Home / Browse projects / Latur, Maharashtra / SITA VIHAR -1

Registered No litigation declared Residential / Group Housing project

SITA VIHAR -1

By North West Infra

RG-MH-31372 · RERA P52400079706 · Last updated on MahaRERA portal: 31 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 4 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Latur registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
5 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 0%
256 of 256Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SITA VIHAR -1 is a Residential / Group Housing project by North West Infra in Latur, Maharashtra, registered with MahaRERA as P52400079706 on 20 Mar 2025. Possession is promised by 31 Dec 2029. 0 of the 256 units on this registration are recorded sold or booked, and 5 of 44 construction stages are filed complete.

At a glance

Project

  • NameSITA VIHAR -1
  • TypeResidential / Group Housing
  • Location
    • AUSA NILNGA ROAD
    • IN FRONT OF PODAR INTERNATION SCHOOL
    • Ausa (M Cl)
    • Ausa
    • Latur
    • 413520
  • Pincode413520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52400079706
  • ReraGenie IDRG-MH-31372

Builder

  • NameNorth West Infra
  • Entity typePartnership
  • GSTIN27AAPFN3002J1Z9
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredMar 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed67 files

Current status

0%0 of 256 units booked

Figures as on 31 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA9756056
BUILDING BNA9756056
BUILDING CNA8672072
BUILDING DNA8672072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed343

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots343
Closed/Covered53
Open Space290
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A156681
BUILDING B156277
BUILDING C118192
BUILDING D128193

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,368 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2026

Approvals and building plan

Sanctioning authorityCHIEF OFFICER, AUSA MUNICIPAL COUNCIL
Permissible FSI18106.2
Proposed, not sanctioned13,738 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, HOTEL VYAANKATESHA,AUSA ROAD, LATUR 413512

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRicha Nawander
EngineerVijaykumar Balasaheb Ghodke
Chartered AccountantKishor Bharadiya & Co
Chartered AccountantRamnivas Karwa
Chartered AccountantPurshottam Ramnivas Karwa
PartnerRole in project
North West Infra-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: SV-Form-1 FY26-27 QTR-1.pdf31 Jul 2026
Form 2File: SV-Form-2 FY26-27 QTR-1.pdf31 Jul 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory (SV).pdf31 Jul 2026
Form 3File: SV-Form-3 FY26-27 QTR-1.pdf31 Jul 2026
Form 2A (FY 2025-2026)File: SV-Form-2A FY-25-26.pdf22 May 2026
Form 1File: SV-Form-1 FY-25-26 QTR -3.pdf20 Apr 2026
Form 2File: SV-FORM-2 FY-25-26 QTR-3.pdf20 Apr 2026
Form 3File: SV-Form-3 FY-25-26 QTR-3.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: SV-SOLD AND UNSOLD BOOKED DISCLOSURE FY-25-26 QTR-3.pdf20 Apr 2026
Form 1File: SV-FORM-1 FY-25-26 QTR-4.pdf20 Apr 2026
Form 2File: SV-FORM-2 FY-25-26 QTR-4.pdf20 Apr 2026
Form 3File: SV-Form-3 FY-25-26 QTR-4.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: SV-SOLD AND UNSOLD BOOKED DISCLOSURE FY-25-26 QTR-4.pdf20 Apr 2026
Form 1File: From-1 Sita Vihar-1 FY-25-26 QTR-1.pdf15 Dec 2025
Form 2File: Form-2 Sita Vihar-1 Engineer Cert FY-25-26 QTR-1.pdf15 Dec 2025
Form 3File: From-3 Sita Vihar-1 FY-25-26 QTR-1.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sita Vihar FY-25-26 QTR-1.pdf15 Dec 2025
Form 1File: Form-1 Sita Vihar-1 FY-25-26 QTR-2.pdf15 Dec 2025
Form 2File: Form-2 Sita Vihar-1 Engineer Cert FY-25-26 QTR-2.pdf15 Dec 2025
Form 3File: From-3 Sita Vihar-1 FY-25-26 QTR-2.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sita Vihar FY-25-26 QTR-2.pdf15 Dec 2025
Form 5 (FY 2024-2025)File: P52400079706.pdf29 Sep 2025
Form 1File: form 1 sita vihar 12-04-25.pdf24 Sep 2025
Form 2File: form 2 sita vihar 12-04-25.pdf24 Sep 2025
Form 3File: form 3 sita vihar 12-04-25.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: SV all building sold unsold disclosure 12-04-2025.pdf24 Sep 2025
Form 2A (FY 2024-2025)File: form 2a sita vihar 1 2024-25.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sita vihar 12-04-25.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sita vihar 12-04-25.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sita vihar 12-04-25.pdf15 Apr 2025
Other - LegalFile: AMENMEND PARTNERSHIP DEED.pdf28 Feb 2025
Other - LegalFile: Partneship With Letter.pdf6 Feb 2025
Other - TechnicalFile: CC Verification_compressed.pdf6 Feb 2025
CERSAI detailsFile: CERSAI_Search_Report_200337456199_For_Asset_Based_Search_28_01_2025_19_52_41_132.pdf28 Jan 2025
Other - FinanceFile: PARTNERSHIP DEED MERGED .pdf28 Jan 2025
Other - TechnicalFile: Merged For Sita Vihar.pdf27 Jan 2025
Details of encumbrances concerned to FinanceFile: 6 NO ENC - FIN LEGAL.pdf18 Jan 2025
Details of encumbrances concerned to LegalFile: 6 NO ENC - FIN LEGAL.pdf18 Jan 2025
Declaration about Commencement CertificateFile: 2 FORMAT - D .pdf18 Jan 2025
CERSAI detailsFile: 10 CERSAI Declaration .pdf18 Jan 2025
Proforma of Allotment letterFile: 8 Updated Annexure 1 - Model Form of Allotment Letter (3).pdf18 Jan 2025
Proforma of Agreement for saleFile: ATS with Annexure 1.pdf18 Jan 2025
Deviation Report with respect to Allotment letterFile: 4 Deviation Report (Allot Letter).pdf18 Jan 2025
Deviation Report with respect to model copy of AgreementFile: 3 Deviation Report (Agree to Sale).pdf18 Jan 2025
Other - LegalFile: Registry Gat-191-B_compressed.pdf18 Jan 2025
Other - FinanceFile: Registry Gat-191-B_compressed.pdf18 Jan 2025
Other - TechnicalFile: 15 Annexure - A-1.pdf18 Jan 2025
Layout approvalFile: 191 APPROVAL DWG.pdf17 Jan 2025
Building plan approvalFile: 191 APPROVAL DWG.pdf17 Jan 2025
PAN CardFile: 1 PAN Card.pdf17 Jan 2025
Copy of the legal title reportFile: serch report sita vihar 28-02-25.pdf17 Jan 2025
Copy of Layout Approval (in case of layout)File: 191 APPROVAL DWG.pdf17 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 191 APPROVAL DWG.pdf17 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 191 APPROVAL CERTIFICATE .pdf17 Jan 2025
Declaration in FORM BFile: Form B Sita Vihar .pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 23 form 1 - architect.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 24 form 2 - engineers.pdf17 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: 20 Disclosure of Finance availed (1).pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sita vihar_compressed.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 9 Disclosure of interest in Mahesh nawander.pdf17 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 9 Disclosure of interest in nitinkumar nawander.pdf17 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: SITA VIHAR-1 FORMAT-A.pdf17 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank.pdf17 Jan 2025
Other - LegalFile: Land Details.pdf17 Jan 2025
Other - FinanceFile: Land Details.pdf17 Jan 2025
Other - TechnicalFile: Land Details.pdf17 Jan 2025
Other - TechnicalFile: 15 Annexure - Sita Vihar.pdf17 Jan 2025

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NAWANDER LANDMARK 2P52500078880Tuljabhawani Engineering Collage, Osmanabad-Jan 2025OngoingDec 2029Not due yet
DWARKA VIHARP52400078556NEAR GUJRATI ENGLISH SCHOOL, Latur156Dec 2024OngoingDec 2028Not due yet
Park ApartmentsP52400033239Opp. Mount Litera Zee School, Latur77Feb 2022CompletedDec 2025Nov 2025
DWARKA PURIP52400026170Beside Deshmukh Water Plant, Latur-Aug 2020CompletedJun 2025Nov 2024
Park StreetP52400016239Opp. Mount Litera Zee School, Latur-Apr 2018CompletedDec 2024Aug 2024
Dwarka NagariP52400000234Beside Old MIDC, Latur-Jul 2017CompletedDec 2023Aug 2022

How this compares with Latur

0%of this project is bookeddistrict median 0%
10%of Latur projects moved their completion datethis one has not
31%of Latur registrations have lapsed or been cancelledthis one is on the register

Computed across the 150+ Latur projects on ReraGenie, from their own filings.

Keep SITA VIHAR -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near IN FRONT OF PODAR INTERNATION SCHOOL150+ in Latur

Builder: North West Infra

North West Infra has 6 registrations on MahaRERA, including Anutham and VIJAY GEET. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Latur district page.

Frequently asked questions

What are my rights if SITA VIHAR -1 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SITA VIHAR -1?

The registered promoter entity is North West Infra, a partnership as per the filing. Its GSTIN 27AAPFN3002J1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SITA VIHAR -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SITA VIHAR -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SITA VIHAR -1?

The professionals named in the filing: Architect: Richa Nawander; Engineer: Vijaykumar Balasaheb Ghodke; Chartered Accountant: Kishor Bharadiya & Co; Chartered Accountant: Ramnivas Karwa; Chartered Accountant: Purshottam Ramnivas Karwa. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SITA VIHAR -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SITA VIHAR -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SITA VIHAR -1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.