Home / Browse projects / Nagpur, Maharashtra / Godrej Forest Estate

Registered Litigation declared Plotted project

Godrej Forest Estate

By Dream World Landmarks LLP

RG-MH-43445 · RERA P50500054903 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 7 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
41 of 1,414Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

Godrej Forest Estate is a Plotted project by Dream World Landmarks LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500054903 on 15 Feb 2024. Possession is promised by 31 Mar 2027. 1,373 of the 1,414 units on this registration are recorded sold or booked. 7 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Forest Estate
  • TypePlotted
  • Location
    • MADC Road
    • Sumthana
    • Hingna
    • Nagpur
    • 441122
  • Pincode441122
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500054903
  • ReraGenie IDRG-MH-43445

Builder

  • NameDream World Landmarks LLP
  • Entity typePartnership
  • PartnerSubhasish Pattanaik
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed141 files

Current status

97%1373 of 1,414 units booked
40.5%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes72%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area230,635 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on27 Sep 2024

Approvals and building plan

Sanctioning authorityNMRDA
Permissible FSI423676.57
Proposed, not sanctioned55,575 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAxis Bank Ltd Mg House Rabindranath Tagore Road beside Board Office Civil Lines Nagpur
Estimated costRs 37.17 cr
Cost incurredRs 15.04 cr
Work done40.46%
BuildingWingEstimatedIncurred
-NARs 37.17 crRs 15.04 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Nawathe
EngineerCBM Engineers
Chartered AccountantSamir Hussain & Co
Chartered AccountantBSR & Co. LLP
PartnerRole in project
Dream World Landmarks LLP-

Litigation declared1

CaseCourtStatus
004000000110614/2024RERA TribunalOngoing

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC004000000110614Mantri Trinity Projects Private LimitedDream World Landmarks LLP25/06/2024
CC12400144DR Nikhil Ashok BaxiDR NIKHIL ASHOK BAXI18/09/2024
CC12400600MONIKA NILESH NIKHADEDream World Landmarks LLP28/10/2024
CC12500254Nilesh Chandrakant PatilDream World Landmarks LLP24/01/2025
CC12500623ASHISH MAKRANIDream World Landmarks LLP22/02/2025
CC12503821AMAR KAPOORDream World Landmarks LLP01/11/2025
CC12603457Abhijeet Rameshsingh RajputDream World Landmarks LLP05/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate Q1 26-27.pdf15 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate Q1 26-27.pdf15 Jul 2026
Withdrawal Update Form 3File: CA Certificate Q1 26-27 compressed.pdf15 Jul 2026
Withdrawal Update Form 1File: Q4 25-26 GFE Architect Certificate.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: SIGNED CA CERTIFICATE Q4 25-26.pdf20 Apr 2026
Withdrawal Update Form 1File: GFE Form 1 Architect Certificate Q3 25-26.pdf19 Jan 2026
Withdrawal Update Form 2File: Q3 GFE Engineer Certificate 25-26_compressed (1).pdf19 Jan 2026
Withdrawal Update Form 3File: Final 25-26 Q3 GFE FORM 3 CA CERTIFICATE.pdf19 Jan 2026
Withdrawal Update Form 1File: GFE Architectu0027s Certificate Q2 25-26.pdf14 Oct 2025
Withdrawal Update Form 2File: GFE Q2 25-26 Engineers Certificate.pdf14 Oct 2025
Withdrawal Update Form 3File: GFE Q2 25-26 CA Certificate.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: MahaRERA Form 2A GFE FY 24-25.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: GFE DWLLLP FORM-5.pdf10 Sep 2025
Withdrawal Update Form 1File: Form 1 _ Godrej Forest Estate _ Q1FY26.pdf23 Jul 2025
Withdrawal Update Form 1File: Q1 FY 25-26Architect certificate of Godrej Forest Estate.pdf23 Jul 2025
Withdrawal Update Form 1File: Q1 FY 25-26Architect certificate of Godrej Forest Estate.pdf23 Jul 2025
Withdrawal Update Form 2File: Form 2 _ Godrej Forest Estate _ Q1FY26.pdf23 Jul 2025
Withdrawal Update Form 2File: Form 2 _ Godrej Forest Estate _ Q1FY26.pdf23 Jul 2025
Withdrawal Update Form 2File: Form 2 _ Godrej Forest Estate _ Q1FY26.pdf23 Jul 2025
Withdrawal Update Form 3File: Form 3 _ Godrej Forest Estate _ Q1FY26.pdf23 Jul 2025
Withdrawal Update Form 3File: signed form 3 forest estate.pdf23 Jul 2025
Withdrawal Update Form 3File: signed form 3 forest estate.pdf23 Jul 2025
Form 1File: Architect Certificate _ Form 1 _ Q4 FY25.pdf22 Jul 2025
Form 2File: Engineer certificate FOrest Q4.pdf22 Jul 2025
Form 3File: Q4 CA Certifcate FOREST.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory GFE - Q4 -2024-25.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifcate.pdf29 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifcate Q4 24-25.pdf29 May 2025
Other - TechnicalFile: MahaRERA Form 2A filled form-FY25-R-Scan.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: MahaRERA Form 2A filled form-FY24-R-Scan.pdf29 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Part 1 March.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate Part-2 March.pdf19 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: CA certificate Part 1 March.pdf19 May 2025
Disclosure of sold/ booked inventoryFile: Query Disclosure sold unsold.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Certificate.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 GFE Q1 25.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: GFE - Declaration.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Forest Q4.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate FOrest Q4.pdf11 Apr 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate Forest Estate.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWL LLP FORM 3 31ST MAR 24_11zon.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWL LLP FORM 3 30TH SEP 24_11zon.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWL LLP FORM 3 30TH JUNE 24_11zon.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DWL LLP FORM 3 31ST DEC 24_11zon.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Q-4 Forest 23-24 pdf.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Q-1 Forest 24-25.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Q-2 Forest 24-25.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Q-4 Forest 23-24 pdf.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Q-4 Forest 23-24 pdf.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold Q-3 Forest 24-25.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Forest Estate.pdf4 Feb 2025
Copy of the legal title reportFile: Revised TSR.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Forest.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Forest Form 2.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect's Certificate of Percentage of Completion of Work (Form 1).pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate (Form 3).pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer's Certificate on Cost incurred on Project (Form 2).pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate dated 08 july 24.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 15 july 2024.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate dated 15 july 2024.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE dated 15 july 2024.pdf15 Jul 2024
Proforma of Agreement for saleFile: AFS .pdf31 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Architect Certificate.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Q4.pdf4 May 2024
Other - FinanceFile: Godrej Forest Estate Cost Change Declaration.pdf4 May 2024
Proforma of Allotment letterFile: Allotment Letter.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Forest Estate -Engineer Certificate-Q4-FY23-24-Signed.pdf30 Apr 2024
Other - LegalFile: Amalgamation Order.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed engineers Certificate Forest Estate.pdf27 Apr 2024
Layout approvalFile: Final Approved Plan.pdf25 Apr 2024
Copy of Layout Approval (in case of layout)File: Final Approved Plan.pdf25 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Final Approval Certificate.pdf25 Apr 2024
Copy of the legal title reportFile: Title Search report - Final-compressed-part1.pdf15 Feb 2024
Copy of the legal title reportFile: Title Search report - Final-compressed-part2.pdf15 Feb 2024
Copy of the legal title reportFile: Title Search report - Final-compressed-part-3.pdf15 Feb 2024
Copy of the legal title reportFile: Title Search report - Final-compressed-part4.pdf15 Feb 2024
Copy of the legal title reportFile: Title Search report - Final-compressed-part5.pdf15 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Godrej PranaGodrej Prana Undri Hinjewadi Road Pune667CompletedJun 2019Late, Jan 2020

How this compares with Nagpur

97%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Forest Estate on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sumthana2,800+ in Nagpur

2 kmGodrej Forest EstateCompleted 1Lapsed / revoked 1Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: Dream World Landmarks LLP

DREAM WORLD LANDMARKS LLP has 3 registrations on MahaRERA, including Godrej Greens and Godrej Prana. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Godrej Forest Estate is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Forest Estate?

The registered promoter entity is Dream World Landmarks LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Forest Estate?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Forest Estate?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Forest Estate?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Forest Estate?

The professionals named in the filing: Architect: Avinash Nawathe; Engineer: CBM Engineers; Chartered Accountant: Samir Hussain & Co; Chartered Accountant: BSR & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Forest Estate?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Forest Estate. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Forest Estate to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.