Home / Browse projects / Latur, Maharashtra / 84 ELITE

Registered No litigation declared Residential / Group Housing project

84 ELITE

By JAGDISH DATTATRAY KULKARNI

RG-MH-87980 · RERA PR1160002501255 · Last updated on MahaRERA portal: 5 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Dec 2032Possession promisedno revision filed
23 of 64Construction stages doneacross 7 buildings; furthest along: Slabs of Super Structure, 75%
58 of 58Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 14 documents Report an error

84 ELITE is a Residential / Group Housing project by JAGDISH DATTATRAY KULKARNI in Latur, Maharashtra, registered with MahaRERA as PR1160002501255 on 16 Oct 2025. Possession is promised by 31 Dec 2032. 0 of the 58 units on this registration are recorded sold or booked, and 23 of 64 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • Name84 ELITE
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 01 AND 02 SY NO 22 A AND GAT NO 44
    • MOUJE BASWANTPUR
    • Latur (M Cl)
    • Latur
    • 413512
  • Pincode413512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1160002501255
  • ReraGenie IDRG-MH-87980

Builder

  • NameJAGDISH DATTATRAY KULKARNI
  • Entity typeProprietor

Key dates

this monthRegisteredOct 2025PromisedDec 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2025
  • Promised completion31 Dec 2032
  • Revised completionNone
  • Buildings7 building records
  • Documents filed14 files

Current status

0%0 of 58 units booked
21.8%Work done, per cost certificate

Figures as on 5 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TWIN BUNGLOW B1 TO B3NA33303
TWIN BUNGLOW B4 TO B7NA33404
ROW HOUSE 1 TO 3NA22303
ROW HOUSE 04 TO 07NA22404
TWIN BUNGLOW B8 TO B12NA33505
ROW HOUSE R8 TO R12NA22505
APARTMENTNA9734034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 5 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 64 construction stages are filed complete across 7 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

TWIN BUNGLOW B1 TO B353%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
TWIN BUNGLOW B4 TO B773%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
ROW HOUSE 1 TO 30%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 04 TO 0763%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
TWIN BUNGLOW B8 TO B1276%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
ROW HOUSE R8 TO R1242%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
APARTMENT0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo30%
Water SupplyNo35%
Sewerage (Chamber, Lines, Septic Tank , STP)No20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo15%
Street LightingNo15%
Community BuildingsNo5%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo25%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo10%
Aggregate area of recreational Open SpaceNo20%
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Stilt / Ground112

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,142 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
VIJAYKUMAR TRIMBAKRAO MALWADKARLatur (M Cl)Latur

Approvals and building plan

Sanctioning authorityLATUR MUNICIPAL CORPORATION, LATUR
Permissible FSI23504.14
Proposed, not sanctioned8,586 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREYAS KHARDEKAR BUILDING, AUSA ROAD,LATUR, LATURPIN - 413531
Estimated costRs 12.54 cr
Cost incurredRs 2.74 cr
Work done21.81%
BuildingWingEstimatedIncurred
APARTMENTNARs 6.78 cr-
TWIN BUNGLOW B8 TO B12NARs 99.69 lakhRs 59.81 lakh
ROW HOUSE R8 TO R12NARs 99.69 lakhRs 60.81 lakh
-NARs 97.78 lakhRs 41.07 lakh
TWIN BUNGLOW B4 TO B7NARs 79.75 lakhRs 42.27 lakh
ROW HOUSE 04 TO 07NARs 79.75 lakhRs 36.69 lakh
TWIN BUNGLOW B1 TO B3NARs 59.81 lakhRs 32.90 lakh
ROW HOUSE 1 TO 3NARs 59.81 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN KISHANRAO HISWANKAR
ArchitectNIEV STUDIO
EngineerMATRIX STRUCTURAL CONSULTANTS
EngineerER SUMIT S KHENDAD
Chartered AccountantASHOK DHOOT
PartnerRole in project
J K ASSOCIATES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600517Mrinal KatkarJ K ASSOCIATES22/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2032

Documents filed14

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 JUN 26.pdf5 Sep 2026
Withdrawal Update Form 2File: FORM-2 JUN 26.pdf5 Sep 2026
Withdrawal Update Form 3File: FORM-3 JUN 26.pdf5 Sep 2026
Withdrawal Update Form 1File: FORM-1 DEC 25.pdf4 Sep 2026
Withdrawal Update Form 1File: FORM-1 MAR 26.pdf4 Sep 2026
Withdrawal Update Form 2File: FORM-2 DEC 25.pdf4 Sep 2026
Withdrawal Update Form 2File: FORM-2 MAR 26.pdf4 Sep 2026
Withdrawal Update Form 3File: FORM-3 DEC 25.pdf4 Sep 2026
Withdrawal Update Form 3File: FORM-3 MAR 26.pdf4 Sep 2026
Form 2A (FY 2025-2026)File: FORM-2A (2025-26).pdf4 Sep 2026
Declaration and undertaking (Annexure A)File: Annexure A.pdf26 Jul 2025
Building plan approval or NA orderFile: COLLECTOR NA.pdf26 Jul 2025
Layout approvalFile: DWG - LAYOUT.PDF15 Jul 2025
Building plan approvalFile: DWG - LAYOUT 2.pdf15 Jul 2025

How this compares with Latur

0%of this project is bookeddistrict median 0%
10%of Latur projects moved their completion datethis one has not
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep 84 ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUJE BASWANTPUR150+ in Latur

2 km84 ELITECompleted 4Lapsed / revoked 4Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 11 registered projects within 2 km.

Builder: JAGDISH DATTATRAY KULKARNI

JAGDISH DATTATRAY KULKARNI has 1 registration on MahaRERA, including 84 ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if 84 ELITE is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 84 ELITE?

The registered promoter entity is JAGDISH DATTATRAY KULKARNI, a proprietor as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 84 ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 84 ELITE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 84 ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 84 ELITE?

The professionals named in the filing: Architect: SACHIN KISHANRAO HISWANKAR; Architect: NIEV STUDIO; Engineer: MATRIX STRUCTURAL CONSULTANTS; Engineer: ER SUMIT S KHENDAD; Chartered Accountant: ASHOK DHOOT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 84 ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 84 ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 84 ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.