ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / PODDAR HARMONY

Registered No litigation declared Others project

PODDAR HARMONY

By PODDAR CREATORS LLP

RG-MH-06471 · RERA P51800053752 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 70%
212 of 262Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

PODDAR HARMONY is a Others project by PODDAR CREATORS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053752 on 28 Nov 2023. Possession is promised by 30 Jun 2028. 50 of the 262 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NamePODDAR HARMONY
  • TypeOthers
  • Location
    • EASTERN EXPRESS HIGHWAY
    • SHRAMJIVI NAGAR
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • RERA no.P51800053752
  • ReraGenie IDRG-MH-06471

Builder

  • NamePODDAR CREATORS LLP
  • Entity typePartnership
  • PartnersYASH DINESH PODDAR, MICHEAL PHILIP GUDINO, SUNITA RAJU SAKAT, ANIL VITTHAL LONDHE

Key dates

this monthRegisteredNov 2023PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2023
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed83 files

Current status

19%50 of 262 units booked
80.2%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA19171570157
WING BNA19171050105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 70%.

WING A61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90
BuildingClosed/CoveredTotal
WING A2222
WING B6868

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,929 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Apr 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilition Authority
Permissible FSI11015.71
Proposed, not sanctioned11,016 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAWAHARBAN COOP HSG SHOP NO 2 OPP KOKILABEN DHIRUBHAI AMBANI HOSPITAL FOUR BUNGALOW ANDHERI WEST MUMBAI 400053
Estimated costRs 84.00 cr
Cost incurredRs 67.34 cr
Work done80.17%
BuildingWingEstimatedIncurred
WING ANARs 42.00 crRs 33.67 cr
WING BNARs 42.00 crRs 33.67 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY ARUN SAWANT
ArchitectARCHITECTURAL CONCEPT
EngineerNILESH DALWANI
Chartered AccountantVISHAL CHAMPAK GALA
Chartered AccountantSandeep Rathi & Associates
Chartered AccountantVISHAL GALA & ASSOCIATES
PartnerRole in project
PODDAR CREATORS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf3 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf3 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf26 Feb 2026
Withdrawal Update Form 1File: Architect Cert.pdf12 Jan 2026
Withdrawal Update Form 1File: Form 1 Rera Certificate 30092025.pdf12 Jan 2026
Withdrawal Update Form 2File: Certificate of Engineer Form 2 (26).pdf12 Jan 2026
Withdrawal Update Form 2File: Form 2-Certificate of Engineer Form.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 Sep 2025 001.pdf12 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (2)_compressed.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificate of Engineer.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3.pdf3 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: FURTHER C C.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert.pdf17 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate DSC.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost and Fund withdrawal Form 3.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificate of Engineer Form 2 (14) DSC.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY - s.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificate of Engineer Form 2 (14).pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificate of Engineer Form 2 (14).pdf20 Nov 2024
Proforma of Agreement for saleFile: Agreement for Sale 1410.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 With DSC_compressed.pdf20 Aug 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE FINANCE.pdf7 Aug 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE FINANCE.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificate of Engineer Form 2 (7).pdf24 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3.pdf24 May 2024
Other - TechnicalFile: Other Technical.pdf21 Nov 2023
Copy of the legal title reportFile: Legal Title Report.pdf3 Nov 2023
Copy of the legal title reportFile: Other Legal declaration.pdf3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sign form 3 18112023.pdf3 Nov 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf3 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf3 Nov 2023
PAN CardFile: PCLLP PAN Card1.pdf9 Oct 2023
Details of encumbrances concerned to FinanceFile: 09102023120911 123456.pdf9 Oct 2023
Details of encumbrances concerned to LegalFile: 09102023120911 123456.pdf9 Oct 2023
Other - LegalFile: SLUM AUTHORITY LOI.pdf6 Oct 2023
Other - LegalFile: Shree Sharmjivi Development Agreement 1.pdf6 Oct 2023
Other - LegalFile: IOA_compressed 1.pdf6 Oct 2023
Layout approvalFile: Plan Approval.pdf22 Aug 2023
Building plan approvalFile: Pg 1 IOD Amended plan.pdf22 Aug 2023
Building plan approvalFile: new Photo0277-01 (1).pdf22 Aug 2023
Building plan approvalFile: Pg3 IOD Amended plan.pdf22 Aug 2023
Building plan approvalFile: Pg4 IOD Amended plan.pdf22 Aug 2023
Building plan approvalFile: Pg5 IOD Amended plan.pdf22 Aug 2023
Building plan approvalFile: Pg6 IOD Amended plan.pdf22 Aug 2023
Building plan approvalFile: Pg7 IOD Amended plan.pdf22 Aug 2023
Building plan approvalFile: Pg8 IOD Amended plan.pdf22 Aug 2023
Building plan approvalFile: Pg9 IOD Amended plan.pdf22 Aug 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE RELATING TO FINANCE AND LEGAL - SRA -PODDAR HARMONY.pdf22 Aug 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE RELATING TO FINANCE AND LEGAL - SRA -PODDAR HARMONY.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan Approval.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg 1 IOD Amended plan.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: new Photo0277-01 (1).pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg3 IOD Amended plan.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg4 IOD Amended plan.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg5 IOD Amended plan.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg6 IOD Amended plan.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg7 IOD Amended plan.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg8 IOD Amended plan.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Pg9 IOD Amended plan.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf14 Aug 2023
Declaration about Commencement CertificateFile: Format D - Declaration about CC.pdf14 Aug 2023
Declaration in FORM BFile: Form - B Affidavit Cum Declaration.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Rera Certificate.pdf14 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Certificate of Engineer Form 2.pdf14 Aug 2023
CERSAI detailsFile: Undertaking for No Cersai Report.pdf14 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organizations.pdf14 Aug 2023

How this compares with Mumbai Suburban

19%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PODDAR HARMONY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHRAMJIVI NAGAR6,700+ in Mumbai Suburban

Builder: PODDAR CREATORS LLP

PODDAR CREATORS LLP has 1 registration on MahaRERA, including PODDAR HARMONY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PODDAR HARMONY is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PODDAR HARMONY?

The registered promoter entity is PODDAR CREATORS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PODDAR HARMONY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PODDAR HARMONY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PODDAR HARMONY?

The professionals named in the filing: Architect: AJAY ARUN SAWANT; Architect: ARCHITECTURAL CONCEPT; Engineer: NILESH DALWANI; Chartered Accountant: VISHAL CHAMPAK GALA; Chartered Accountant: Sandeep Rathi & Associates; Chartered Accountant: VISHAL GALA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PODDAR HARMONY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PODDAR HARMONY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PODDAR HARMONY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.