Home / Browse projects / Nagpur, Maharashtra / KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE

Registered No litigation declared Commercial project

KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE

By KARAN KOTHARI BUSINESS PARK PRIVATE LIMITED

RG-MH-42979 · RERA P50500055653 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 55.10 crore secured on the land, in favour of Bank of Baroda, Union Bank of India
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 75%
496 of 496Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE is a Commercial project by KARAN KOTHARI BUSINESS PARK PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500055653 on 5 Apr 2024. Possession is promised by 15 Oct 2027. 0 of the 496 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameKARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE
  • TypeCommercial
  • Location
    • WANJARA
    • Nagpur (Rural)
    • Nagpur
    • 440026
  • Pincode440026
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500055653
  • ReraGenie IDRG-MH-42979

Builder

  • NameKARAN KOTHARI BUSINESS PARK PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsNITIN MAHESH KOTHARI, CHANDRA SURESH KOTHARI, KARAN NARENDRA KOTHARI

Key dates

this monthRegisteredApr 2024PromisedOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion15 Oct 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed122 files

Current status

0%0 of 496 units booked
54.3%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PLOT NO 1NA640240240
PLOT NO 2NA640256256

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.

PLOT NO 147%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
PLOT NO 261%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes65%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes40%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed2524

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,524
Closed/Covered2,524
BuildingClosed/CoveredTotal
PLOT NO 11,1931,193
PLOT NO 21,3311,331

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area23,821 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofBank of Baroda, Union Bank of India
Secured amountRs 55.10 crore
CERSAI search filedYes
Declared on28 Jul 2025
LandownerVillageDistrict
KOTHARI POTTERY WORKSNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI55596.52
Proposed, not sanctioned55,597 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchV N SANTHE BUILDING OPP LOKMAT, 5, WARDHA ROAD NAGPUR 440002
Estimated costRs 74.11 cr
Cost incurredRs 40.25 cr
Work done54.31%
BuildingWingEstimatedIncurred
PLOT NO 1NARs 74.11 crRs 40.25 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPratham Pincha
ArchitectAkash Mohota
EngineerVikrant Chaubey
EngineerHemant Mohod
EngineerSachin Manoj Jaiswal
EngineerPatankar Consultants Private Limited
EngineerPrashant Farfar
Chartered AccountantMJM Associates
PartnerRole in project
KARAN KOTHARI BUSINESS PARK PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Oct 2027

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Kothari karan Form 2A.pdf24 Jun 2026
Withdrawal Update Form 1File: KKBP Form-1.pdf22 Apr 2026
Withdrawal Update Form 2File: KKBPForm 2.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 Kothari Business Park Q4 FY 2025 26_compressed.pdf22 Apr 2026
Withdrawal Update Form 1File: KKBP FORM 1.pdf28 Jan 2026
Withdrawal Update Form 2File: KARAN KOTHARI form 2.pdf28 Jan 2026
Withdrawal Update Form 3File: KARAN KOTHARI form 3.pdf28 Jan 2026
Withdrawal Update Form 1File: KKBP Form-1 Sep25 (1).pdf8 Nov 2025
Withdrawal Update Form 2File: KKBP Form-2 Sep25 (2).pdf8 Nov 2025
Withdrawal Update Form 3File: karan khotari form 3 july sept signed.pdf8 Nov 2025
Withdrawal Update Form 1File: KKBP Form-1 Sep25 (1).pdf7 Nov 2025
Withdrawal Update Form 2File: KKBP Form-2 Sep25 (1) signed.pdf7 Nov 2025
Withdrawal Update Form 3File: APRIL to june form 3 karan khotari (1) new signed.pdf7 Nov 2025
Form 1File: Form 1 KARAN khotari.pdf31 Oct 2025
Form 2File: form2 KARAN khotari.pdf31 Oct 2025
Form 3File: april to june form 3 karan khotari.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: dsbi april to june karan khotari.pdf31 Oct 2025
Form 1File: july to sept form 1 karan.pdf31 Oct 2025
Form 2File: july to sept form 2 karan.pdf31 Oct 2025
Form 3File: july to sept form 3 karan.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: july to sept dsbi karan.pdf31 Oct 2025
Form 1File: oct to dec karan form 1.pdf31 Oct 2025
Form 2File: oct to dec karan form 2.pdf31 Oct 2025
Form 3File: oct to dec karan form 3.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: oct to dec karan dsbi.pdf31 Oct 2025
Form 1File: jan to march karan form 1.pdf31 Oct 2025
Form 2File: jan to march karan form2.pdf31 Oct 2025
Form 3File: jan to march karan form3.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: jan to march karan dsbi.pdf31 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 july-Sept 24.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _Final.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Jul-Sept.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Apr-Jun 24.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jul-Sept 24.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Apr-Jun.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 july-Sept 24.pdf27 Nov 2024
Disclosure of sold/ booked inventoryFile: DSBI Apr-Jun 24.pdf25 Nov 2024
Disclosure of sold/ booked inventoryFile: DSBI Jul-Sept 24.pdf25 Nov 2024
Layout approvalFile: Site Plan - 1_heighlighted.pdf13 Mar 2024
Layout approvalFile: Site Plan - 1_heighlighted.pdf13 Mar 2024
Building plan approvalFile: First Floor - 3_26-3-24.pdf13 Mar 2024
Building plan approvalFile: 4 Second Floor - 4.pdf13 Mar 2024
Building plan approvalFile: 5 Third Floor - 5_.pdf13 Mar 2024
Building plan approvalFile: 6 Terrace Floor Plan - 6.pdf13 Mar 2024
Building plan approvalFile: Sheet No 7 of 11.pdf13 Mar 2024
Building plan approvalFile: 8 Second_Third Floor Measurement Plans - 8__new.pdf13 Mar 2024
Building plan approvalFile: 9 Sections Elevation plan - 9.pdf13 Mar 2024
Building plan approvalFile: 10 Amenity Space Plan - 10.pdf13 Mar 2024
Building plan approvalFile: 11 First_Second _ Third Floor Sections Plans - 11.pdf13 Mar 2024
Building plan approvalFile: Site Plan - 26-3-24.pdf13 Mar 2024
Building plan approvalFile: Ground Floor - 2_26-3-24.pdf13 Mar 2024
Building plan approvalFile: 3 First Floor - 3.pdf13 Mar 2024
Building plan approvalFile: 4 Second Floor - 4.pdf13 Mar 2024
Building plan approvalFile: 5Third Floor - 5_.pdf13 Mar 2024
Building plan approvalFile: 6 Terrace Floor Plan - 6_.pdf13 Mar 2024
Building plan approvalFile: 7 Ground_First Measurement Plan - 7__compressed.pdf13 Mar 2024
Building plan approvalFile: 8 Second_Third Measurement Plan - 8__compressed.pdf13 Mar 2024
Building plan approvalFile: 9 Sections Elevations Plan - 9_.pdf13 Mar 2024
Building plan approvalFile: 10 Amenity Space Plan - 10.pdf13 Mar 2024
Building plan approvalFile: 11 First_Second_Third Floor Section Plan - 11_.pdf13 Mar 2024
Copy of Layout Approval (in case of layout)File: Site Plan - 1_heighlighted.pdf13 Mar 2024
Copy of Layout Approval (in case of layout)File: Site Plan - 1_heighlighted.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: First Floor - 3_26-3-24.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 Second Floor - 4.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Third Floor - 5_.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Terrace Floor Plan - 6.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet No 7 of 11.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 8 Second_Third Floor Measurement Plans - 8__new.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 9 Sections Elevation plan - 9.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 Amenity Space Plan - 10.pdf13 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 11 First_Second _ Third Floor Sections Plans - 11.pdf13 Mar 2024

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WANJARA2,800+ in Nagpur

Builder: KARAN KOTHARI BUSINESS PARK PRIVATE LIMITED

KARAN KOTHARI BUSINESS PARK PRIVATE LIMITED has 1 registration on MahaRERA, including KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE is delayed beyond 15 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE?

The registered promoter entity is KARAN KOTHARI BUSINESS PARK PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE?

The professionals named in the filing: Architect: Pratham Pincha; Architect: Akash Mohota; Engineer: Vikrant Chaubey; Engineer: Hemant Mohod; Engineer: Sachin Manoj Jaiswal; Engineer: Patankar Consultants Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.