ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / The Great Western Mumbai

Registered No litigation declared Residential / Group Housing project

The Great Western Mumbai

By HOABL Impactum Land Private Limited

RG-MH-31771 · RERA P99000080106 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 400.00 crore secured on the land, in favour of Bajaj Housing Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
14 of 99Construction stages doneacross 9 buildings; furthest along: Plinth, 25%
1,774 of 2,339Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

The Great Western Mumbai is a Residential / Group Housing project by HOABL Impactum Land Private Limited in Palghar, Maharashtra, registered with MahaRERA as P99000080106 on 29 Apr 2025. Possession is promised by 31 Dec 2029. 565 of the 2,339 units on this registration are recorded sold or booked, and 14 of 99 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Great Western Mumbai
  • TypeResidential / Group Housing
  • Location
    • Don Bosco Road
    • Opp HDFC Bank
    • Naigaon East
    • Naigaon East
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000080106
  • ReraGenie IDRG-MH-31771

Builder

  • NameHOABL Impactum Land Private Limited
  • Entity typeCompany
  • CINU70109MH2022PTC374991
  • GSTIN27AAGCI4909R1ZV
  • DirectorsRakesh Ramdas Gupta, Sagar Dhaku Gawde
  • Other registrations7 more →
  • Completed4 of 8
  • Declared earlier projects16 →

Key dates

this monthRegisteredApr 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings9 building records
  • Documents filed90 files

Current status

24%565 of 2,339 units booked
17.6%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 6NA36352610261
Building No 7NA36352590259
Building No 8NA36352610261
Building No 9NA36352590259
Building No 10NA36352590259
Building No 12NA36352610261
Building No 13NA36352590259
Building No 14NA36352590259
Building No 15NA36352610261

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Plinth, at 25%.

Building No 618%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 718%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 810%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 910%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 1011%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth25%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 129%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 1318%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 1418%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 1518%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1830

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,830
Closed/Covered1,272
Open Space558
BuildingClosed/CoveredOpen SpaceTotal
Building No 614362205
Building No 714062202
Building No 814362205
Building No 914062202
Building No 1014062202
Building No 1214362205
Building No 1314062202
Building No 1414062202
Building No 1514362205

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area16,571 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofBajaj Housing Finance Limited
Secured amountRs 400.00 crore
CERSAI search filedYes
Declared on16 Jun 2026
LandownerVillageDistrict
Sealink Construction Company Private LimitedMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityVasai-virar City Municipal Corporation
Permissible FSI137299.34
Proposed, not sanctioned137,299 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRBL BANK LTD,DHANNUR HOUSE,15,SIR P M ROAD, FORT,MUMBAI-400001
Estimated costRs 598.22 cr
Cost incurredRs 105.10 cr
Work done17.57%
BuildingWingEstimatedIncurred
-NARs 140.92 crRs 14.38 cr
Building No 12NARs 51.00 crRs 2.34 cr
Building No 8NARs 50.83 crRs 4.04 cr
Building No 9NARs 50.83 crRs 4.06 cr
Building No 10NARs 50.83 crRs 13.04 cr
Building No 13NARs 50.83 crRs 13.88 cr
Building No 14NARs 50.83 crRs 13.88 cr
Building No 15NARs 50.83 crRs 13.88 cr
Building No 6NARs 50.65 crRs 13.51 cr
Building No 7NARs 50.65 crRs 12.10 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay Wade
EngineerRahul Nandgaonkar
EngineerPritam Dharmraj Shetye
EngineerSamir Munj
Chartered AccountantCA Udal Sarda Mishra
Chartered AccountantU S Mishra and Associates
Chartered AccountantMahadev Sawant & Co
PartnerRole in project
HOABL Impactum Land Private Limited-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603656Prashant SinghHOABL Impactum Land Private Limited13/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Signed_Form 2A_The Great.pdf29 Jun 2026
Building plan approvalFile: Building No 6 to 10 Layout plans.pdf20 May 2026
Layout approvalFile: Demarcated Layout Plan_18052026.pdf18 May 2026
Layout approvalFile: Building Layout Plan-15042026.pdf9 May 2026
Building plan approvalFile: Unit Details-Area Plan.pdf9 May 2026
Building plan approvalFile: Parking Plan.pdf9 May 2026
Building plan approvalFile: Building Club Area Plan.pdf9 May 2026
Building plan approvalFile: Building Plan-12.pdf6 May 2026
Building plan approvalFile: Building Plan-13.pdf6 May 2026
Building plan approvalFile: Building Plan-14.pdf6 May 2026
Building plan approvalFile: Building Plan-15.pdf6 May 2026
Withdrawal Update Form 1File: Architect Certificate_The Great Western Mumbai_Signed.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate_The Great Western Mumbai_Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: CA Certificate_The Great Western Mumbai.pdf20 Apr 2026
Withdrawal Update Form 1File: Architect Certificate - The Great Western Mumbai.pdf21 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate - The Great Western Mumbai.pdf21 Jan 2026
Withdrawal Update Form 3File: CA Certificate - The Great Western Mumbai_compressed.pdf21 Jan 2026
Withdrawal Update Form 1File: Architect Certificate - The Great Western Mumbai_Signed.pdf19 Oct 2025
Withdrawal Update Form 1File: Architect Certificate - The Great Western Mumbai_Signed.pdf19 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate - The Great Western Mumbai_Signed.pdf19 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate - The Great Western Mumbai_Signed.pdf19 Oct 2025
Withdrawal Update Form 3File: CA Certificate_The Great Western Mumbai_Signed_compressed (1).pdf19 Oct 2025
Withdrawal Update Form 3File: CA Certificate_The Great Western Mumbai_Signed_compressed (1).pdf19 Oct 2025
Form 1File: Architect certificate - The Great Western Mumbai.pdf19 Jul 2025
Form 2File: Engineer certificate - The Great Western Mumbai.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: June'25_Disclosure of Sold Booked Inventory_The Great Western Mumbai-signed.pdf19 Jul 2025
Form 3File: CA certificate - The Great Western Mumbai - converted-1.pdf19 Jul 2025
Copy of the legal title reportFile: Title Report - DSK Final 1.pdf25 Apr 2025
Other - TechnicalFile: Payment receipt - additional fees paid to MahaRERA.pdf23 Apr 2025
Other - TechnicalFile: RERA Plot Demarcation.pdf23 Apr 2025
Other - TechnicalFile: Built Up Area Statement_revised.pdf23 Apr 2025
Proforma of Agreement for saleFile: RERA Agreement for Sale- RERA_Final.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Clarification Letter-For Cost in Table F-Finance-signed.pdf17 Apr 2025
CERSAI detailsFile: CERSAI_Search_Report_200349984533_For_Asset_Based_Search_17_04_2025_14_32_35_350 (1).pdf17 Apr 2025
CERSAI detailsFile: Clarification Letter-For CERSAI_signed.pdf17 Apr 2025
Other - TechnicalFile: Clarification Letter-Units to land owner-signed.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate signed.pdf16 Apr 2025
Other - TechnicalFile: CC Confirmation.pdf16 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Draft Deviation Letter.pdf16 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: End Use CA Certificate.pdf9 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance relating to Finance_final_updated.pdf4 Apr 2025
Details of encumbrances concerned to FinanceFile: No encumbrance to Legal_final.pdf4 Apr 2025
Proforma of Allotment letterFile: Allotment Letter (3).pdf4 Apr 2025
Declaration in FORM BFile: Form B Developer Final.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed_AC.pdf4 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed_EC.pdf4 Apr 2025
Other - LegalFile: Clarification Letter-Final.pdf4 Apr 2025
Declaration about Commencement CertificateFile: Declaration for Commencment Certificate-signed.pdf4 Apr 2025
CERSAI detailsFile: CERSAI Report.pdf4 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format- A_updated.pdf4 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Letter - Allotment Letter (1) - signed.pdf4 Apr 2025
Details of encumbrances concerned to LegalFile: No encumbrance to Legal_final.pdf4 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance relating to Finance_final_updated.pdf4 Apr 2025
Other - FinanceFile: Clarification Letter-Final.pdf4 Apr 2025
Other - TechnicalFile: Clarification Letter-Final.pdf4 Apr 2025
Other - TechnicalFile: One Plot one registration_final.pdf4 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B_HDFC-signed.pdf4 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured-unsecured_final_updated.pdf4 Apr 2025
Layout approvalFile: Layout Plan Sheet No 1.pdf2 Apr 2025
Building plan approvalFile: Layout Plan Sheet No 1.pdf2 Apr 2025
Building plan approvalFile: Plan Sheet No 2.pdf2 Apr 2025
Building plan approvalFile: Plan Podium Sheet No 3.pdf2 Apr 2025
Building plan approvalFile: Plan Building 6 Sheet 4-6.pdf2 Apr 2025
Building plan approvalFile: Plan Building 7 Sheet 7-10.pdf2 Apr 2025
Building plan approvalFile: Plan Building 8 Sheet 11-13.pdf2 Apr 2025
Building plan approvalFile: Plan Building 9 Sheet 14-17.pdf2 Apr 2025
Building plan approvalFile: Plan Building 10 Sheet 18-21.pdf2 Apr 2025
Building plan approvalFile: Plan Building 12 Sheet 25-27.pdf2 Apr 2025
Building plan approvalFile: Plan Building 13 Sheet 28-31.pdf2 Apr 2025
Building plan approvalFile: Plan Building 14 Sheet 32-35.pdf2 Apr 2025
Building plan approvalFile: Plan Building 15 Sheet 36-38.pdf2 Apr 2025
Building plan approvalFile: Plan Club Sheet No 39.pdf2 Apr 2025
PAN CardFile: Pan_impactum lands.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Layout Plan Sheet No 1.pdf2 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: new commencement.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan Club Sheet No 39.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan Building 15 Sheet 36-38.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan Building 14 Sheet 32-35.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan Building 13 Sheet 28-31.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan Building 12 Sheet 25-27.pdf2 Apr 2025

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise10 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Nagpur MarinaPP1190002502095Mondha, Nagpur918Jan 2026OngoingDec 2030Not due yet
AstraPlot No A-134, Survey No 148 situated at Carapur Village, , Bicholim Goa 403505, Bicholim, North Goa--OngoingJun 2030Not due yet
OrionPlot No B-442, Survey No 148 situated at Village Carapur ,, Bicholim Goa 403505, Bicholim, North Goa--OngoingMar 2030Not due yet
NovaPlot No B-362, Survey No 148 situated at Village Carapur, , Bicholim Goa 403505, Bicholim, North Goa--OngoingDec 2029Not due yet
CelestePlot No A-135, Survey No 148, Carapur Village, Bicholim, Bicholim, North Goa--OngoingSep 2029Not due yet
ForeverLandP52000077814Budruk, Raigarh1,028Nov 2024OngoingJun 2029Not due yet
One Goa P3Survey no. Survey No. 176/1 of Village Carapur, Taluka Bicholim, Goa, Taluka Bicholim, Goa, Bicholim, North Goa--OngoingMar 2029Not due yet
One Goa P2S.NO. 148/0, CARAPUR, Bicholim, North Goa--OngoingMar 2029Not due yet
One Goa P1Survey No. 148/0 , Carapur, Bicholim, North Goa--OngoingMar 2029Not due yet
Gulf of GoaS NO 178/1-A-Q-3 , SANCOALE , South Goa--OngoingAug 2027Not due yet
Foothills of Matheran P - 4P52000046039Near Shilar RIver, Raigarh225Jun 2022CompletedJun 2025Jun 2025
Foothills of Matheran P - 3P52000046022Near Shilar River, Raigarh174Jun 2022CompletedJun 2025Jun 2025
Foothills of Matheran P - 2P52000045546Near Shilar River, Raigarh370May 2022CompletedJun 2025Jun 2025
Foothills of Matheran P - 1P52000045544Near Shilar River, Raigarh317May 2022CompletedJun 2025Jun 2025

How this compares with Palghar

24%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Great Western Mumbai on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Naigaon East3,200+ in Palghar

Builder: HOABL Impactum Land Private Limited

HOABL Impactum Land Private Limited has 8 registrations on MahaRERA, including Foothills of Matheran P - 1 and Foothills of Matheran P - 2. Its filings disclose 16 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if The Great Western Mumbai is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Great Western Mumbai?

The registered promoter entity is HOABL Impactum Land Private Limited, a company as per the filing. Its CIN U70109MH2022PTC374991 and GSTIN 27AAGCI4909R1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Great Western Mumbai?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Great Western Mumbai?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Great Western Mumbai?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Great Western Mumbai?

The professionals named in the filing: Architect: Ajay Wade; Engineer: Rahul Nandgaonkar; Engineer: Pritam Dharmraj Shetye; Engineer: Samir Munj; Chartered Accountant: CA Udal Sarda Mishra; Chartered Accountant: U S Mishra and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Great Western Mumbai?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Great Western Mumbai. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Great Western Mumbai to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.