Registration lapsed No litigation declared Residential / Group Housing project

SUNSHINE GREEN PARK PHASE V

By SHantee Homes Realty LLP

RG-MH-30490 · RERA P99000030553 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

SUNSHINE GREEN PARK PHASE V is a Residential / Group Housing project by SHantee Homes Realty LLP in Palghar, Maharashtra, registered with MahaRERA as P99000030553 on 30 Aug 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameSUNSHINE GREEN PARK PHASE V
  • TypeResidential / Group Housing
  • Location
    • NEAR VIDYA VIKASINI SCHOOL
    • GOKHIWARE
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 407208
  • Pincode407208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000030553
  • ReraGenie IDRG-MH-30490

Builder

  • NameSHantee Homes Realty LLP
  • Entity typePartnership
  • GSTIN27ACNFS5210P1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerNiyaz Abdulsamad Pathan
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

10 months past promisethis monthRegisteredAug 2021PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on30 Aug 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNSHINE GREEN PARK BLDG NO 10NA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SUNSHINE GREEN PARK BLDG NO 10: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,180 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2179.68
Proposed, not sanctioned1,180 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAURYA SHOPPING CENTRE, AMBADI ROAD S NO 16 VASAI WEST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON
ArchitectMufaddal Merchant
EngineerMohammed shoeb bhati
Chartered AccountantJINESH JOSHI
PartnerRole in project
SHantee Homes Realty LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jan 2025

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: GREEN PARK BLDG-10.pdf24 Apr 2026
Form 2File: GREEN PARK BLDG-10.pdf24 Apr 2026
Form 3File: SUNSHINE GREEN PARK BLDG-10.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: GREEN PARK BLDG-10.pdf24 Apr 2026
Form 1File: FORM 1 SPRING FIELD.pdf22 Oct 2025
Form 2File: FORM-2 SPRING FIELD CL-1 TO13.pdf22 Oct 2025
Form 3File: FORM-3 SPRING FIELD CL-1 TO 13.pdf22 Oct 2025
Disclosure of Sold and Booked InventoryFile: SPRING FIELD 30062025.pdf22 Oct 2025
Form 1File: FORM 1 SPRING FIELD.pdf22 Oct 2025
Form 2File: FORM 2 SPRING FIELD.pdf22 Oct 2025
Form 3File: FORM 3 SPRING FILED.pdf22 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD SPRING FIELD.pdf22 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GREEN PARK BLDG 10 FORM 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GREEN PARK BLDG 10 FORM 3.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GREEN PARK BLDG 10 FORM 2.pdf24 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 SUNSHINE GREEN PARK BLDG-10.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A GREEN PARK BLDG-10 31032024.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 GREEN PARK BLDG 10.pdf11 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGN CERT GREEN PARK BLDG NO 10.pdf8 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Green Park Bldg 6_7_8_10.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUNSHINE GREEN PARK BLDG-10.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUNSHINE GREEN PARK BLDG-10.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: GREEN PARK BLDG-10.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GREEN PARK BLDG-10.pdf30 Jul 2024
Details of encumbrancesFile: ENCUMBRANCE GREEN PARK IV.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 SUNSHINE GREEN PARK BLDG-10.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 SUNSHINE GREEN PARK BLDG-10.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: GREEN PARK BLDG-10.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SUNSHINE GREEN PARK BLDG-10.pdf29 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 GREEN PARK 10.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISED DEVELOPMENT PERMISION31082023.pdf13 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-3 SUNSHINE GREEN PARK 10.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUNSHINE GREEN PARK BLDG-10.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2SUNSHINE GREEN PARK BLDG-10.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: SUNSHINE GREEN PARK BLDG-10.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SUNSHINE GREEN PARK 10.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GREEN PARK PH-V.pdf3 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SUNSHINE GREEN PARK BLDG-10.pdf3 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GREEN PARK PH-V 31-03-2023 RAHUL.pdf2 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUNSHINE GREEN PARK BLDG-10 NEW.pdf1 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GREEN PARK BLDG-10.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GREEN PARK BLDG-10.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GREEN PARK BLDG-10.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SUNSHINE GREEN PARK BLDG-10.pdf21 Feb 2023
Details of encumbrancesFile: encumbrance letter- phase 5.pdf17 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: REVISED DEV PERMISSION.pdf2 Jul 2022
Disclosure of sold/ booked inventoryFile: GREEN PARK BLDG-10.pdf10 Mar 2022
Disclosure of sold/ booked inventoryFile: SUNSHINE GREEN PARK PH-5 BLDG-10.pdf10 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: COM CERT.pdf18 Aug 2021
Declaration in FORM BFile: FORM B BLDG-10.pdf18 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BLDG NO 10.pdf18 Aug 2021
OtherFile: APPROVAL.pdf18 Aug 2021
OtherFile: BUILDING APPROVAL BLDG 10.pdf18 Aug 2021
Layout approvalFile: layout plan Gp.pdf17 Aug 2021
Building plan approvalFile: bldg no 10 GP.pdf17 Aug 2021
PAN CardFile: Pan Card.pdf17 Aug 2021
Copy of the legal title reportFile: LEGAL TITLE FORMAT A.pdf17 Aug 2021
Details of encumbrancesFile: ENCUMBRANCE CERT BLDG 10.pdf17 Aug 2021
Copy of Layout Approval (in case of layout)File: layout plan Gp.pdf17 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: bldg no 10 GP.pdf17 Aug 2021
Declaration about Commencement CertificateFile: CC FORMAT D BLDG NO 10.pdf17 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 BLDG NO 10.pdf17 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 BLDG NO 10.pdf17 Aug 2021
Proforma of Allotment letterFile: DECLARATION FOR AGREEMENT AND ALLOTMENT.pdf17 Aug 2021

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SUNSHINE GREEN PARK PHASE -3P99000017859GOKHIVARE, Palghar180Sep 2018CompletedDec 2026Registered original: Jun 2022Jan 2025
SUNSHINE GREEN PARK PHASE 2P99000001294VASAI EAST, Palghar-Jul 2017CompletedJun 2025Registered original: Mar 2019Jan 2025
SHAMROCK RESIDENCYP99000020998MANICKPUR, Palghar-May 2019CompletedApr 2024Sep 2021
ROMAN RESIDENCYP99000021827WADAVALI, Palghar62Jul 2019CompletedDec 2023Jan 1970
SARGAM RESIDENCYP99000016959NAIGAON, Palghar203Jun 2018CompletedDec 2022Jan 1970
SUNSHINE GREEN PARK PHASE IP99000001370VASAI EAST, Palghar-Jul 2017CompletedMar 2018Late, Jul 2018
SARGAM AVENUEP99000001489Chandrapada, Palghar132Jul 2017CompletedMar 2018Jan 1970

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNSHINE GREEN PARK PHASE V on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOKHIWARE3,200+ in Palghar

2 kmSUNSHINE GREEN PARK PHASCompleted 44Lapsed / revoked 28Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 118 registered projects within 2 km.

Builder: SHantee Homes Realty LLP

SHantee Homes Realty LLP has 8 registrations on MahaRERA, including SUNSHINE GREEN PARK PHASE I and SUNSHINE GREEN PARK PHASE 2. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that SUNSHINE GREEN PARK PHASE V shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SUNSHINE GREEN PARK PHASE V is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNSHINE GREEN PARK PHASE V?

The registered promoter entity is SHantee Homes Realty LLP, a partnership as per the filing. Its GSTIN 27ACNFS5210P1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNSHINE GREEN PARK PHASE V?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUNSHINE GREEN PARK PHASE V?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNSHINE GREEN PARK PHASE V?

The professionals named in the filing: Architect: ENCON; Architect: Mufaddal Merchant; Engineer: Mohammed shoeb bhati; Chartered Accountant: JINESH JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNSHINE GREEN PARK PHASE V?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNSHINE GREEN PARK PHASE V. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNSHINE GREEN PARK PHASE V to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.