Completed Litigation declared Plotted project

Godrej Orchard Estate

By Godrej Properties Limited

RG-MH-30457 · RERA P50500048466 · Last updated on MahaRERA portal: 20 Apr 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 16 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
56 of 740Units unsoldnot recorded sold or booked
16Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Godrej Orchard Estate is a Plotted project by Godrej Properties Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500048466 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2024. 684 of the 740 units on this registration are recorded sold or booked. 16 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Orchard Estate
  • TypePlotted
  • Location
    • Ghogli Road
    • Ghogli
    • Besa
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500048466
  • ReraGenie IDRG-MH-30457

Builder

  • NameGodrej Properties Limited
  • Entity typeCompany
  • CINL74120MH1985PLC035308
  • GSTIN27AAACG3995M1Z1
  • Named personPirojsha Adi Godrej
  • DirectorsJAYASHREE VAIDHYANTHAN, Indu 8003991819 Bhushan, Gaurav Pandey, Sumeet Subhash Narang, Sutapa Banerjee, Nadir Godrej
  • Other registrations27 more →
  • Completed5 of 28
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects35 →

Key dates

this monthRegisteredJan 2023PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed70 files

Current status

92%684 of 740 units booked
81.5%Work done, per cost certificate

Figures as on 20 Apr 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes40%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area231,115 sq m
Land owned byThe promoter
Named landownersNone
Declared on29 Sep 2024

Approvals and building plan

Sanctioning authorityNMRDA
Permissible FSI223213.7
Proposed, not sanctioned223,214 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAxis Bank Limited, Mg House, Rabindranath Tagore Road, besides Board Office, Civil Lines, Nagpur 440
Estimated costRs 106.30 cr
Cost incurredRs 86.65 cr
Work done81.51%
BuildingWingEstimatedIncurred
NA Plot Without StructureNARs 93.39 crRs 76.48 cr
-NARs 12.91 crRs 10.17 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Nawathe Architects
EngineerCBM Engineers
Chartered AccountantM D Deshpande & Co.
Chartered AccountantBSR & Co. LLP
PartnerRole in project
Godrej Properties Limited-

Litigation declared3

CaseCourtStatus
1347/2022Civil Judge Senior Division NagpurOngoing
Spl.C.S/2022Civil Judge Senior DivisionOngoing
1113/2023Civil JudgeOngoing

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC004000000050551Kailas Vitthalrao SurkarGodrej Properties Limited01/10/2023
CC12400779Kshitij Raghaw SaranGodrej Properties Limited14/11/2024
CC12400785Tushar GuptaGodrej Properties Limited15/11/2024
CC12400788Vivek IlmeGodrej Properties Limited15/11/2024
CC12400792Milind DhakateGodrej Properties Limited16/11/2024
CC12400803Nitin KhadatkarGodrej Properties Limited17/11/2024
CC12400986Sanjay Govindrao KhangarGodrej Properties Limited03/12/2024
CC12401266Vinod KambleGodrej Properties Limited28/12/2024
CC12401269Bhushankumar SakharwadeGodrej Properties Limited29/12/2024
CC12501561Yashraj SinghGodrej Properties Limited12/05/2025
CC12502374Nilesh Marotrao DhobleGodrej Properties Limited13/07/2025
CC12502427Navin Nandkishor JaiswalGodrej Properties Limited16/07/2025
CC12502676Dnyanesh ChandewarGodrej Properties Limited01/08/2025
CC12502815Vijay KshirsagarGodrej Properties Limited11/08/2025
CC12503392Sumeet MankarGodrej Properties Limited22/09/2025
CC12503406Maneesh BiriaGodrej Properties Limited23/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jul 2023

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GOE Form 3.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Orchard Q4.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Orchard Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Orchard Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: GOE - Declaration.pdf19 Apr 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration Orchard.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Orchard_11zon.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 last.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Orchard Form-2.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 last.pdf10 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Q 4 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 24.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 24.pdf15 Oct 2024
Form 5 (FY 2024-2025)File: Form 5.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate dated 09 july 24.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate dated 15 july 2024.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE dated 15 july 2024.pdf15 Jul 2024
Copy of the legal title reportFile: Rejoinder No2.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q4.pdf23 Apr 2024
Copy of the legal title reportFile: Rejoinder No2.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q4.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q4.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Q3_compressed.pdf8 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Q3_compressed.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Q-3.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3_compressed.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: RERA Data Nagpur Scan_compressed.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTICATE_compressed.pdf10 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_compressed.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf10 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - 23-24_compressed.pdf29 Sep 2023
Building plan approval or NA orderFile: 1st RL_compressed.pdf8 Jul 2023
Building plan approval or NA orderFile: 2nd RL_compressed (1).pdf8 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 1st RL_compressed.pdf8 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 2nd RL_compressed (1).pdf8 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023 Q1 ARCHITECT CERTIFICATE.pdf8 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2023 Q1 ENGINEER CERTIFICATE.pdf8 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory_Signed.pdf8 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2023 Q1 FORM 3 CA CERTIFICATE.pdf8 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complection Certificate.pdf8 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complection Certificate.pdf8 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Progress Certificate.pdf8 Jul 2023
Copy of the legal title reportFile: REJOINDER-GODREJ ORCHARD ESTATE_compressed.pdf24 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certficate.pdf24 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed MDD_Godrej Orchard Estate_Mar-23-OMD.pdf24 Apr 2023
Layout approvalFile: Layout Approval (1).pdf27 Dec 2022
Copy of Layout Approval (in case of layout)File: Layout Approval (1).pdf27 Dec 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf27 Dec 2022
CERSAI detailsFile: CERSAI Report 271222.pdf27 Dec 2022
Proforma of Agreement for saleFile: AFS_NAgpur_Orchard Estate 27122022.pdf27 Dec 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrance -Finance.pdf2 Dec 2022
Details of encumbrances concerned to FinanceFile: Details of encumbrance -Legal.pdf2 Dec 2022
Details of encumbrances concerned to LegalFile: Details of encumbrance -Finance.pdf2 Dec 2022
Details of encumbrances concerned to LegalFile: Details of encumbrance -Legal.pdf2 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: Cover Letter.pdf2 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Nagpur (02122022).pdf2 Dec 2022
Other - LegalFile: Application Form 02122022 (final).pdf2 Dec 2022
Proforma of Allotment letterFile: Proforma Draft Allotment Letter 01122022.pdf1 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Residential Allotment Letter 30112022.pdf1 Dec 2022
Building plan approval or NA orderFile: Cover Letter.pdf30 Nov 2022
PAN CardFile: GPL PAN CARD.pdf30 Nov 2022
Copy of the legal title reportFile: TITLE REPORT- GODREJ_compressed (1).pdf30 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Cover Letter.pdf30 Nov 2022
Declaration in FORM BFile: Form B Declaration 29112022.pdf30 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30112022.pdf30 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 301124_compressed.pdf30 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf30 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank account declaration.pdf30 Nov 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
The Trees Residential Phase I5th Floor Godrej One Pirojshanagar Vikhroli East Mumbai Maharashtra-40007973CompletedJun 2021Feb 2019

How this compares with Nagpur

92%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Orchard Estate on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghogli2,800+ in Nagpur

2 kmGodrej Orchard EstateCompleted 8Lapsed / revoked 12Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: Godrej Properties Limited

Godrej Properties Limited has 28 registrations on MahaRERA, including The Trees, Residential Phase 1 and Godrej Anandam. Its filings disclose 35 earlier MahaRERA projects: declares 28 of 30 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Godrej Orchard Estate is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Orchard Estate?

The registered promoter entity is Godrej Properties Limited, a company as per the filing. Its CIN L74120MH1985PLC035308 and GSTIN 27AAACG3995M1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Orchard Estate?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Orchard Estate?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Orchard Estate?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Orchard Estate?

The professionals named in the filing: Architect: Avinash Nawathe Architects; Engineer: CBM Engineers; Chartered Accountant: M D Deshpande & Co.; Chartered Accountant: BSR & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Orchard Estate?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Orchard Estate. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Orchard Estate to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.