Home / Browse projects / Palghar, Maharashtra / SUNSHINE GREEN PARK PHASE I

Completed No litigation declared Others project

SUNSHINE GREEN PARK PHASE I

By SHantee Homes Realty LLP

RG-MH-10757 · RERA P99000001370 · Last updated on MahaRERA portal: 27 Apr 2022

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 6 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2018Possession promisedregistration recorded completed
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
4Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

SUNSHINE GREEN PARK PHASE I is a Others project by SHantee Homes Realty LLP in Palghar, Maharashtra, registered with MahaRERA as P99000001370 on 27 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2018. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSUNSHINE GREEN PARK PHASE I
  • TypeOthers
  • Location
    • GOKHIVARE
    • VASAI EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000001370
  • ReraGenie IDRG-MH-10757

Builder

  • NameSHantee Homes Realty LLP
  • Entity typePartnership
  • GSTIN27ACNFS5210P1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerNiyaz Abdulsamad Pathan
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredJul 2017PromisedMar 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion31 Mar 2018
  • Revised completionNone
  • Buildings5 building records
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUNSHINE GREEN PARK BLDG No 03NA50000
SUNSHINE GREEN PARK BLDG N0 04NA50000
SUNSHINE GREEN PARK BLDG No 05NA20000
SUNSHINE GREEN PARK BLDG No 01NA90000
SUNSHINE GREEN PARK BLDG No 02NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 27 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

SUNSHINE GREEN PARK BLDG No 0391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUNSHINE GREEN PARK BLDG N0 0491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUNSHINE GREEN PARK BLDG No 0591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUNSHINE GREEN PARK BLDG No 0191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUNSHINE GREEN PARK BLDG No 0291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered23
Open Space35
BuildingClosed/CoveredOpen SpaceTotal
SUNSHINE GREEN PARK BLDG No 0301212
SUNSHINE GREEN PARK BLDG N0 04088
SUNSHINE GREEN PARK BLDG No 05011
SUNSHINE GREEN PARK BLDG No 01121426
SUNSHINE GREEN PARK BLDG No 0211011

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8008.18
Proposed, not sanctioned7,008 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIMAL SHOPPING CENTRE, MAIN ROAD, VASAI WEST-401202

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectENCON
ArchitectMufaddal Merchant
EngineerMohammed Shoeb Bhati
PartnerRole in project
SHantee Homes Realty LLP-

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000056021Vikas Dhondiram SapkalM/S Shantee Homes Realty LLP31/08/2018
CC006000000141204Jayprakash PalShantee Homes Realty LLP28/10/2019
CC006000000171733Prashant DesaiShantee Homes Reality LLP06/12/2019
CC006000000198290Sunshine Green Park Building No.2, 3 & 4CHS LtdM/s Shanti Homes Realty LLP Through Partner 1.Niyaz S.Pathan 2. Raaz abdul Samad Pathan13/09/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Nov 2021

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: SUNSHINE GREEN PARK BLDG NO 1 SOC.pdf27 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SUNSHINE GREEN PARK BLD1 SOCIETY REG.pdf27 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CERTIFICATE.pdf5 Nov 2021
Certificates of CA (Form 5)File: SUNSHINE GREEN PARK PH-1 FORM 5.pdf7 Mar 2020
OtherFile: Fatherwadi OC.pdf18 Jun 2019
Certificates of CA (Form 5)File: FORM 5 SUNSHINE GREEN PARK PH-1.PDF31 Dec 2018
Certificates of Architect (Form 4)File: form 4 architect certificate for OC phase 1.pdf28 Jul 2018
OtherFile: Sunshine Green Park Phase I OC inward.pdf1 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LLP FORM 1 BLD-1 TO 3.pdf29 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LLP FORM 2 BLD-1 TO 5.pdf29 Oct 2017
Certificates of CA (Form 3)File: LLP FORM 3.pdf29 Oct 2017
Certificates of CA (Form 3)File: GREEN PARK FORM 3 PHASE1.pdf24 Jul 2017
Building plan approvalFile: LAYOUT Plan (2).pdf23 Jul 2017
Layout approvalFile: LAYOUT Plan (2).pdf23 Jul 2017
Copy of the legal title reportFile: SEARCH TITLE REPORT2.pdf23 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE GREEN PARK 1.pdf23 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT Plan (2).pdf23 Jul 2017
Building Plan Approval (IOD)File: LAYOUT Plan (2).pdf23 Jul 2017
Declaration in FORM BFile: FORM B GREEN PARK PHASE1.pdf23 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LLP BLDG 1 TO 5 FORM 1.pdf23 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LLP BLDG 1 TO 5 FORM 2.pdf23 Jul 2017
Proforma of Allotment letterFile: Agreement AND ALLOTMENT.pdf23 Jul 2017
PAN CardFile: Pan Card.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: REV DEV PERMISION .pdf14 Jul 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SUNSHINE GREEN PARK PHASE -3P99000017859GOKHIVARE, Palghar180Sep 2018CompletedDec 2026Registered original: Jun 2022Jan 2025
SUNSHINE GREEN PARK PHASE 2P99000001294VASAI EAST, Palghar-Jul 2017CompletedJun 2025Registered original: Mar 2019Jan 2025
SHAMROCK RESIDENCYP99000020998MANICKPUR, Palghar-May 2019CompletedApr 2024Sep 2021
ROMAN RESIDENCYP99000021827WADAVALI, Palghar62Jul 2019CompletedDec 2023Jan 1970
SARGAM RESIDENCYP99000016959NAIGAON, Palghar203Jun 2018CompletedDec 2022Jan 1970
SARGAM AVENUEP99000001489Chandrapada, Palghar132Jul 2017CompletedMar 2018Jan 1970

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNSHINE GREEN PARK PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI EAST3,200+ in Palghar

2 kmSUNSHINE GREEN PARK PHASCompleted 47Lapsed / revoked 34Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: SHantee Homes Realty LLP

SHantee Homes Realty LLP has 8 registrations on MahaRERA, including SUNSHINE GREEN PARK PHASE I and SUNSHINE GREEN PARK PHASE 2. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SUNSHINE GREEN PARK PHASE I is delayed beyond 31 Mar 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNSHINE GREEN PARK PHASE I?

The registered promoter entity is SHantee Homes Realty LLP, a partnership as per the filing. Its GSTIN 27ACNFS5210P1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNSHINE GREEN PARK PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SUNSHINE GREEN PARK PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SUNSHINE GREEN PARK PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNSHINE GREEN PARK PHASE I?

The professionals named in the filing: Architect: ENCON; Architect: Mufaddal Merchant; Engineer: Mohammed Shoeb Bhati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNSHINE GREEN PARK PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNSHINE GREEN PARK PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNSHINE GREEN PARK PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.