LE GRANDE ROYALE
By VRINDAVAN CONSTRUCTIONS NAGPUR
RG-MH-74546 · RERA P50500053251 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LE GRANDE ROYALE is a Residential / Group Housing project by VRINDAVAN CONSTRUCTIONS NAGPUR in Nagpur, Maharashtra, registered with MahaRERA as P50500053251 on 23 Oct 2023. Possession is promised by 15 Oct 2027. 20 of the 60 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameLE GRANDE ROYALE
- TypeResidential / Group Housing
- Location
- MOUJE LENDRA
- KHARE TOWN
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440010
- Pincode440010
- RERA no.P50500053251
- ReraGenie IDRG-MH-74546
Builder
- NameVRINDAVAN CONSTRUCTIONS NAGPUR
- Entity typeOthers
- Named personsSIDDHANT SACHIN CHAWARE, VAIBHAV BANSISA MAHAJAN
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Oct 2023
- Promised completion15 Oct 2027
- Revised completionNone
- Buildings1 building record
- Documents filed106 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LE GRANDE ROYALE | NA | 16 | 15 | 60 | 0 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.
LE GRANDE ROYALE: 28% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership44
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VAISHALI W/O NITIN GALPHADE | Nagpur (M Corp.) | Nagpur |
| LALITA W/O SHAILENDRA DEO | Nagpur (M Corp.) | Nagpur |
| MILIND S/O LATE MADHUKAR SUDAME | Nagpur (M Corp.) | Nagpur |
| SUNANDA SUBHASH KORDE | Nagpur (M Corp.) | Nagpur |
| DEVEN SUBHASH KORDE | Nagpur (M Corp.) | Nagpur |
| SHRADDHA W/O SANJAY AMIN | Nagpur (M Corp.) | Nagpur |
| SANDEEP S/O LATE ANANT ALIAS ANAND JOHARI | Nagpur (M Corp.) | Nagpur |
| VISHWAMBER KUMAR BHOOMAIAH GANNARAPU | Nagpur (M Corp.) | Nagpur |
| SUNITA W/O VIPIN SHARMA | Nagpur (M Corp.) | Nagpur |
| ROGER S/O PETER GARVIN | Nagpur (M Corp.) | Nagpur |
| RAJEEV S/O JAIKRISHNA KAPALEY | Nagpur (M Corp.) | Nagpur |
| ANJALI WD/O LATE ARVIND PARCHURE | Nagpur (M Corp.) | Nagpur |
| SHILPA W/O MALHAR VISHWARUPE | Nagpur (M Corp.) | Nagpur |
| NAGORAO S/O MAROTRAO PARATE | Nagpur (M Corp.) | Nagpur |
| RAKHIL KUMAR RAJENDRA BHAGAT | Nagpur (M Corp.) | Nagpur |
| PRAKASH S/O PRABHAKARRAO RAJKARNE | Nagpur (M Corp.) | Nagpur |
| SHEKHAR DAMODHAR JAGDALE | Nagpur (M Corp.) | Nagpur |
| RAJAN S/O SURESH BHOLE | Nagpur (M Corp.) | Nagpur |
| NEETA W/O RAJAN BHOLE | Nagpur (M Corp.) | Nagpur |
| ANURADHA WD/O LATE RATNAKAR APHALE | Nagpur (M Corp.) | Nagpur |
| MUKTA D/O LATE RATNAKAR APHALE | Nagpur (M Corp.) | Nagpur |
| KALYANI D/O LATE RATNAKAR APHALE | Nagpur (M Corp.) | Nagpur |
| CHHAYADEVI WD/O LATE ARUN KUMAR YADAV | Nagpur (M Corp.) | Nagpur |
| VISHALKUMAR S/O LATE ARUN KUMAR YADAV | Nagpur (M Corp.) | Nagpur |
| AMRUTA D/O LATE ARUN KUMAR YADAV | Nagpur (M Corp.) | Nagpur |
| SOUDNYA WD/O SUBHASH JAGDALE | Nagpur (M Corp.) | Nagpur |
| HARSHAL SHANKARRAO TUPKARI | Nagpur (M Corp.) | Nagpur |
| BHAVNA W/O DUSHYANT SIDAM | Nagpur (M Corp.) | Nagpur |
| ANITA WD/O LATE VINODKUMAR JAISWAL | Nagpur (M Corp.) | Nagpur |
| ANOOP S/O LATE VINODKUMAR JAISWAL | Nagpur (M Corp.) | Nagpur |
| VINAY KALYANPUR BHAT DINKAR BHAT | Nagpur (M Corp.) | Nagpur |
| HEMANT S/O PADMANABH CHAFALE | Nagpur (M Corp.) | Nagpur |
| UNMESH S/O PADMANABH CHAFALE | Nagpur (M Corp.) | Nagpur |
| GAYATRI WD/O VINAYAK DESHKAR | Nagpur (M Corp.) | Nagpur |
| MILIND S/O LATE ASHOK GHULGHULE | Nagpur (M Corp.) | Nagpur |
| ABHISHEK S/O VINAYAK DESHKAR | Nagpur (M Corp.) | Nagpur |
| ANURAG S/O VINAYAK DESHKAR | Nagpur (M Corp.) | Nagpur |
| ANJALI W/O SHYAM VAIJAPURKAR | Nagpur (M Corp.) | Nagpur |
| VIPIN S/O RAMKRISHNA SHARMA | Nagpur (M Corp.) | Nagpur |
| SANJEEV S/O LATE ARVIND PARCHURE | Nagpur (M Corp.) | Nagpur |
| DHARMESH S/O LATE ARUN KUMAR YADAV | Nagpur (M Corp.) | Nagpur |
| SUNIL S/O SHRIDHAR CHARDE | Nagpur (M Corp.) | Nagpur |
| RAJESH S/O MANOHARLAL JAISWAL | Nagpur (M Corp.) | Nagpur |
| JAISHRI W/O RAJESH JAISWAL | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LE GRANDE ROYALE | NA | Rs 17.87 cr | Rs 7.33 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATHARVA GUPTA |
| Architect | AR ATHARVA GUPTA |
| Engineer | SACHIN MANOJ JAISWAL |
| Chartered Accountant | CA ANKIT TALREJA |
| Chartered Accountant | UTSAV SUMIT & ASSOCIATES |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| VRINDAVAN CONSTRUCTIONS NAGPUR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Oct 2027
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 LE GRANDE ROYALE MAR-2026.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: FORM-1 LE GRANDE ROYALE SEP-2025.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: FORM-2 LE GRANDE ROYALE MAR-2026.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: FORM-2 LE GRANDE ROYALE SEP-2025.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: FORM-3 LE GRANDE ROYALE MAR-2026.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: FORM-3 LE GRANDE ROYALE SEP-2025 SIZE.pdf | 20 May 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A MARCH 2026.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Form 1 LGR 31-3-26.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: FORM-2 DEC-25 LE GRAND ROYALE.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: form 3 le grande royale december 2025.pdf | 19 Apr 2026 |
| Withdrawal Update Form 1File: Form-1 DEC-25 Le Grande Royale.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2 DEC-25 LE GRAND ROYALE.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: form 3 le grande royale december 2025.pdf | 18 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Le Grande Royale.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Le Grande Royale.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: form 2 LGR sept 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: form 2 LGR sept 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 Le Grande Royale sep 2025 (2).pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 Le Grande Royale sep 2025 (2).pdf | 13 Oct 2025 |
| Form 5 (FY 2023-2024)File: form-5.pdf | 12 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 LGR (24-25).pdf | 12 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Le Grande Royale.pdf | 25 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 Le Grande Royale.pdf | 25 Sep 2025 |
| Withdrawal Update Form 3File: form 3 le grande royale.pdf | 25 Sep 2025 |
| Form 1File: FORM-1.pdf | 13 Jul 2025 |
| Form 2File: FORM-2.pdf | 13 Jul 2025 |
| Form 3File: FORM-3.pdf | 13 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD.pdf | 13 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: le g.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Le Grande Royle _March-25.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 LGR.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_LE GRANDE ROYALE_MAR 2025.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold LGR.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_P50500053251_Le Grande Royale 31-3-25.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 LGR.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 LGR.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 LGR.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold LGR.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 LGR_Dec-2024.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Le Grande Royle_Dec-2024.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Le Grande Royale_Dec-2024.pdf | 17 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Le Grande Royal Form 5.pdf | 4 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Inventery Details of LEGRANDE ROYALE_SEP_2024.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LEGRANDE ROYALE_SEP_2024.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 LEGRANDE ROYALE_SEP_2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 LEGRANDE ROYALE_SEP_2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LE GRAND ROYALE_Form-2-Engineers Certificate_Mar-24.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LE GRAND ROYALE_Form-2-Engineers Certificate_June-24.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Le Garnde Royale June 2024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_LE Grand Royale_June-24.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Le Gande Royale Form 1 June 2024.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Le Grande Royale_RERA_Form 2A_MAR-24.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_DEC-23.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_MAR-24.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LE Garden Royal Form 1 March 24.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: LE GRAND ROYALE_Form-2-Engineers Certificate_Dec-23.pdf | 13 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LE GRANDE.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_INVENTORY_P50500053251.pdf | 15 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Vaibhav.pdf | 11 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest_Rashi.pdf | 11 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest_Siddhant.pdf | 11 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Intreest Declaration -Owners.pdf | 11 Oct 2023 |
| Layout approvalFile: PLAN-1-3.pdf | 8 Oct 2023 |
| Building plan approvalFile: PLAN-1-3.pdf | 8 Oct 2023 |
| Building plan approvalFile: PLAN-4-5.pdf | 8 Oct 2023 |
| Building plan approvalFile: Building Plan Index.pdf | 8 Oct 2023 |
| PAN CardFile: 1 PAN VCN FRONT.pdf | 8 Oct 2023 |
| Copy of the legal title reportFile: Title Search_compressed (1).pdf | 8 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance_Finance.pdf | 8 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance_Legal.pdf | 8 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance_Finance.pdf | 8 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance_Legal.pdf | 8 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: PLAN-1-3.pdf | 8 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN-1-3.pdf | 8 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN-4-5.pdf | 8 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Index.pdf | 8 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert_B_266473_383RM0EKSign.pdf | 8 Oct 2023 |
| Declaration about Commencement CertificateFile: Declaration_ Commencement.pdf | 8 Oct 2023 |
| Declaration in FORM BFile: Form B_Promoter_Le Grande_compressed.pdf | 8 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LE GRANDE ROYALE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KHARE TOWN2,800+ in Nagpur
AADHAR NAGRI - II
S R INFRA
Metrocity-3
Metrocity Projects
KUKREJA WEST19
TAGSURE HOSPITALITY LLP
IMPERIAL GARDEN
Gaurav Agrawal
SHREERAM SKYLINE
CONCRETE DEVELOPERS
THE RHYTHM
RADHESANDESH REALTORS LLP
See every Nagpur project, with the district possession charts
Builder: VRINDAVAN CONSTRUCTIONS NAGPUR
VRINDAVAN CONSTRUCTIONS NAGPUR has 4 registrations on MahaRERA, including LE GRANDE ROYALE and ROYALE REGENCY-KALIDAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if LE GRANDE ROYALE is delayed beyond 15 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LE GRANDE ROYALE?
The registered promoter entity is VRINDAVAN CONSTRUCTIONS NAGPUR, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LE GRANDE ROYALE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for LE GRANDE ROYALE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LE GRANDE ROYALE?
The professionals named in the filing: Architect: ATHARVA GUPTA; Architect: AR ATHARVA GUPTA; Engineer: SACHIN MANOJ JAISWAL; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: UTSAV SUMIT & ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LE GRANDE ROYALE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback