Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 10 months from the original
231 of 319Construction stages doneacross 29 buildings; furthest along: Installation of Lifts, 95%
18 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

AJINKYA PRIME CITY is a Residential / Group Housing project by AJINKYA BUILDERS AND DEVELOPERS in Latur, Maharashtra, registered with MahaRERA as P52400055871 on 29 Apr 2024. Possession is promised by 31 Oct 2026. The completion date has moved by 10 months from the original filing. 11 of the 29 units on this registration are recorded sold or booked, and 231 of 319 construction stages are filed complete.

At a glance

Project

  • NameAJINKYA PRIME CITY
  • TypeResidential / Group Housing
  • Location
    • AGGROYA NAGAR
    • Latur (rural)
    • Latur
    • 413531
  • Pincode413531
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400055871
  • ReraGenie IDRG-MH-29989

Builder

  • NameAJINKYA BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersAjaysingh Bhagwansingh Rajput, Vikram Madhukar Saudagar

Key dates

this monthRegisteredApr 2024First promiseDec 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Dec 2025)
  • Buildings29 building records
  • Documents filed57 files

Current status

38%11 of 29 units booked
107.4%Work done, per cost certificate

Figures as on 26 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AJINKYA PRIME CITY - RH 29NA22101
AJINKYA PRIME CITY - RH 3NA22101
AJINKYA PRIME CITY - RH 21NA22101
AJINKYA PRIME CITY - RH 1NA22101
AJINKYA PRIME CITY - RH 2NA22101
AJINKYA PRIME CITY - RH 4NA22101
AJINKYA PRIME CITY - RH 5NA22101
AJINKYA PRIME CITY - RH 6NA22101
AJINKYA PRIME CITY - RH 7NA22101
AJINKYA PRIME CITY - RH 8NA22101
AJINKYA PRIME CITY - RH 9NA22101
AJINKYA PRIME CITY- RH 10NA22101
AJINKYA PRIME CITY- RH 11NA22101
AJINKYA PRIME CITY- RH 12NA22101
AJINKYA PRIME CITY - RH 13NA22101
AJINKYA PRIME CITY - RH 14NA22101
AJINKYA PRIME CITY - RH 15NA22101
AJINKYA PRIME CITY - RH 16NA22101
AJINKYA PRIME CITY - RH 17NA22101
AJINKYA PRIME CITY - RH 18NA22101
AJINKYA PRIME CITY - RH 19NA22101
AJINKYA PRIME CITY - RH 20NA22101
AJINKYA PRIME CITY - RH 22NA22101
AJINKYA PRIME CITY - RH 23NA22101
AJINKYA PRIME CITY - RH 24NA22101
AJINKYA PRIME CITY - RH 25NA22101
AJINKYA PRIME CITY - RH 26NA22101
AJINKYA PRIME CITY - RH 27NA22101
AJINKYA PRIME CITY 0 RH 28NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 26 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 29 buildings; the table lists the first 20.

231 of 319 construction stages are filed complete across 29 buildings. The stage furthest along is Installation of Lifts, at 95%.

AJINKYA PRIME CITY - RH 2981%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 381%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 2181%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 181%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 281%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 481%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 572%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 681%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 781%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 881%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 981%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY- RH 1081%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY- RH 1181%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY- RH 1281%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 1381%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 1481%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 1581%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 1681%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 1781%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
AJINKYA PRIME CITY - RH 1881%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 26 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,044 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Aug 2025
LandownerVillageDistrict
BHARAT BALKISHAN AGGROYALatur (M Cl)Latur

Approvals and building plan

Sanctioning authorityLatur Municipal Corporation
Permissible FSI3122.31
Proposed, not sanctioned3,122 sq m
Buildings approved29
Buildings sanctioned29

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAUSA ROAD
Estimated costRs 7.53 cr
Cost incurredRs 8.09 cr
Work done107.44%
BuildingWingEstimatedIncurred
AJINKYA PRIME CITY - RH 29NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 3NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 21NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 1NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 2NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 4NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 5NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 6NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 7NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 8NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY - RH 9NARs 25.11 lakhRs 26.98 lakh
AJINKYA PRIME CITY- RH 10NARs 25.11 lakhRs 26.98 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectrajput saudagar and associates
Engineerrajput saudagar and associates
Chartered AccountantASHOK V DHOOT & COMPANY
Chartered AccountantAshok V Dhoot
PartnerRole in project
AJINKYA BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04032620088Dec 2025 → Oct 2026

Reason as filed by the promoterThe project has been substantially completed; however, there has been a delay in obtaining the Occupation Certificate OC from the Competent Authority. The delay is procedural and administrative in nature and is beyond the control of the Promoter. the application for Occupation Certificate has already been submitted to the concerned authority, and follow-ups are being carried out regularly.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM_NO_1.pdf26 Jul 2026
Withdrawal Update Form 2File: FORM_2.pdf26 Jul 2026
Withdrawal Update Form 3File: FORM_NO_3.pdf26 Jul 2026
Withdrawal Update Form 1File: Form 1_compressed.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2_compressed.pdf3 Jun 2026
Withdrawal Update Form 3File: form_3_0_compressed (1).pdf3 Jun 2026
Form 2A (FY 2025-2026)File: form 2a updated .pdf2 May 2026
Withdrawal Update Form 1File: FORM_NO_1.pdf4 Mar 2026
Withdrawal Update Form 1File: FORM_NO_1.pdf4 Mar 2026
Withdrawal Update Form 2File: FORM_NO_2.pdf4 Mar 2026
Withdrawal Update Form 2File: FORM_NO_2.pdf4 Mar 2026
Withdrawal Update Form 3File: FORM_3.pdf4 Mar 2026
Withdrawal Update Form 3File: FORM_3.pdf4 Mar 2026
Withdrawal Update Form 1File: FORM_1.pdf14 Oct 2025
Withdrawal Update Form 2File: FORM_2.pdf14 Oct 2025
Withdrawal Update Form 3File: FORM_3.pdf14 Oct 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM_NO_5.pdf13 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_compressed (2).pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (16).pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE (1).pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf1 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1 (1).pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2 (1).pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSUIRE.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3_compressed.pdf26 Jul 2024
Details of encumbrances concerned to FinanceFile: revised encumbrance.pdf24 Apr 2024
Details of encumbrances concerned to LegalFile: revised encumbrance.pdf24 Apr 2024
CERSAI detailsFile: cersai revised (1).pdf24 Apr 2024
Other - TechnicalFile: declaration.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (2).pdf17 Mar 2024
Other - TechnicalFile: Sanction.pdf11 Mar 2024
Proforma of Agreement for saleFile: ajinkya ATS.pdf29 Feb 2024
Other - TechnicalFile: 1 Building Plan Approval _ NA Order for plotted development (7) (1).pdf29 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumrance.pdf15 Sep 2023
Details of encumbrances concerned to LegalFile: Encumrance.pdf15 Sep 2023
Copy of the legal title reportFile: Legal title upload final.pdf9 Sep 2023
Building plan approvalFile: Building Plan_compressed.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_compressed.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Merge_merged.pdf22 Aug 2023
Declaration about Commencement CertificateFile: Declaration CC.pdf22 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: No interest real estate merged.pdf22 Aug 2023
Proforma of Allotment letterFile: Allotment letter.pdf22 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a.pdf22 Aug 2023
Deviation Report with respect to Allotment letterFile: no deviation in allotment letter.pdf22 Aug 2023
Deviation Report with respect to model copy of AgreementFile: no deviation in allotment letter.pdf22 Aug 2023
Layout approvalFile: NA Layout.pdf21 Aug 2023
PAN CardFile: Pan.pdf21 Aug 2023
Copy of Layout Approval (in case of layout)File: NA Layout.pdf21 Aug 2023
Declaration in FORM BFile: FORM B - ABD.pdf21 Aug 2023

How this compares with Latur

38%of this project is bookeddistrict median 0%
10%of Latur projects moved their completion datethis one moved by 10 months
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep AJINKYA PRIME CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGGROYA NAGAR150+ in Latur

2 kmAJINKYA PRIME CITYCompleted 3Lapsed / revoked 6Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: AJINKYA BUILDERS AND DEVELOPERS

AJINKYA BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including AJINKYA PRIME CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if AJINKYA PRIME CITY is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AJINKYA PRIME CITY?

The registered promoter entity is AJINKYA BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AJINKYA PRIME CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AJINKYA PRIME CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AJINKYA PRIME CITY?

The professionals named in the filing: Architect: rajput saudagar and associates; Engineer: rajput saudagar and associates; Chartered Accountant: ASHOK V DHOOT & COMPANY; Chartered Accountant: Ashok V Dhoot. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AJINKYA PRIME CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AJINKYA PRIME CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AJINKYA PRIME CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.