ReraGenieLog inGet a buyer report

Home / Browse projects / Latur, Maharashtra / Park Apartments

Registration lapsed No litigation declared Residential / Group Housing project

Park Apartments

By NITINKUMAR VIJAYKUMAR NAWANDER

RG-MH-97296 · RERA P52400033239 · Last updated on MahaRERA portal: 28 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
17 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Park Apartments is a Residential / Group Housing project by NITINKUMAR VIJAYKUMAR NAWANDER in Latur, Maharashtra, registered with MahaRERA as P52400033239 on 9 Feb 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 60 of the 77 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NamePark Apartments
  • TypeResidential / Group Housing
  • Location
    • Ring Road
    • Opp. Mount Litera Zee School
    • Khadgaon
    • Latur
    • 413512
  • Pincode413512
  • RERA no.P52400033239
  • ReraGenie IDRG-MH-97296

Builder

  • NameNITINKUMAR VIJAYKUMAR NAWANDER
  • Entity typeIndividual
  • GSTIN27ABAPN4344B3Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredFeb 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Feb 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed55 files

Current status

78%60 of 77 units booked
100.0%Work done, per cost certificate

Figures as on 28 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA9742042
Building BNA9735035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Building A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered59
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
Building A311142
Building B28735

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,677 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Feb 2026

Approvals and building plan

Sanctioning authorityDistrict Collector office
Permissible FSI7862.15
Proposed, not sanctioned7,862 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBarshi Road Latur
Estimated costRs 16.44 cr
Cost incurredRs 16.44 cr
Work done100.0%
BuildingWingEstimatedIncurred
Building ANARs 14.44 crRs 14.44 cr
Building BNARs 1.00 crRs 1.00 cr
-NARs 1.00 crRs 1.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahesh Nawander
EngineerAkshay Patil
EngineerVijaykumar Balasaheb Ghodke
Chartered AccountantKishor Bharadiya
PartnerRole in project
NITINKUMAR VIJAYKUMAR NAWANDER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Park Apartment FY-22-25 QTR-4 31032025.pdf28 Mar 2026
Form 2File: Form-2 Park Apartment FY-2024-25 QTR-4 31032025.pdf28 Mar 2026
Form 3File: Form-3 Park Apartment FY-24-25 QTR-4 31032025 SIGN.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold unsold park apartment_Building A-B.pdf28 Mar 2026
Withdrawal Update Form 1File: Form-1 Park Apartment FY-22-25 QTR-4 31032025.pdf28 Mar 2026
Withdrawal Update Form 2File: Form-2 Park Apartment FY-2024-25 QTR-4 31032025.pdf28 Mar 2026
Withdrawal Update Form 3File: Form-3 Park Apartment FY-24-25 QTR-4 31032025 SIGN.pdf28 Mar 2026
Withdrawal Update Form 1File: Form-1 Park Apartment FY-22-25 QTR-4 31032025.pdf20 Feb 2026
Withdrawal Update Form 2File: Form-2 Park Apartment FY-2024-25 QTR-4 31032025.pdf20 Feb 2026
Withdrawal Update Form 3File: Form-3 Park Apartment FY-24-25 QTR-4 31032025 SIGN.pdf20 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 park apartment 12-04-25.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 park apartments 12-04-25.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 park apartments 11-01-25.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 park apartments 11-01-25.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: pa form 2 11-10-24.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PA Form 1 11-10-24.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PA Form 1 11-10-24.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: pa form 2 11-10-24.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 park apartment 23-24.pdf13 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a park apartment 04-04-2024.pdf25 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 park apartment 04-04-2024_compressed.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 park apartment 04-04-2024_compressed.pdf6 Apr 2024
Disclosure of sold/ booked inventoryFile: Park Apartment Sold, unsold inventory 06-04-2024.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 park apartment 04-01-2024.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 park apartment 04-01-2024.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 park apartment 2022-23.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: park apartment form 1 01-10-23.pdf2 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: park apartment form 2 01-10-23.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nawander Buildtech.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a park apartment.pdf12 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 park apar 12-07-23.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 park apar 12-07-23.pdf21 Aug 2023
Disclosure of sold/ booked inventoryFile: Park Apartment Sold, unsold inventory.pdf15 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 park apartment 01-04-23.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 park appartmen 2021-22.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: park apartment form 1 05-04-2023.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 park apartment.pdf11 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A 2021-22 park appartment.pdf10 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architect certificate.pdf7 Feb 2023
Copy of the legal title reportFile: Legal Title Report (1).pdf31 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_Asset Based.pdf31 Jan 2022
Proforma of Allotment letterFile: Agreement to Sale Draft.pdf4 Jan 2022
CERSAI detailsFile: CERSAI DETAILS.pdf21 Dec 2021
Building plan approvalFile: Building Permission 1-converted-compressed.pdf15 Dec 2021
Building plan approvalFile: Building Permission 2-converted-compressed.pdf15 Dec 2021
PAN CardFile: PAN Card.pdf15 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Permission 1-converted-compressed.pdf15 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Permission 2-converted-compressed.pdf15 Dec 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf15 Dec 2021
Layout approvalFile: Layout-compressed.pdf13 Dec 2021
Details of encumbrancesFile: Details of Encumbrances.pdf13 Dec 2021
Copy of Layout Approval (in case of layout)File: Layout-compressed.pdf13 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Building Permission .pdf13 Dec 2021
Declaration in FORM BFile: Form B.pdf13 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (CA).pdf13 Dec 2021

How this compares with Latur

78%of this project is bookeddistrict median 0%
10%of Latur projects moved their completion datethis one has not
31%of Latur registrations have lapsed or been cancelledthis one is among them

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep Park Apartments on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp. Mount Litera Zee School150+ in Latur

Builder: NITINKUMAR VIJAYKUMAR NAWANDER

NITINKUMAR VIJAYKUMAR NAWANDER has 2 registrations on MahaRERA, including Park Apartments and FOUR SEASONS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What does it mean that Park Apartments shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Park Apartments is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Park Apartments?

The registered promoter entity is NITINKUMAR VIJAYKUMAR NAWANDER, an individual as per the filing. Its GSTIN 27ABAPN4344B3Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Park Apartments?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Park Apartments?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Park Apartments?

The professionals named in the filing: Architect: Mahesh Nawander; Engineer: Akshay Patil; Engineer: Vijaykumar Balasaheb Ghodke; Chartered Accountant: Kishor Bharadiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Park Apartments?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Park Apartments. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Park Apartments to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.