DWARKA VIHAR
RG-MH-23248 · RERA P52400078556 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 4 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DWARKA VIHAR is a Residential / Group Housing project by North West Infra in Latur, Maharashtra, registered with MahaRERA as P52400078556 on 27 Dec 2024. Possession is promised by 31 Dec 2028. 0 of the 156 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.
At a glance
Project
- NameDWARKA VIHAR
- TypeResidential / Group Housing
- Location
- KATPUR ROAD
- NEAR GUJRATI ENGLISH SCHOOL
- Sikandarpur
- Latur
- 413512
- Pincode413512
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52400078556
- ReraGenie IDRG-MH-23248
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Dec 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed69 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 9 | 8 | 56 | 12 | 68 |
| BUILDING B | NA | 9 | 8 | 84 | 4 | 88 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 50%.
BUILDING A37%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 12% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B18%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed119
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 59 | 59 |
| BUILDING B | 60 | 60 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mahesh Nayankumar Nawander |
| Architect | Richa Navandar |
| Engineer | Vijaykumar Ghodke |
| Chartered Accountant | Kishor Bharadiya |
| Chartered Accountant | Ramniwas Karwa |
| Chartered Accountant | Purshottam Ramnivas Karwa |
| Partner | Role in project |
|---|---|
| North West Infra | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: DV-Form-1 FY26-27 QTR-1.pdf | 31 Jul 2026 |
| Form 2File: DV-Form-2 FY26-27-QTR-1.pdf | 31 Jul 2026 |
| Form 3File: DV-Form-3 FY26-27 QTR-1.pdf | 31 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory (DV).pdf | 31 Jul 2026 |
| Form 2A (FY 2025-2026)File: DV-Form-2A FY-25-26.pdf | 22 May 2026 |
| Form 1File: Form-1 DV-QTR-3 24-25.pdf | 13 May 2026 |
| Form 2File: Form-2 DV- QTR-3 24-25.pdf | 13 May 2026 |
| Form 3File: 2 Annexure - DV 24-25 Form 3 Q3.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventory Dwarka Vihar QTR-3.pdf | 13 May 2026 |
| Form 1File: DV-FORM-1 FY-25-26 QTR-3.pdf | 20 Apr 2026 |
| Form 2File: DV-FORM-2 FY-25-26 QTR-3.pdf | 20 Apr 2026 |
| Form 3File: DV-Form-3 FY-25-26 QTR-3.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DV-SOLD AND UNSOLD BOOKED DISCLOSURE FY-25-26 QTR-3.pdf | 20 Apr 2026 |
| Form 1File: DV-FORM-1 FY-25-26 QTR-4.pdf | 20 Apr 2026 |
| Form 2File: DV-FORM-2 FY-25-26 QTR-4.pdf | 20 Apr 2026 |
| Form 3File: DV-Form-3 FY-25-26 QTR-4.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DV-SOLD AND UNSOLD BOOKED DISCLOSURE FY-25-26 QTR-4.pdf | 20 Apr 2026 |
| Form 1File: Form 1 Dwarka Vihar FY-2025-26 QTR-1.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Dwarka Vihar FY-2025-26 QTR-1.pdf | 15 Dec 2025 |
| Form 3File: From 3 Dwarka Vihar FY-2025-26 QTR-1.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dwarka Vihar FY-2025-26 QTR-1.pdf | 15 Dec 2025 |
| Form 1File: Form 1 Dwarka Vihar FY-2025-26 QTR-2.pdf | 15 Dec 2025 |
| Form 2File: Form 2 Dwarka Vihar FY-2025-26 QTR-2.pdf | 15 Dec 2025 |
| Form 3File: From 3 Dwarka Vihar FY-2025-26 QTR-2.pdf | 15 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Dwarka Vihar FY-2025-26 QTR-2.pdf | 15 Dec 2025 |
| Form 5 (FY 2024-2025)File: P52400078556.pdf | 29 Sep 2025 |
| Form 1File: form 1 dwarka vihar 12-04-25.pdf | 24 Sep 2025 |
| Form 2File: form 2 dwarka vihar 12-04-25.pdf | 24 Sep 2025 |
| Form 3File: form 3 dwarka vihar 12-04-25.pdf | 24 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory 12-04-2025.pdf | 24 Sep 2025 |
| Form 2A (FY 2024-2025)File: form 2a 24-25 dwarka vihar.pdf | 30 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dwarka vihar 12-04-25.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 dwarka vihar 12-04-25.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dwarka vihar 12-04-25.pdf | 15 Apr 2025 |
| Proforma of Agreement for saleFile: agreement to sell AS Per RERA 29-03-2025.pdf | 31 Mar 2025 |
| Proforma of Agreement for saleFile: agreement to sell.pdf | 18 Dec 2024 |
| Building plan approvalFile: APPROVAL DWG 17-12-2024.pdf | 17 Dec 2024 |
| Layout approvalFile: APPROVAL DWG 17-12-2024.pdf | 17 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: APPROVAL DWG 17-12-2024.pdf | 17 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVAL DWG 17-12-2024.pdf | 17 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 dwarka vihar.pdf | 10 Dec 2024 |
| Other - LegalFile: सिकंदरपूर_87_1_Satbara (1).pdf | 5 Dec 2024 |
| Copy of the legal title reportFile: legal title report dwarka vihar.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: details of encumbrance concerned to finance.pdf | 4 Dec 2024 |
| Proforma of Allotment letterFile: allotment letter dwarka vihar.pdf | 4 Dec 2024 |
| Declaration in FORM BFile: Form B.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 dwarka vihar (1).pdf | 4 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dwarka vihar.pdf | 4 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Dwarka Vihar Building Permission letter.pdf | 4 Dec 2024 |
| Other - LegalFile: 1 other legal, 2 other finace concern letter.pdf | 4 Dec 2024 |
| Other - LegalFile: SALE DEED LTR2-3907-2024.pdf | 4 Dec 2024 |
| Other - LegalFile: सिकंदरपुर 87-1 Index II SALE DEED.pdf | 4 Dec 2024 |
| Declaration about Commencement CertificateFile: format D declaration about commencement certificate dwarka vihar.pdf | 4 Dec 2024 |
| CERSAI detailsFile: CERSAI Details.pdf | 4 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: formate A bank account.pdf | 4 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: deviation report with respect to allotment letter.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to LegalFile: details of encumbrance concerned to finance.pdf | 4 Dec 2024 |
| Other - FinanceFile: partnership deed.pdf | 4 Dec 2024 |
| Other - FinanceFile: 1 other legal, 2 other finace concern letter.pdf | 4 Dec 2024 |
| Other - FinanceFile: सिकंदरपुर 87-1 Index II SALE DEED.pdf | 4 Dec 2024 |
| Other - TechnicalFile: 1 other techanical annexure A declaration.pdf | 4 Dec 2024 |
| Other - TechnicalFile: partnership deed.pdf | 4 Dec 2024 |
| Other - TechnicalFile: सिकंदरपुर 87-1 Index II SALE DEED.pdf | 4 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: deviation report with respect to agreement.pdf | 4 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: interest in other real estate nitin sir.pdf | 4 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: interest in other real estate mahesh sir.pdf | 4 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: formate B bank confirm letter.pdf | 4 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: disclosure of secured unsecured finace dwarka vihar.pdf | 4 Dec 2024 |
| PAN CardFile: North west infra Pan Card.pdf | 3 Dec 2024 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SITA VIHAR -1P52400079706 | IN FRONT OF PODAR INTERNATION SCHOOL, Latur | 256 | Mar 2025 | Certificate Signed | Dec 2029 | Not due yet |
| NAWANDER LANDMARK 2P52500078880 | Tuljabhawani Engineering Collage, Osmanabad | - | Jan 2025 | Ongoing | Dec 2029 | Not due yet |
| Park ApartmentsP52400033239 | Opp. Mount Litera Zee School, Latur | 77 | Feb 2022 | Completed | Dec 2025 | Nov 2025 |
| DWARKA PURIP52400026170 | Beside Deshmukh Water Plant, Latur | - | Aug 2020 | Completed | Jun 2025 | Nov 2024 |
| Park StreetP52400016239 | Opp. Mount Litera Zee School, Latur | - | Apr 2018 | Completed | Dec 2024 | Aug 2024 |
| Dwarka NagariP52400000234 | Beside Old MIDC, Latur | - | Jul 2017 | Completed | Dec 2023 | Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Latur
Computed across the 150+ Latur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DWARKA VIHAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR GUJRATI ENGLISH SCHOOL150+ in Latur
Filed coordinates, straight-line distance. 7 registered projects within 2 km.
MS ROYAL CITY
MS PROPERTY DEVELOPERS PRIVATE LIMITED
SHRI GAJANAN RESIDENCY
SIDDESHWAR INFRASTRUCTURE
SHIIV DHAM
SHIIV MASTERBUILD LLP
MADNE ICONIA VISHWA
VISHNU NARSINGRAO MADNE
Madhuram Solitaire
DB CONSTRUCTIONS LLP
Park Apartments
NITINKUMAR VIJAYKUMAR NAWANDER
See every Latur project, with the district possession charts
Builder: North West Infra
North West Infra has 6 registrations on MahaRERA, including Anutham and VIJAY GEET. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Latur district page.
Frequently asked questions
What are my rights if DWARKA VIHAR is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DWARKA VIHAR?
The registered promoter entity is North West Infra, a partnership as per the filing. Its GSTIN 27AAPFN3002J1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DWARKA VIHAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DWARKA VIHAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DWARKA VIHAR?
The professionals named in the filing: Architect: Mahesh Nayankumar Nawander; Architect: Richa Navandar; Engineer: Vijaykumar Ghodke; Chartered Accountant: Kishor Bharadiya; Chartered Accountant: Ramniwas Karwa; Chartered Accountant: Purshottam Ramnivas Karwa. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DWARKA VIHAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback