Home / Browse projects / Nagpur, Maharashtra / PRIME PLATINUM
PRIME PLATINUM
RG-MH-03972 · RERA P50500033201 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRIME PLATINUM is a Plotted project by UMAKANT VITTHAL MENDHE in Nagpur, Maharashtra, registered with MahaRERA as P50500033201 on 9 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 53 of the 1,830 units on this registration are recorded sold or booked.
At a glance
Project
- NamePRIME PLATINUM
- TypePlotted
- Location
- WARDHA ROAD
- ZARI(RITHI)
- Zari
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500033201
- ReraGenie IDRG-MH-03972
Builder
- NameUMAKANT VITTHAL MENDHE
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 Feb 2022
- Promised completion31 Dec 2025
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed87 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BHOLARAM GOHAR |
| Engineer | BHOLARAM GOHAR |
| Engineer | SANKET LANDE |
| Chartered Accountant | amol shegaonkar |
| Chartered Accountant | CA ASHISH AGARWAL |
| Chartered Accountant | SUMIT CHANDWANI |
| Partner | Role in project |
|---|---|
| UMAKANT VITTHAL MENDHE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 May 2026
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Completion CertificateFile: mail for oc verification.pdf | 20 May 2026 |
| Completion CertificateFile: final oc.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1 Architect certificate Sept 2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Sept 2025.pdf | 30 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3 CA Certificate Sept 2025.pdf | 30 Dec 2025 |
| Form 5 (FY 2022-2023)File: FORM 5 FY 22-23 Gharkul.pdf | 14 Sep 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 FY 23-24 Gharkul.pdf | 14 Sep 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 24-25 Gharkul.pdf | 14 Sep 2025 |
| Form 5 (FY 2021-2022)File: FORM 5 FY 21-22 Gharkul.pdf | 10 Sep 2025 |
| Form 2A (FY 2021-2022)File: From 2A FY 2021-22.pdf | 8 Sep 2025 |
| Form 2A (FY 2022-2023)File: Form 2A FY 2022-23.pdf | 8 Sep 2025 |
| Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf | 8 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf | 8 Sep 2025 |
| Form 1File: Form 1 Architect Certificate June 2024.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate June 2024.pdf | 14 Aug 2025 |
| Form 3File: CA CERTIFICATE June 2024.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory June 2024.pdf | 14 Aug 2025 |
| Form 1File: Form 1 Architect Certificate Sep 2024.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate Sept 2024.pdf | 14 Aug 2025 |
| Form 3File: CA CERTIFICATE Sept 2024.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sep 2024.pdf | 14 Aug 2025 |
| Form 1File: Form 1 Architect Certificate Dec 2024.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate Dec 2024.pdf | 14 Aug 2025 |
| Form 3File: CA CERTIFICATE Dec 2024.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dec 2024.pdf | 14 Aug 2025 |
| Form 1File: Form 1 Architect Certificate March 2025.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate March 2025.pdf | 14 Aug 2025 |
| Form 3File: CA CERTIFICATE March 2025.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory March 2025.pdf | 14 Aug 2025 |
| Form 1File: Form 1 Architect Certificate June 2025.pdf | 14 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate June 2025.pdf | 14 Aug 2025 |
| Form 3File: CA CERTIFICATE June 2025.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory June 2025.pdf | 14 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Mar 2022 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE June 2022 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Sept 2022 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Dec 2022 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Mar 2023 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE June 2023 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Sept 2023 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Dec 2023 GHARKUL.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Mar 2024 GHARKUL.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate SEPT 23.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate DEC 23.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate MAR 24.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar 22.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate June 22.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Sept 22.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate dec 22.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Mar 23.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate June 23.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Sept 23.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Dec 23.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate mar 24.pdf | 3 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (MAR 22).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (JUNE 22).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (SEPT 22).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (DEC 22).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (MAR 23).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (JUNE 23).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (SEPT 23).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (DEC 23).pdf | 24 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (MAR 24).pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory MAR 22.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory JUNE 22.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory SEPT 22.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory DEC 22.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory MAR 23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory JUNE 23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory SEPT 23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory DEC 23.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or book Inventory MAR 24.pdf | 24 Jun 2024 |
| Layout approvalFile: map.pdf | 28 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: map.pdf | 28 Jan 2022 |
| Proforma of Allotment letterFile: ALLOTMENT AND AGREEMENT.pdf | 28 Jan 2022 |
| Building plan approval or NA orderFile: NA ORDER.pdf | 21 Jan 2022 |
| PAN CardFile: PAN CARD.pdf | 21 Jan 2022 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 21 Jan 2022 |
| Details of encumbrancesFile: NON ENCUMBERANCE CERETIFICATE.pdf | 21 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf | 21 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep PRIME PLATINUM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ZARI(RITHI)2,800+ in Nagpur
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
MAULI NAGAR 8
MAULI INFRATECH
MAHALAXMI NAGAR 41
MAHALAXMI INFRACON
See every Nagpur project, with the district possession charts
Builder: UMAKANT VITTHAL MENDHE
UMAKANT VITTHAL MENDHE has 1 registration on MahaRERA, including PRIME PLATINUM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if PRIME PLATINUM is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRIME PLATINUM?
The registered promoter entity is UMAKANT VITTHAL MENDHE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRIME PLATINUM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRIME PLATINUM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRIME PLATINUM?
The professionals named in the filing: Architect: BHOLARAM GOHAR; Engineer: BHOLARAM GOHAR; Engineer: SANKET LANDE; Chartered Accountant: amol shegaonkar; Chartered Accountant: CA ASHISH AGARWAL; Chartered Accountant: SUMIT CHANDWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRIME PLATINUM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback