Home / Browse projects / Latur, Maharashtra / Madhuram Solitaire

Registered No litigation declared Others project

Madhuram Solitaire

By DB CONSTRUCTIONS LLP

RG-MH-31379 · RERA P52400079714 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 12 months from the original
0 of 11Construction stages donefurthest along: Excavation, 90%
75 of 90Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

Madhuram Solitaire is a Others project by DB CONSTRUCTIONS LLP in Latur, Maharashtra, registered with MahaRERA as P52400079714 on 21 Mar 2025. Possession is promised by 31 Dec 2029. The completion date has moved by 12 months from the original filing. 15 of the 90 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameMadhuram Solitaire
  • TypeOthers
  • Location
    • Plot No 01
    • Latur
    • Latur (M Cl)
    • 413512
  • Pincode413512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400079714
  • ReraGenie IDRG-MH-31379

Builder

  • NameDB CONSTRUCTIONS LLP
  • Entity typePartnership
  • GSTIN27AAOFD0745M1Z2
  • PartnersDURGESH RAJESH BRIJWASI, BANKAT SRINIWAS BHANGDIYA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMar 2025First promiseDec 2028Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed38 files

Current status

17%15 of 90 units booked
5.3%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Madhuram SolitaireNA1514296190

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

Madhuram Solitaire: 14% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)60%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed194

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots194
Closed/Covered64
Open Space130

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,507 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Shivani Laxmikant MachileLatur (M Cl)Latur
Laxmikant alias Manoj Bapurao MachileLatur (M Cl)Latur
Laxmikant Bapurao Machile (HUF)Latur (M Cl)Latur

Approvals and building plan

Sanctioning authorityLatur Municipal Corporation
Permissible FSI17673.48
Proposed, not sanctioned9,341 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREYAS KHARDEKAR BUILDING, AUSA ROAD,LATUR, LATURPIN - 413531
Estimated costRs 83.89 cr
Cost incurredRs 4.47 cr
Work done5.33%
BuildingWingEstimatedIncurred
Madhuram SolitaireNARs 78.08 crRs 4.47 cr
-NARs 5.81 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDurgesh Rajesh Brijwasi
ArchitectZ Design Studio
EngineerArrowhead Estimators & Billing Consultants
EngineerVikas Shyam Devale
Chartered AccountantA S Savant & Co
Chartered AccountantMGVL ASSOCIATES
Chartered AccountantJSPM And Associates LLP
PartnerRole in project
DB CONSTRUCTIONS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29062621590Dec 2028 → Dec 2029

Reason as filed by the promoterThe delay has occurred due to unforeseen circumstances, including prolonged and unseasonal rainfall causing severe waterlogging after excavation and foundation works, acute shortage of skilled labour for RCC works due to repeated elections, and procurement and financial constraints, all of which materially affected the construction schedule. In view of these unavoidable circumstances, we respectfully seek extension of the Project completion timeline from 31/12/2028 to 31/12/2029.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A scan copy (1).pdf11 Jul 2026
Withdrawal Update Form 1File: Form1 Madhuram Solitaire as on june 2026.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 Madhuram Solitaire as on june 2026.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 Madhuram Solitaire as on june 2026.pdf8 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf2 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A - Madhuram Solitaire for FY 2024-25.pdf17 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Madhuram _01.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Madhuram 01_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2 Madhuram_01.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1.pdf19 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Rera Format A.pdf19 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B -Declaration from the Bank_compressed.pdf19 Feb 2025
Layout approvalFile: Approved Final Layout.pdf18 Feb 2025
Building plan approvalFile: Approved Plan_01 Madhuram.pdf18 Feb 2025
PAN CardFile: DB PAN.pdf18 Feb 2025
Copy of the legal title reportFile: Title Report_compressed_11zon.pdf18 Feb 2025
Copy of Layout Approval (in case of layout)File: Approved Final Layout.pdf18 Feb 2025
Proforma of Allotment letterFile: AL_MADHURAM SOLITAIRE_DB CONSTRUCTIONS LLP_18022025.pdf18 Feb 2025
Declaration in FORM BFile: FORM -B (Promoter)_compressed.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Madhuram 00_compressed_11zon.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf18 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: DB BUILDING PERMISSION CERTIFICATE.pdf18 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_01 Madhuram.pdf18 Feb 2025
CERSAI detailsFile: Declaration of Cersai.pdf18 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation_AL_MADHURAM SOLITAIRE_DB CONSTRUCTIONS LLP_18022025_compressed.pdf18 Feb 2025
Other - FinanceFile: Declaration .pdf18 Feb 2025
Other - FinanceFile: Declaration Madhuram Solitaire.pdf18 Feb 2025
Other - TechnicalFile: 1 Other - Technical (2).pdf18 Feb 2025
Other - TechnicalFile: CC verification screenshot.pdf18 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Deviation_AFS__MADHURAM SOLITAIRE_DB CONSTRUCTIONS LLP_18022025_compressed.pdf18 Feb 2025
Proforma of Agreement for saleFile: AFS Madhuram Solitaire.pdf18 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - DB_merged_compressed.pdf18 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured Madhuram Solitaire_11zon.pdf18 Feb 2025
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter -Dues.pdf17 Feb 2025
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter - Litigations.pdf17 Feb 2025
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1) (1).pdf17 Feb 2025
Details of encumbrances concerned to LegalFile: No Encumbrance Letter -Dues.pdf17 Feb 2025
Details of encumbrances concerned to LegalFile: No Encumbrance Letter - Litigations.pdf17 Feb 2025

How this compares with Latur

17%of this project is bookeddistrict median 0%
10%of Latur projects moved their completion datethis one moved by 12 months
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep Madhuram Solitaire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Latur150+ in Latur

2 kmMadhuram SolitaireCompleted 3Lapsed / revoked 4Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: DB CONSTRUCTIONS LLP

DB CONSTRUCTIONS LLP has 2 registrations on MahaRERA, including MADHUBAN and Madhuram Solitaire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if Madhuram Solitaire is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Madhuram Solitaire?

The registered promoter entity is DB CONSTRUCTIONS LLP, a partnership as per the filing. Its GSTIN 27AAOFD0745M1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Madhuram Solitaire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Madhuram Solitaire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Madhuram Solitaire?

The professionals named in the filing: Architect: Durgesh Rajesh Brijwasi; Architect: Z Design Studio; Engineer: Arrowhead Estimators & Billing Consultants; Engineer: Vikas Shyam Devale; Chartered Accountant: A S Savant & Co; Chartered Accountant: MGVL ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Madhuram Solitaire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Madhuram Solitaire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Madhuram Solitaire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.