ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / PRIME PLATINUM

Completed No litigation declared Plotted project

PRIME PLATINUM

By UMAKANT VITTHAL MENDHE

RG-MH-03972 · RERA P50500033201 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
1,777 of 1,830Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

PRIME PLATINUM is a Plotted project by UMAKANT VITTHAL MENDHE in Nagpur, Maharashtra, registered with MahaRERA as P50500033201 on 9 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 53 of the 1,830 units on this registration are recorded sold or booked.

At a glance

Project

  • NamePRIME PLATINUM
  • TypePlotted
  • Location
    • WARDHA ROAD
    • ZARI(RITHI)
    • Zari
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500033201
  • ReraGenie IDRG-MH-03972

Builder

  • NameUMAKANT VITTHAL MENDHE
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Feb 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed87 files

Current status

3%53 of 1,830 units booked

Figures as on 20 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,347 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Aug 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority (NMRDA)

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHALAXMI NAGAR MANEWADA ROAD

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHOLARAM GOHAR
EngineerBHOLARAM GOHAR
EngineerSANKET LANDE
Chartered Accountantamol shegaonkar
Chartered AccountantCA ASHISH AGARWAL
Chartered AccountantSUMIT CHANDWANI
PartnerRole in project
UMAKANT VITTHAL MENDHE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 May 2026

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: mail for oc verification.pdf20 May 2026
Completion CertificateFile: final oc.pdf20 May 2026
Withdrawal Update Form 1File: Form 1 Architect certificate Sept 2025.pdf30 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sept 2025.pdf30 Dec 2025
Withdrawal Update Form 3File: FORM 3 CA Certificate Sept 2025.pdf30 Dec 2025
Form 5 (FY 2022-2023)File: FORM 5 FY 22-23 Gharkul.pdf14 Sep 2025
Form 5 (FY 2023-2024)File: FORM 5 FY 23-24 Gharkul.pdf14 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 24-25 Gharkul.pdf14 Sep 2025
Form 5 (FY 2021-2022)File: FORM 5 FY 21-22 Gharkul.pdf10 Sep 2025
Form 2A (FY 2021-2022)File: From 2A FY 2021-22.pdf8 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A FY 2022-23.pdf8 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf8 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf8 Sep 2025
Form 1File: Form 1 Architect Certificate June 2024.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate June 2024.pdf14 Aug 2025
Form 3File: CA CERTIFICATE June 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory June 2024.pdf14 Aug 2025
Form 1File: Form 1 Architect Certificate Sep 2024.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Sept 2024.pdf14 Aug 2025
Form 3File: CA CERTIFICATE Sept 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sep 2024.pdf14 Aug 2025
Form 1File: Form 1 Architect Certificate Dec 2024.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Dec 2024.pdf14 Aug 2025
Form 3File: CA CERTIFICATE Dec 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dec 2024.pdf14 Aug 2025
Form 1File: Form 1 Architect Certificate March 2025.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate March 2025.pdf14 Aug 2025
Form 3File: CA CERTIFICATE March 2025.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory March 2025.pdf14 Aug 2025
Form 1File: Form 1 Architect Certificate June 2025.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate June 2025.pdf14 Aug 2025
Form 3File: CA CERTIFICATE June 2025.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory June 2025.pdf14 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Mar 2022 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE June 2022 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Sept 2022 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Dec 2022 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Mar 2023 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE June 2023 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Sept 2023 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Dec 2023 GHARKUL.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Mar 2024 GHARKUL.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate SEPT 23.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate DEC 23.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate MAR 24.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar 22.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate June 22.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Sept 22.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate dec 22.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Mar 23.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate June 23.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Sept 23.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate Dec 23.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Zari Engineer Certificate mar 24.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (MAR 22).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (JUNE 22).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (SEPT 22).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (DEC 22).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (MAR 23).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (JUNE 23).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (SEPT 23).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (DEC 23).pdf24 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (MAR 24).pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory MAR 22.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory JUNE 22.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory SEPT 22.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory DEC 22.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory MAR 23.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory JUNE 23.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory SEPT 23.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory DEC 23.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold or book Inventory MAR 24.pdf24 Jun 2024
Layout approvalFile: map.pdf28 Jan 2022
Copy of Layout Approval (in case of layout)File: map.pdf28 Jan 2022
Proforma of Allotment letterFile: ALLOTMENT AND AGREEMENT.pdf28 Jan 2022
Building plan approval or NA orderFile: NA ORDER.pdf21 Jan 2022
PAN CardFile: PAN CARD.pdf21 Jan 2022
Copy of the legal title reportFile: SEARCH REPORT.pdf21 Jan 2022
Details of encumbrancesFile: NON ENCUMBERANCE CERETIFICATE.pdf21 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf21 Jan 2022

How this compares with Nagpur

3%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRIME PLATINUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ZARI(RITHI)2,800+ in Nagpur

2 kmPRIME PLATINUMCompleted 8Lapsed / revoked 5Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: UMAKANT VITTHAL MENDHE

UMAKANT VITTHAL MENDHE has 1 registration on MahaRERA, including PRIME PLATINUM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if PRIME PLATINUM is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIME PLATINUM?

The registered promoter entity is UMAKANT VITTHAL MENDHE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIME PLATINUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRIME PLATINUM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIME PLATINUM?

The professionals named in the filing: Architect: BHOLARAM GOHAR; Engineer: BHOLARAM GOHAR; Engineer: SANKET LANDE; Chartered Accountant: amol shegaonkar; Chartered Accountant: CA ASHISH AGARWAL; Chartered Accountant: SUMIT CHANDWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIME PLATINUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIME PLATINUM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIME PLATINUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.