Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2018Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

SARGAM AVENUE is a Residential / Group Housing project by Shantee Housing in Palghar, Maharashtra, registered with MahaRERA as P99000001489 on 28 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2018. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSARGAM AVENUE
  • TypeResidential / Group Housing
  • Location
    • Chandrapada
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000001489
  • ReraGenie IDRG-MH-12068

Builder

  • NameShantee Housing
  • Entity typePartnership
  • GSTIN27ACIFS0384F1Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Partnerniyaz abdul samad pathan
  • Other registrations8 more →
  • Completed7 of 9
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017PromisedMar 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jul 2017
  • Promised completion31 Mar 2018
  • Revised completionNone
  • Buildings2 building records
  • Documents filed22 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SARGAM AVENUENA60000
CFC BUILDINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

SARGAM AVENUE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CFC BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered10
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
SARGAM AVENUE9211
CFC BUILDING145

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,090 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5360.4
Proposed, not sanctioned4,860 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTuling road Nalsopara East

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON
ArchitectMufaddal Merchant
EngineerMohammed Shoeb Bhati
PartnerRole in project
Shantee Housing-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000043983ANJOO AWADHESH MAURYA & AWADHESH MAURYA1. RAAZ A. PATHAN 2. NIYAZ A. PATHAN BOTH PARTNERS OF M/s. SHANTEE HOUSING03/04/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Nov 2021

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPATION CRT.pdf3 Nov 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REG CERTIFICATE.pdf3 Nov 2021
OtherFile: Sargam Avenue.pdf18 Jun 2019
Certificates of CA (Form 5)File: form 5 sargam avenue.pdf18 Dec 2018
Certificates of Architect (Form 4)File: form 4 architect certificate for OC.pdf28 Jul 2018
OtherFile: SARGAM AVENUE OC INWARD.pdf1 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARGAM FORM 1.pdf29 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SAPPHIRE FORM 2.pdf29 Oct 2017
Certificates of CA (Form 3)File: SARGAM FORM 3.pdf29 Oct 2017
Building plan approvalFile: SARGAM LAYOUT.pdf23 Jul 2017
Layout approvalFile: SARGAM LAYOUT.pdf23 Jul 2017
Copy of Layout Approval (in case of layout)File: SARGAM LAYOUT.pdf23 Jul 2017
Building Plan Approval (IOD)File: SARGAM LAYOUT.pdf23 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARGAM AVENUE FORM1.pdf23 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARGAM AVENUE FORM2.pdf23 Jul 2017
Certificates of CA (Form 3)File: SARGAM AVENUE FORM3.pdf23 Jul 2017
Proforma of Allotment letterFile: DRAFT AGREE AND ALLOTMENT.pdf23 Jul 2017
PAN CardFile: Shantee Housing Pan Card.pdf20 Jul 2017
Copy of the legal title reportFile: SEARCH TITLE REPORT.pdf20 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE SARGAM AVENUE.pdf20 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: REV DEV BLDG .pdf20 Jul 2017
Declaration in FORM BFile: FORM B SARGAM.pdf20 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SARGAM AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chandrapada3,200+ in Palghar

2 kmSARGAM AVENUECompleted 33Lapsed / revoked 21Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: Shantee Housing

Shantee Housing has 9 registrations on MahaRERA, including Sunshine Palace and SUNSHINE SAPPHIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SARGAM AVENUE is delayed beyond 31 Mar 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARGAM AVENUE?

The registered promoter entity is Shantee Housing, a partnership as per the filing. Its GSTIN 27ACIFS0384F1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARGAM AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SARGAM AVENUE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SARGAM AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARGAM AVENUE?

The professionals named in the filing: Architect: ENCON; Architect: Mufaddal Merchant; Engineer: Mohammed Shoeb Bhati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARGAM AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARGAM AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARGAM AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.