Registered No litigation declared Others project

VENKATESHWARA GREENS

By LAHOTI PROPERTIES

RG-MH-00483 · RERA P52400001029 · Last updated on MahaRERA portal: 19 Jan 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 78 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 78 months from the original
13 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 98%
105 of 257Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

VENKATESHWARA GREENS is a Others project by LAHOTI PROPERTIES in Latur, Maharashtra, registered with MahaRERA as P52400001029 on 25 Jul 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 78 months from the original filing. 152 of the 257 units on this registration are recorded sold or booked, and 13 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVENKATESHWARA GREENS
  • TypeOthers
  • Location
    • Plot No4 /1
    • 4/3
    • 4/4
    • 4/5
    • Khopegaon
    • Latur
    • 413531
  • Pincode413531
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400001029
  • ReraGenie IDRG-MH-00483

Builder

  • NameLAHOTI PROPERTIES
  • Entity typePartnership

Key dates

this monthRegisteredJul 2017First promiseJun 2022Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jul 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2022)
  • Buildings4 building records
  • Documents filed42 files

Current status

59%152 of 257 units booked

Figures as on 19 Jan 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIT 1NA8852052
UNIT 2NA8852052
UNIT 3NA3123121420142
UNIT 4NA3301111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 19 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 98%.

UNIT 128%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)8%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT 228%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)10%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT 362%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises74%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.69%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
UNIT 470%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises79%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 19 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes63%
Water SupplyYes58%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes72%
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes35%
Street LightingYes78%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes18%
Open ParkingYes15%
Club HouseYes93%

Parking filed142

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots142
Open Space142

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area45,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
SHRIKANT DWARKADASJI BHUTADALatur (M Cl)Latur
SHRIRAM DWARKADASJI BHUTADALatur (M Cl)Latur
BALKISHAN DWARKADSAJI BHUTADALatur (M Cl)Latur
SOW USHABAI DAMODARJI BHUTADALatur (M Cl)Latur
GANGABHISHAN MADANGOPALJI BHUTADALatur (M Cl)Latur

Approvals and building plan

Sanctioning authorityKhopegaon Grampanchayat
Permissible FSI32560.79
Proposed, not sanctioned32,561 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANJGOLAI,LATUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAJJAD LODHI
EngineerFAIZUDDIN MOHAMMED
Chartered AccountantParesh Suresh Ladda
PartnerRole in project
LAHOTI PROPERTIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52400012685Jun 2022 → Jun 2023

Reason as filed by the promoterWe would like to state that above project was duly registered with regulatory authority which expired on 30/06/2022. Sir, we would like to apply for extension of our project till 30/06/2023. Sir, our project was adversely affected due to COVID-19 situation and no work was carried out during the lockdown period as workers were not available as well as construction material was also not available due to transportation issues. Due to this our project got did not go as per planned schedule and booking were also not achieved due to post COVID-19 slowdown in the market. We were also financially stru

EA18122518749Jun 2022 → Dec 2028

Reason as filed by the promoterThe delay in completion of the project is due to reasons beyond the control of the promoter. The project faced financial disturbance arising from escalation in construction material costs, increase in labour expenses, and constraints in availability of timely finance, which adversely affected cash flow and progress of construction.Further, the main partner of the firm, who is responsible for overall project supervision and financial decision-making, suffered serious health issues during the project period. Due to prolonged medical treatment and recovery, effective monitoring and coordination o

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12605386BHAGYAWATI NANDKISHOR AGRAWALLAHOTI PROPERTIES22/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 2021.pdf19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 2022.pdf19 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Dec 2022.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering 2021.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineering 2022.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineering Dec 2022.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: Details of Booking.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA March 2021.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA March 2022.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA DEC 2022 .pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-22.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - December 2020.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - March 2021.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - June 2021.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf19 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf18 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 (18-19).pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 (19-20).pdf17 Aug 2021
Certificates of CA (Form 5)File: Lahoti Properties.pdf19 Nov 2018
Building plan approvalFile: Building Sanction.pdf21 Jul 2017
Building Plan Approval (IOD)File: Building Sanction.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf21 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf21 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf21 Jul 2017
Layout approvalFile: layout1.pdf20 Jul 2017
Layout approvalFile: layout 2.pdf20 Jul 2017
Layout approvalFile: layout 3.pdf20 Jul 2017
Layout approvalFile: layout 4.pdf20 Jul 2017
Layout approvalFile: layout 5.pdf20 Jul 2017
Layout approvalFile: layout 6.pdf20 Jul 2017
PAN CardFile: PAN of Firm.pdf20 Jul 2017
Copy of the legal title reportFile: Search Report.pdf20 Jul 2017
Details of encumbrancesFile: EC Certificate.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: layout1.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: layout 2.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: layout 3.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: layout 4.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: layout 5.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: layout 6.pdf20 Jul 2017
Declaration in FORM BFile: Declaration.pdf20 Jul 2017
Proforma of Allotment letterFile: Sale Agreement.pdf20 Jul 2017

How this compares with Latur

59%of this project is bookeddistrict median 0%
10%of Latur projects moved their completion datethis one moved by 78 months
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep VENKATESHWARA GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khopegaon150+ in Latur

2 kmVENKATESHWARA GREENSCompleted 3Lapsed / revoked 3Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: LAHOTI PROPERTIES

LAHOTI PROPERTIES has 1 registration on MahaRERA, including VENKATESHWARA GREENS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if VENKATESHWARA GREENS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VENKATESHWARA GREENS?

The registered promoter entity is LAHOTI PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VENKATESHWARA GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VENKATESHWARA GREENS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VENKATESHWARA GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VENKATESHWARA GREENS?

The professionals named in the filing: Architect: SAJJAD LODHI; Engineer: FAIZUDDIN MOHAMMED; Chartered Accountant: Paresh Suresh Ladda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VENKATESHWARA GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VENKATESHWARA GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VENKATESHWARA GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.