
Withdrawal Update Form 3File: ARS - Samrudhi - CA Certificate.pdf27 Jul 2026
Layout approvalFile: Architect declaration.pdf13 Jul 2026
Layout approvalFile: 1_ Map Sheet 1.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 1.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 2.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 3.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 4.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 5.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 6.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 7.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 8.pdf10 Jun 2026
Building plan approvalFile: 1_ Map Sheet 9.pdf10 Jun 2026
Withdrawal Update Form 1File: form 1_0001.pdf8 Jun 2026
Withdrawal Update Form 2File: form 2_0001.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3_0001.pdf8 Jun 2026
Withdrawal Update Form 1File: 20_form 1 30-09-2025.pdf24 Feb 2026
Withdrawal Update Form 2File: form -2 30-092025.pdf24 Feb 2026
Withdrawal Update Form 3File: Form-3 30-09-2025.pdf24 Feb 2026
Form 1File: 16_form 1 30-09-2024.pdf5 Jan 2026
Form 2File: form -2 30-09-2024.pdf5 Jan 2026
Form 3File: Form-3 30-09-2024.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: 16_Annexure 29 30-09-2024.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: 17_Annexure 29 31-12-2024.pdf5 Jan 2026
Form 1File: 17_form 1 31-12-2024.pdf5 Jan 2026
Form 2File: form -2 31-12-2024.pdf5 Jan 2026
Form 3File: Form-3 31-12-2024.pdf5 Jan 2026
Form 1File: 18_form 1 31-03-2025.pdf5 Jan 2026
Form 2File: form -2 31-03-2025.pdf5 Jan 2026
Form 3File: Form-3 31-03-2025.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: 18_Annexure 29 31-03-2025.pdf5 Jan 2026
Withdrawal Update Form 1File: 19_form 1 30-06-2025.pdf5 Jan 2026
Withdrawal Update Form 1File: 20_form 1 30-09-2025.pdf5 Jan 2026
Withdrawal Update Form 2File: form -2 30-06-2025.pdf5 Jan 2026
Withdrawal Update Form 2File: form -2 30-092025.pdf5 Jan 2026
Withdrawal Update Form 3File: Form-3 30-06-2025.pdf5 Jan 2026
Withdrawal Update Form 3File: Form-3 30-09-2025.pdf5 Jan 2026
Form 5 (FY 2021-2022)File: Form 5 31-03-2022.pdf5 Jan 2026
Form 5 (FY 2022-2023)File: form 5-31-03-2023.pdf5 Jan 2026
Form 5 (FY 2023-2024)File: FORM 5 31-3-24.pdf5 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 31-03-2025.pdf5 Jan 2026
Form 2A (FY 2021-2022)File: Form -2A 31-03-2022.pdf1 Nov 2025
Form 2A (FY 2022-2023)File: Form -2A 31-03-2023.pdf1 Nov 2025
Form 2A (FY 2023-2024)File: Form -2A 31-03-2024.pdf1 Nov 2025
Form 2A (FY 2024-2025)File: Form -2A 31-03-2025.pdf1 Nov 2025
Form 1File: Form -1 31-12-2020.pdf31 Oct 2025
Form 2File: Form -2 31-12-2020.pdf31 Oct 2025
Form 3File: Form_3_CA_Cert 31-12-2020.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 31-12-20.pdf31 Oct 2025
Form 1File: form 1-31-03-2021.pdf31 Oct 2025
Form 2File: form -2 31-03-2021.pdf31 Oct 2025
Form 3File: 2_Form_3_CA_Cert 31-03-2021.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 31-03-21.pdf31 Oct 2025
Form 1File: Form 1 30-06-2021.pdf31 Oct 2025
Form 2File: form -2 30-06-2021.pdf31 Oct 2025
Form 3File: Form_3_CA_Cert 30-06-2021.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 30-06-21.pdf31 Oct 2025
Form 1File: form 1 30-09-2021.pdf31 Oct 2025
Form 2File: form -2 30-09-2021.pdf31 Oct 2025
Form 3File: Form-3 30-09-2021.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 30-09-21.pdf31 Oct 2025
Form 1File: Form 1 31-12-2021.pdf31 Oct 2025
Form 2File: Form -2 31-12-2021.pdf31 Oct 2025
Form 3File: Form -3 31-12-2021.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 31-12-21.pdf31 Oct 2025
Form 1File: form 1 31-03-2022.pdf31 Oct 2025
Form 2File: form -2 31-03-2022.pdf31 Oct 2025
Form 3File: Form-3 31-03-2022.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 31-03-22.pdf31 Oct 2025
Form 1File: form 1 30-06-2022.pdf31 Oct 2025
Form 2File: form -2 30-06-2022.pdf31 Oct 2025
Form 3File: Form-3 30-06-2022.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 30-06-2022.pdf31 Oct 2025
Form 1File: form 1 30-09-2022.pdf31 Oct 2025
Form 2File: form -2 30-09-2022.pdf31 Oct 2025
Form 3File: Form-3 30-09-2022.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29 30-09-2022.pdf31 Oct 2025
Form 1File: form 1 31-12-2022.pdf31 Oct 2025
Form 2File: form -2 31-12-2022.pdf31 Oct 2025

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 132 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARS SAMRUDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAMPA2,800+ in Nagpur

Builder: SHREE VENKATESHWARA INNFRA DEVELOPERS

SHREE VENKATESHWARA INNFRA DEVELOPERS has 1 registration on MahaRERA, including ARS SAMRUDHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ARS SAMRUDHI is delayed beyond 30 Jun 2035?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARS SAMRUDHI?

The registered promoter entity is SHREE VENKATESHWARA INNFRA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARS SAMRUDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARS SAMRUDHI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARS SAMRUDHI?

The professionals named in the filing: Architect: Sanket Dhamankar; Engineer: RAJESH RAJANKAR; Engineer: Md shahnewaz Alam; Chartered Accountant: T S N MURTHY; Chartered Accountant: APJ & Associate; Chartered Accountant: Pravin dhiran & co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARS SAMRUDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARS SAMRUDHI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARS SAMRUDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.