ELEVIA

By VIDA INFRAHUB LLP

RG-MH-48003 · RERA P51800080902 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 100.00 crore secured on the land, in favour of ICICI Home Finance Company Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
423 of 423Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 178 documents Report an error

ELEVIA is a Others project by VIDA INFRAHUB LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080902 on 4 Aug 2025. Possession is promised by 31 Dec 2031. 0 of the 423 units on this registration are recorded sold or booked, and 0 of 44 construction stages are filed complete.

At a glance

Project

  • NameELEVIA
  • TypeOthers
  • Location
    • BORLA EAST
    • CHEMBUR
    • Borla
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800080902
  • ReraGenie IDRG-MH-48003

Builder

  • NameVIDA INFRAHUB LLP
  • Entity typePartnership

Key dates

this monthRegisteredAug 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings4 building records
  • Documents filed178 files

Current status

0%0 of 423 units booked
3.5%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA191424640286
WING BNA191427027
WING CNA191455055
WING DNA191455055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed676

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots676
Closed/Covered676
BuildingClosed/CoveredTotal
WING A144144
WING B244244
WING C144144
WING D144144

Land and ownership13

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,480 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
Encumbrance on the landDeclared present
Charge in favour ofICICI Home Finance Company Ltd
Secured amountRs 100.00 crore
CERSAI search filedYes
Declared on1 Jun 2026
LandownerVillageDistrict
Firozdin Fatehdin Alias Firozdin Fatehdin MalikChemburMumbai Suburban
Jamila Fakhruddin MalikChemburMumbai Suburban
Zahiruddin Fakhruddin MalikChemburMumbai Suburban
Sana Shahnawaz SayedChemburMumbai Suburban
Mohammed Shabir Munawaruddin MalikChemburMumbai Suburban
Parveen Akhtar ShaikhChemburMumbai Suburban
Jalil SharifChemburMumbai Suburban
Rahila Jalil SharifChemburMumbai Suburban
Rashida Mohammed Ismail MalikChemburMumbai Suburban
Rubina Sher Afzal KhanChemburMumbai Suburban
Famida Asif SayeedChemburMumbai Suburban
Nafisa Razik KhanChemburMumbai Suburban
Samir Zainulabadin MalikChemburMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILATION AUTHORITY
Permissible FSI23766.92
Proposed, not sanctioned11,206 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAHURA CENTRE, 3RD FLOORMAHAKALI CAVES ROAD ANDHERI E MUMBAI MAHARASHTRA 400093
Estimated costRs 102.70 cr
Cost incurredRs 3.64 cr
Work done3.55%
BuildingWingEstimatedIncurred
WING ANARs 23.92 crRs 91.06 lakh
WING BNARs 23.92 crRs 91.06 lakh
WING CNARs 23.92 crRs 91.06 lakh
WING DNARs 23.92 crRs 91.06 lakh
-NARs 7.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR MEHUL VAGHELA
EngineerRajesh tiwari
EngineerDBOT Realty Pvt. Ltd
Chartered AccountantSN KATDARE AND CO
PartnerRole in project
VIDA INFRAHUB LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed178

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 178 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Elevia ARchitect Certificate till 31 03 2026.pdf1 Jun 2026
Withdrawal Update Form 2File: FORM 2 ELEVIA Jan 26 to March 26.pdf1 Jun 2026
Withdrawal Update Form 3File: CA Certificate Form 3 Elevia Jan 26 to Mar 26 (1).pdf1 Jun 2026
Withdrawal Update Form 128 May 2026
Withdrawal Update Form 1File: form 1 architect certificate ELEVIA till Dec 2025.pdf28 May 2026
Withdrawal Update Form 228 May 2026
Withdrawal Update Form 2File: Engineer certificate Elevia Oct 2025 to Dec 2025.pdf28 May 2026
Withdrawal Update Form 328 May 2026
Withdrawal Update Form 3File: CA certificate Form 3 Oct 2025 to Dec 2025 Elevia.pdf28 May 2026
Withdrawal Update Form 1File: Elevia Arch Certificate July 25 to Sept 25 10 10 2025.pdf27 May 2026
Withdrawal Update Form 2File: Elevia Engineer Certificate July 25 to Sept 25.pdf27 May 2026
Withdrawal Update Form 3File: CA Certificate Form 3 June 25 to Sept 25 quarter_11zon.pdf27 May 2026
Other - LegalFile: loi sabari.pdf31 Jul 2025
Other - LegalFile: Declaration_31-07-2025.pdf31 Jul 2025
Other - LegalFile: loi sabari.pdf31 Jul 2025
Other - LegalFile: Declaration_31-07-2025.pdf31 Jul 2025
Other - LegalFile: SDA 275-308.pdf25 Jul 2025
Other - LegalFile: SDA 309-end.pdf25 Jul 2025
Other - LegalFile: 1_SDA POA.pdf25 Jul 2025
Other - LegalFile: 2_SDA POA.pdf25 Jul 2025
Other - LegalFile: SDA 36-104.pdf25 Jul 2025
Other - LegalFile: page-00001_p1-p35.pdf25 Jul 2025
Other - LegalFile: page-00002_p36-p77.pdf25 Jul 2025
Other - LegalFile: page-00003_p78-p120.pdf25 Jul 2025
Other - LegalFile: page-00004_p121-p158.pdf25 Jul 2025
Other - LegalFile: page-00005_p159-p198.pdf25 Jul 2025
Other - LegalFile: page-00006_p199-p240.pdf25 Jul 2025
Other - LegalFile: page-00007_p241-p282.pdf25 Jul 2025
Other - LegalFile: page-00008_p283-p321.pdf25 Jul 2025
Other - LegalFile: page-00009_p322-p340.pdf25 Jul 2025
Other - LegalFile: sabari DA 9117-2020 Index II.PDF25 Jul 2025
Other - LegalFile: Vida Infahub LLP_Declaration on legal heirs.pdf25 Jul 2025
Other - LegalFile: SDA 207-240.pdf25 Jul 2025
Other - LegalFile: 2.pdf25 Jul 2025
Other - LegalFile: 3.pdf25 Jul 2025
Other - LegalFile: 4.pdf25 Jul 2025
Other - LegalFile: SDA 1-35.pdf25 Jul 2025
Other - LegalFile: SDA 105-138.pdf25 Jul 2025
Other - LegalFile: SDA 139-172.pdf25 Jul 2025
Other - LegalFile: SDA 173-206.pdf25 Jul 2025
Other - LegalFile: SDA 241-274.pdf25 Jul 2025
Other - LegalFile: SDA 275-308.pdf25 Jul 2025
Other - LegalFile: SDA 309-end.pdf25 Jul 2025
Other - LegalFile: 1_SDA POA.pdf25 Jul 2025
Other - LegalFile: 2_SDA POA.pdf25 Jul 2025
Other - LegalFile: SDA 36-104.pdf25 Jul 2025
Other - LegalFile: page-00001_p1-p35.pdf25 Jul 2025
Other - LegalFile: page-00002_p36-p77.pdf25 Jul 2025
Other - LegalFile: page-00003_p78-p120.pdf25 Jul 2025
Other - LegalFile: page-00004_p121-p158.pdf25 Jul 2025
Other - LegalFile: page-00005_p159-p198.pdf25 Jul 2025
Other - LegalFile: page-00006_p199-p240.pdf25 Jul 2025
Other - LegalFile: page-00007_p241-p282.pdf25 Jul 2025
Other - LegalFile: page-00008_p283-p321.pdf25 Jul 2025
Other - LegalFile: page-00009_p322-p340.pdf25 Jul 2025
Other - LegalFile: sabari DA 9117-2020 Index II.PDF25 Jul 2025
Other - LegalFile: Vida Infahub LLP_Declaration on legal heirs.pdf25 Jul 2025
Other - LegalFile: SDA 207-240.pdf25 Jul 2025
Other - LegalFile: 2.pdf25 Jul 2025
Other - LegalFile: 3.pdf25 Jul 2025
Other - LegalFile: 4.pdf25 Jul 2025
Other - LegalFile: SDA 1-35.pdf25 Jul 2025
Other - LegalFile: SDA 105-138.pdf25 Jul 2025
Other - LegalFile: SDA 139-172.pdf25 Jul 2025
Other - LegalFile: SDA 173-206.pdf25 Jul 2025
Other - LegalFile: SDA 241-274.pdf25 Jul 2025
Copy of the legal title reportFile: Title Certificate - NS (1)_10-end.pdf21 Jul 2025
Copy of the legal title reportFile: Title Certificate - NS (1)_10-end.pdf21 Jul 2025
Copy of the legal title reportFile: Title Certificate - NS (1)_1-9.pdf11 Jul 2025
Other - FinanceFile: Elevia_ Final Landowners Declaration for no sale.pdf11 Jul 2025
Copy of the legal title reportFile: Title Certificate - NS (1)_1-9.pdf11 Jul 2025
Other - FinanceFile: Elevia_ Final Landowners Declaration for no sale.pdf11 Jul 2025
Other - LegalFile: MCA VIDA INFRAHUB LLP.PDF30 May 2025
Other - LegalFile: MCA VIDA INFRAHUB LLP.PDF30 May 2025
Commencement Certificates / NA Order for plotted developmentFile: declaration merged.pdf30 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: declaration merged.pdf30 Apr 2025
Other - LegalFile: page-00001_p1-p18.pdf11 Apr 2025
Other - LegalFile: page-00002_p19-p30.pdf11 Apr 2025
Other - LegalFile: page-00003_p31-p47.pdf11 Apr 2025
Other - LegalFile: page-00004_p48-p63.pdf11 Apr 2025

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELEVIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHEMBUR6,700+ in Mumbai Suburban

Builder: VIDA INFRAHUB LLP

VIDA INFRAHUB LLP has 1 registration on MahaRERA, including ELEVIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ELEVIA is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELEVIA?

The registered promoter entity is VIDA INFRAHUB LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELEVIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ELEVIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELEVIA?

The professionals named in the filing: Architect: MR MEHUL VAGHELA; Engineer: Rajesh tiwari; Engineer: DBOT Realty Pvt. Ltd; Chartered Accountant: SN KATDARE AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELEVIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELEVIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELEVIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.