New projects and RERA data in Latur district, Maharashtra

150 of the projects in this build are in Latur district: 2,565 units across them, 13 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

150Projects in this build
13Registered, last 12 months
2,565Units declared
1,987Units not yet booked
15Completion dates revised
1With declared litigation

Of the 150 covered registrations, 15 have revised their promised completion date and 1 declare litigation. The median project here is 11% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

When Latur projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 150 projects with a promised date, 49 are recorded delivered, 51 are still on the register and 50 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

06121825today2018: 1 projects, delivered2018: 1 projects, registration lapsed or cancelled’182019: 10 projects, delivered2019: 1 projects, registration lapsed or cancelled’192020: 3 projects, delivered’202021: 5 projects, delivered2021: 2 projects, registration lapsed or cancelled’212022: 6 projects, delivered2022: 6 projects, registration lapsed or cancelled’222023: 7 projects, delivered2023: 13 projects, registration lapsed or cancelled’232024: 9 projects, delivered2024: 8 projects, registration lapsed or cancelled’242025: 4 projects, delivered2025: 14 projects, registration lapsed or cancelled’252026: 3 projects, delivered2026: 13 projects, on the register2026: 5 projects, registration lapsed or cancelled’262027: 1 projects, delivered2027: 16 projects, on the register’272028: 10 projects, on the register’282029: 7 projects, on the register’292030: 2 projects, on the register’302031: 2 projects, on the register’312032: 1 projects, on the register’32

60 projects promise possession in 2026 or later. Facts as per filings on RERA website.

02505007501,000today’182019: 137 flats, delivered (only 1 of 11 projects filed a flat count)’19’20’212022: 38 flats, delivered (only 2 of 12 projects filed a flat count)2022: 41 flats, registration lapsed or cancelled (only 2 of 12 projects filed a flat count)’222023: 29 flats, registration lapsed or cancelled (only 1 of 20 projects filed a flat count)’23’242025: 141 flats, registration lapsed or cancelled (only 5 of 18 projects filed a flat count)’252026: 36 flats, delivered2026: 216 flats, on the register2026: 261 flats, registration lapsed or cancelled’262027: 494 flats, on the register (only 7 of 17 projects filed a flat count)’272028: 609 flats, on the register’282029: 381 flats, on the register’292030: 94 flats, on the register’302031: 30 flats, on the register’312032: 58 flats, on the register’32

2,179 flats are promised in 2026 or later, across the 60% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Latur possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 14 of 149 projects (9%) have moved at least once; the median move is 12 months and the longest is 78 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

06121825Originally due 2018: 2 projects kept the original date, 100% of the year’18Originally due 2019: 11 projects kept the original date, 100% of the year’19Originally due 2020: 3 projects kept the original date, 75% of the yearOriginally due 2020: 1 projects moved by 2 years or more, 25% of the year’20Originally due 2021: 7 projects kept the original date, 78% of the yearOriginally due 2021: 1 projects moved by under 2 years, 11% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 11% of the year’21Originally due 2022: 11 projects kept the original date, 79% of the yearOriginally due 2022: 1 projects moved by under 2 years, 7% of the yearOriginally due 2022: 2 projects moved by 2 years or more, 14% of the year’22Originally due 2023: 18 projects kept the original date, 86% of the yearOriginally due 2023: 2 projects moved by under 2 years, 10% of the yearOriginally due 2023: 1 projects moved by 2 years or more, 5% of the year’23Originally due 2024: 14 projects kept the original date, 93% of the yearOriginally due 2024: 1 projects moved by 2 years or more, 7% of the year’24Originally due 2025: 17 projects kept the original date, 85% of the yearOriginally due 2025: 3 projects moved by under 2 years, 15% of the year’25Originally due 2026: 16 projects kept the original date, 100% of the year’26Originally due 2027: 16 projects kept the original date, 100% of the year’27Originally due 2028: 9 projects kept the original date, 90% of the yearOriginally due 2028: 1 projects moved by under 2 years, 10% of the year’28Originally due 2029: 6 projects kept the original date, 100% of the year’29Originally due 2030: 2 projects kept the original date, 100% of the year’30Originally due 2031: 2 projects kept the original date, 100% of the year’31Originally due 2032: 1 projects kept the original date, 100% of the year’32

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

0125250375500’18Originally due 2019: 137 flats kept the original date, 100% of the year (only 1 of 11 projects filed a flat count)’19’20’21Originally due 2022: 79 flats kept the original date, 79% of the year (only 3 of 14 projects filed a flat count)Originally due 2022: 257 flats moved by 2 years or more, 14% of the year (only 3 of 14 projects filed a flat count)’22Originally due 2023: 29 flats kept the original date, 86% of the year (only 2 of 21 projects filed a flat count)Originally due 2023: 20 flats moved by 2 years or more, 5% of the year (only 2 of 21 projects filed a flat count)’23’24Originally due 2025: 141 flats kept the original date, 85% of the year (only 8 of 20 projects filed a flat count)Originally due 2025: 58 flats moved by under 2 years, 15% of the year (only 8 of 20 projects filed a flat count)’25Originally due 2026: 412 flats kept the original date, 100% of the year’26Originally due 2027: 494 flats kept the original date, 100% of the year (only 7 of 16 projects filed a flat count)’27Originally due 2028: 352 flats kept the original date, 90% of the yearOriginally due 2028: 90 flats moved by under 2 years, 10% of the year’28Originally due 2029: 291 flats kept the original date, 100% of the year’29Originally due 2030: 94 flats kept the original date, 100% of the year’30Originally due 2031: 30 flats kept the original date, 100% of the year’31Originally due 2032: 58 flats kept the original date, 100% of the year’32

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Projects in Latur

ProjectDeveloperUnits BookedRegistered
VENKATESHWARA GREENSLAHOTI PROPERTIES25759%25 Jul 2017
MS ROYAL CITYMS PROPERTY DEVELOPERS PRIVATE LIMITED2240%27 Mar 2025
SHRI GAJANAN RESIDENCYSIDDESHWAR INFRASTRUCTURE20069%8 Dec 2020
Venkatesh ApartmentMJP Builders & Developers1920%9 Jul 2024
SHIIV DHAMSHIIV MASTERBUILD LLP1560%23 Feb 2026
TIRUMALA MAHAVEER ESTATESTIRUMALA INFRASTRUCTURE AND PROJECTS1370%28 Feb 2020
MADNE ICONIA VISHWAVISHNU NARSINGRAO MADNE9636%3 Jul 2023
Madhuram SolitaireDB CONSTRUCTIONS LLP9017%21 Mar 2025
Park ApartmentsNITINKUMAR VIJAYKUMAR NAWANDER7778%9 Feb 2022
Rushabh PlatinumRUSHABH INFRA7011%10 Jan 2025
Twin TowerMantri Construction700%20 Mar 2025
LAXMI HEIGHTSWADA INFRA LLP640%18 Mar 2026
ICON BHASKARICON CREATIVEAND MAHESH DEVELOPERS LLP5857%2 Dec 2022
84 ELITEJAGDISH DATTATRAY KULKARNI580%16 Oct 2025
Swastik OneSwastik Horizon LLP560%9 Jul 2026
MADNE ICONIA SILVER OAKVISHNU NARSINGRAO MADNE5614%11 Feb 2026
UTSAAHVIRENDRA VIJAYSING CHAUHAN410%9 Dec 2019
Siddheshwar NagariKiran Laxminarayan Mantri380%12 Feb 2019
KAUSHALYA PRIMEKAUSHALYA ASSOCIATES3716%27 Mar 2025
UNIVERSAL BUILDINGUNIVERSAL BUILDERS AND DEVELOPERS3681%5 Oct 2023
SHREE HEIGHTSJAYKANT RAM GITTE360%25 Jan 2024
Omkar HeightsPravin Madhukar Bhute360%3 Nov 2025
HAPPY HERITAGEBhagwat Kamlakar Barure350%1 Oct 2025
SHREE GANESHSHREE PRABHA CONTRACTORS LLP3418%18 Jun 2024
AKSHATA GOLDEN VIEWSUSHIL VASANTRAO BELAMBE3234%8 Jun 2023
RUDRAKSH DHAMSHRIKANT CHANDRASHEKHAR HIREMATH300%14 Jul 2026
ABDUL KADARSAB SHAIKHABDUL KADARSAB SHAIKH290%1 Nov 2019
AJINKYA PRIME CITYAJINKYA BUILDERS AND DEVELOPERS2938%29 Apr 2024
Shri Gajanan HeightsDhananjay Suryakant Varale2429%1 Aug 2025
Shri Khatushyam ResidencyDhananjay Suryakant Varale2412%26 Aug 2025
Snehbandh ApartmentAmol Ashok Arya240%1 Oct 2025
INDURATNA HEIGHTSWADA REALITY240%13 Jul 2026
Test Crystal Tower MixedAmbika Realty239%1 May 2025
SAI GAJANANDATTATRAY JANARDHAN MORE2045%22 Feb 2022
Raj KunjDhananjay Suryakant Varale2055%20 Sep 2023
RAJSHRI MADUKAR PAWAR AND CHHAYA MAHADEV PAWARHANSRAJ DATTOBA JADHAV2045%16 Aug 2024
NAMDEV RESIDANCYDNYANESHWAR VYANKATRAO MITHAPALLE2045%28 Mar 2025
P S PATIL RESIDENTIAL BUILDINGMukesh Nilkhantrao Jadhav200%23 Jun 2025
SHREE PHASE 2JAYKANT RAM GITTE1947%25 Jan 2024
SEETA DHAMRamchandra Builders and Developers1414%14 Nov 2024
SHREE PHASE 1Chate and Gitte Developers130%25 Jan 2024
RAMKRUSHNA PARKRokadeshwar Builders & Developers922%13 Jul 2023
YASHPRABHA RESIDENCY1 ResidentialRENA PROJECTS PRIVATE LIMITED933%17 Oct 2023
KASALE RECIDENCYGOVIND MAROTI RATHOD70%13 Jan 2025
Saroj ResidencyFarmfluence LLP10%25 Mar 2022
Dwarka NagariDwarka Nagari--10 Jul 2017
RADHAKRISHNA ENCLAVEMAHADEV RAMRAO THORMOTE--1 Sep 2017
BRC COMPLEXBRC BUILDRES AND DEVELOPERS--18 Aug 2017
Goolden WoodsKirti Construction--24 Aug 2017
SHRI RESIDENCYS V DEVELOPERS--22 Aug 2017
DHANRAJ PARKDANRAJ VENKATRAO BARURE--7 Sep 2017
UJWAL DHAMNIWARA GRUHNIRMAN PVT LTD--15 Feb 2018
Kaleshwara HeightsKirti Construction--27 Nov 2017
VRINDAVAN APARTMENTUDAY NIVRUTTIRAO PATIL--2 Nov 2017
SHRI RADHIKA VIHARUDAY NIVARATTIRAO PATIL--15 Jan 2018
KESHAV KUNJUDAY NIVARATTIRAO PATIL--2 Jan 2018
ATHARV-VARAD APARTMENTM/S SHREE GAJANANSUPERCON--7 Feb 2018
LOTUS ENCLEVEM SQUARE STRUCTURES PVT LTD--12 Feb 2019
KESHAV APARTMENTGULAB SUREKHA PAWAR--12 Apr 2018
Park StreetNawcon Infrastructure Pvt Ltd--25 Apr 2018
SAI PRATIKAMOL VINAYAKRAO MULE--23 Aug 2018
GAJANAN RESIDENCYPANKAJ MARUTIRAO GHORPADE--22 Oct 2018
SHRI RADHIKA VIHARM/S SHREE GAJANANSUPERCON--28 Dec 2018
736 EWS TS AND 256 MIG TS AT PLOT NO R-1 ADDITIONAL MIDC LATURAURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)--23 Aug 2018
SAI CITYM/S SAMARTH CONSTRUCTION--4 Jan 2019
INDRAYANI ROWHOUSESVENKURAM KESHAVRAO PATIL--28 Dec 2018
SAI YASH APARTMENTMukesh Nilkhantrao Jadhav--14 Jan 2019
PRISHA RESIDENCYDIWAN BHOSALE CONSTRUCTIONS--1 Feb 2019
bansiraj residencyKRUSHNKUMAR BRIJMOHANJI SOMANI--15 Mar 2019
VENKATESHA RESIDENCYVELX INFRA--13 Mar 2019
SHIVALAY PARKASHWINI SHIVYOGI SWAMI--18 Apr 2019
Park StreetN B DONGARE PROPERTIES--10 May 2019
YASHODAN APARTMENTSUREKHA SANJAY MAMADAPURE--10 May 2019
BALKISHAN TOWERICON CREATIVE DEVELOPERS PRIVATE LIMITED--29 Jul 2019
UJJWAL DHAM PHASE 2NIWARA GRUHNIRMAN PVT LTD--14 Jun 2019
GANGASAGAR RESIDANCYRENA PROJECTS PRIVATE LIMITED--5 Sep 2019
SAI MADHUSINDHU APARTMENTMukesh Nilkhantrao Jadhav--8 Aug 2019
SAI VIRNDAVANCHANDRAKANT GURUNATH BIRAJDAR--30 Oct 2019
SAI DIGAMBAR APARTMENTNIWARA GRUHNIRMAN PVT LTD--30 Oct 2019
MADNE ICONIAVISHNU NARSINGHRAO MADNE--5 Dec 2019
VISHWARAJ EMPIRE IIIKUBER DEVELOPERS--18 Mar 2020
Dattakrupa ResidencyPankaj Marutirao Ghorpade--10 Apr 2020
ISHAN SQUAREADHIRAJBUILDERS--18 Mar 2020
SHRIKUNJDATTATRAY MARUTIRAO PARSHURAM--9 Jul 2020
DWARKA PURINorth West Infra--25 Aug 2020
AKSHARDHAMGAURI BULDERS AND DEVELOPERS--21 Jan 2021
Kusum VillasSubhash Estate--10 Jan 2021
SHIV KUNJUDAY NIVRUTTIRAO PATIL--10 Nov 2020
CHAITANYA APARTMENT - IIASHOKBHAI MANJIBHAI RATHOD--4 Dec 2020
LAXMI ESTATE PHASE - IVENKATADRI PROMOTERS--2 Dec 2020
GokulamJagdhish Vishnudas Dhoot--18 May 2021
SHIV SHANKAR RESIDENCYRAHUL INFRASTRUCTURES--18 Feb 2021
SHRI RAM APARTMENTGULAB SUREKHA PAWAR--10 Feb 2021
MADHUBANDB CONSTRUCTIONS LLP--18 Feb 2021
PUROHITSKPS INFRA--23 Mar 2021
SAI GULAB COMLPEXMukesh Nilkhantrao Jadhav--19 Mar 2021
ISHAN SQUAREADHIRAJBUILDERSANDDEV--25 Mar 2021
SAI CLASSIC APARTMENTAMOL VINAYAKRAO MULE--25 Aug 2021
SIDDHIVINAYAK APPARTMENTVINAYAK NIVRATTIRAO JATAL--5 Aug 2021
DURWANKUR RESIDENCYBARURE B K AND DEVBELOPERS--4 Jan 2022
SAI MATHURA APARTMENTMukesh Nilkhantrao Jadhav--22 Nov 2021
AMRUTSHILP APARTMENTM/S BALAJI CONTROCTOR AND DEVELOPERS--31 Oct 2021
PRAYAG DHAMSWATI PRAVIN GHORPADE--3 Nov 2021
SHRIKRISHNA VIHARADHARSHILA UDAY PATIL--9 Feb 2022
SHRIKRISHNA VIHARADHARSHILA UDAY PATIL--2 Feb 2022
RAHI RESIDENCYSAMRUDDHI ASSOCIATES--10 Jan 2022
Arjun ViharRamchandra Builders and Developers--11 Jan 2022
RUDRA APARTMENTKASTURI ASSOCIATE--2 Mar 2022
VIGNAHARTA APPARTMENTVINAYAK NIVRATTIRAO JATAL--24 Jan 2022
SHIVALAY HEIGHTSADITYA BUILDCON--11 Apr 2022
SHREE APARTMENTVAIBHAVI BUILDERS AND DEVELOPERS--11 Apr 2022
Laxmi ApartmentNew Laxmi Builders And Developers--11 Apr 2022
VINAYAK APPARTMENTVINAYAK NIVRATTIRAO JATAL--10 May 2022
IndraprasthDIVYA CONSTRUCTION--10 May 2022
Lakshdeep ResidencyShree Siddhivinayak Developers--29 Apr 2022
MALANG GREEN CITY PHASE3Madhuri Mahesh Dhanashri--10 May 2022
PADMA TOWERPADMA BUILDERS AND DEVELOPERS--20 Jun 2022
SAI VEDANT HEIGHTSBARURE B. K. AND DEVELOPERS--20 Jun 2022
MALANG GREEN CITY PHASE 2SACHIN SIDRAMAPPA CHUNDE--15 Jun 2022
Yashodeep ApartmentShree Siddhivinayak Developers--1 Dec 2022
JYOTI KIRAN APARTMENTSKiran Laxminarayan Mantri--24 Jan 2023
SAI NARAYAN HEIGHTSJ P CONSTRUCTION--24 Jan 2023
SAI SUMAN VIHARMukesh Nilkhantrao Jadhav--27 Mar 2023
TULSIBAAGSUSHMA SHAILESH KULKARNI--10 Nov 2023
Golden Woods Phase 2Santosh Kumar Hatte--27 Jun 2023
B2B ELITESAKSHI SURESH BAMANKAR--27 Oct 2023
S. K. Buildcon ResidencyS K Buildcon--27 Jun 2023
RAMKRUSHNA PARKRokadeshwar Builders & Developers--22 Sep 2023
SHREEJA RESIDENCYVASTU SHREEJA BUILDCON LLP--22 Sep 2023
AAI RESIDENCYVAIBHAVI BUILDERS AND DEVELOPERS LLP--22 Sep 2023
Prabha AnnexMANKARI CONSTRUCTION PVT LTD--17 Oct 2023
RAJ HEIGHTSASHISH RAJENDRA KOLGE--26 Feb 2024
PASAYDAN HeightsPASAYDAN Heights LLP--3 Jan 2024
MAHALAKSHMI APARTMENTMAHALAXMI BUILDCON--16 Apr 2024
RAMKRUSHNA PARK RESIDENTAILSURAJ MAHADEV JATAL--10 May 2024
KALE ROW HOUSE PHASE 3M/S SHRISAI CONSTRUCTION--9 Jul 2024
Ample ApartmentYASHODHAN BUILDER & DEVELOPERS--18 Jun 2024
SWASTIK HEIGHTSSHUBH ESTATE--9 Jul 2024
ANANDAM RESIDENCYLANJILE ESTATE--18 Jun 2024
SOLSWATI S HAJGUDE--29 Jul 2024
24 MAJESTY RESIDENCYAMOL DEVDATTA TAMBALE--12 Dec 2024
RAMKRUSHNAHARI PARK PHASE 2 ResidentialSURAJ MAHADEV JATAL--30 Oct 2024
DWARKA VIHARNorth West Infra--27 Dec 2024
Vardhan EstateVardhan Infra Proprietor Sagar Garad--5 Feb 2025
ATHARV RESIDENCYAtharv Buildcon--28 Feb 2025
Samarth HeightsADHIRAJ REALTORS--10 Mar 2025
PLATINUM SQUAREADHIRAJ REALTORS--12 Mar 2025
SITA VIHAR -1North West Infra--20 Mar 2025
FOUR SEASONSNITINKUMAR VIJAYKUMAR NAWANDER--16 Jun 2025
Trishoolin HeightsUDAY NIVRUTTIRAO PATIL--25 Sep 2025
Planning a launch in Latur? The area consolidated report packs launches, inventory movement, unit sizes and absorption across the projects you pick into one document. Rs 2,999 for the first project and Rs 1,999 for each additional one. Area report · Rs 2,999 · coming soon  See what is coming

Developers active in Latur

Mukesh Nilkhantrao Jadhav (6), Dhananjay Suryakant Varale (3), NIWARA GRUHNIRMAN PVT LTD (3), UDAY NIVRUTTIRAO PATIL (3), North West Infra (3), VINAYAK NIVRATTIRAO JATAL (3). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Latur projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 11% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Latur project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Latur district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Latur registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Latur project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.