PODDAR SPRAHA DIAMOND PHASE-I
By Poddar Housing and Development Limited
RG-MH-09990 · RERA P51900002986 · Last updated on MahaRERA portal: 11 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 49 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PODDAR SPRAHA DIAMOND PHASE-I is a Residential / Group Housing project by Poddar Housing and Development Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900002986 on 4 Aug 2017. Possession was promised by 30 Sep 2022 and is now 49 months past that date. The completion date has moved by 9 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NamePODDAR SPRAHA DIAMOND PHASE-I
- TypeResidential / Group Housing
- Location
- Off St. Anthony road
- Subhash Nagar
- Mumbai City
- 400071
- Pincode400071
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900002986
- ReraGenie IDRG-MH-09990
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Aug 2017
- Promised completion30 Sep 2022
- Revised completionRevised to 30 Sep 2022 (originally 30 Dec 2021)
- Buildings2 building records
- Documents filed130 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PODDAR SPRAHA DIAMOND WING A | NA | 19 | 0 | 0 | 0 | 0 |
| PODDAR SPRAHA DIAMOND WING B | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 90%.
PODDAR SPRAHA DIAMOND WING A65%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
PODDAR SPRAHA DIAMOND WING B85%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Progress on shared amenities24
As on 11 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| Indoor Game Cards | Yes | 30% |
| Indoor Game Carom | Yes | 30% |
| Indoor Game Chess | Yes | 30% |
| Indoor Game Table Tennis | Yes | 30% |
| Kids Play Area | Yes | 30% |
| Library | Yes | 30% |
| Roof Top Garden | Yes | 0% |
| Space for Multimedia Activity | Yes | 30% |
| Swimming Pool | Yes | 0% |
Parking filed70
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| PODDAR SPRAHA DIAMOND WING A | 35 | 35 |
| PODDAR SPRAHA DIAMOND WING B | 35 | 35 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SATRE INFRASTRUCTURE PVT LTD | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VISION ARCHITECTS DESIGNER PLANNER |
| Engineer | EPICONS CONSULTANT |
| Partner | Role in project |
|---|---|
| Poddar Housing and Development Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWith refernce to MahaRERA order No:- 14/2020 MahaRERA/Secy/Order/26/2020 we would like to further extend project completion till 31-Mar-2022, considering lockdown and Pandemic due to COVID-19 and consequently impacting the migration of Labour, non-availability of material impacting the supply chain of construction material, which is leading to further delay in completion of the project, since we request you to kindly grant us further three months i.e. upto 31-Mar-2022. Also request to waive the fee for extension due to force majeure in accordance with rule 7 of Maharashtra Real Estate Registra
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397500 | Sushant Chandrakant Gaikwad | Poddar Housing and Development Limited | 26/09/2023 |
| CC12400342 | pooja sharma | Pooja Sharma and Kishan Sharma | 05/10/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Sep 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed130
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar 24.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar 23.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Mar 24.pdf | 11 Feb 2025 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE PODDAR.pdf | 22 Nov 2024 |
| Status of ConveyanceFile: PSD-1 CONVEYANCE STATUS.pdf | 26 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engin Diamond Sept 22.pdf | 28 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Diamond 22-23.pdf | 28 Apr 2023 |
| Certificates of CA (Form 3)File: Final RERA Diamond Sept 22.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PSD Form V 2021-22.pdf | 19 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: PSD Form V 2021-22.pdf | 19 Jan 2023 |
| Certificates of CA (Form 5)File: PSD Form V 2021-22.pdf | 13 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Diamond Engineering June 22.PDF | 13 Oct 2022 |
| Certificates of CA (Form 3)File: RERA June 22 Diamond.pdf | 22 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PSD March 2022 (1).pdf | 8 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PSD June 2022 (1).pdf | 8 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Spraha Diamond Engineering Mar 22.pdf | 8 Aug 2022 |
| Certificates of CA (Form 3)File: RERA PDS Mar 2022.pdf | 3 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Vision (1) (1) (1).pdf | 8 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 2-Mar 2022 (1) (1).PDF | 8 Apr 2022 |
| Certificates of CA (Form 3)File: PSD RERA Dec 21 Certificate (2) (1).pdf | 8 Apr 2022 |
| Details of encumbrancesFile: Encumbrance for RERA Spraha Diamond.pdf | 1 Apr 2022 |
| Declaration in FORM BFile: Form B_Spraha Diamond_Com.pdf | 1 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spraha Diamond Architect Certificate (1).pdf | 5 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0294_220105165033_001.pdf | 5 Jan 2022 |
| Certificates of CA (Form 3)File: PSD RERA Sept 2021.pdf | 5 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VISION Architects Certificate_Jun-2021.pdf | 9 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Diamond Engineers Certificate_Jun-2021.pdf | 9 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Spraha Diamond_Form 2A Quality Jun-21.pdf | 9 Dec 2021 |
| Certificates of CA (Form 3)File: PHDL PSD RERA_Jun-2021_C.pdf | 9 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: FULL CC Wing A and B_reduced.pdf | 8 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 PSD_Compressed.pdf | 28 Sep 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Spraha Diamond Society declaration.pdf | 24 Aug 2021 |
| Certificates of CA (Form 3)File: PSD RERA - Form 3 - Sep-20.pdf | 21 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Chembur Architect Certificate - March 2021 Compressed.pdf | 14 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 ENGINEER'S CERTIFICATE_ CHEMBUR March 2021.pdf | 14 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Spraha Diamond_Form 2A Quality Mar-21.pdf | 14 Jul 2021 |
| Certificates of CA (Form 3)File: 2021 07 13 PG PHDL PSD WING AB RERA MARCH 2021-compressed.pdf | 14 Jul 2021 |
| Building plan approvalFile: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_Letter_C.pdf | 14 May 2021 |
| Building plan approvalFile: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_1_C.pdf | 14 May 2021 |
| Building plan approvalFile: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_2_C.pdf | 14 May 2021 |
| Building plan approvalFile: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_3_C.pdf | 14 May 2021 |
| Building plan approvalFile: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_4_C.pdf | 14 May 2021 |
| Building plan approvalFile: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_5_C.pdf | 14 May 2021 |
| Building Plan Approval (IOD)File: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_Letter_C.pdf | 14 May 2021 |
| Building Plan Approval (IOD)File: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_1_C.pdf | 14 May 2021 |
| Building Plan Approval (IOD)File: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_2_C.pdf | 14 May 2021 |
| Building Plan Approval (IOD)File: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_3_C.pdf | 14 May 2021 |
| Building Plan Approval (IOD)File: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_4_C.pdf | 14 May 2021 |
| Building Plan Approval (IOD)File: Spraha Diamond Sale Wing Plans Approval_26-Apr-21_5_C.pdf | 14 May 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Spraha Diamond CC_A Wing 12 Floor and B Wing Full CC_26-Apr-21.pdf | 14 May 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineer Ceritificate 31-12-20 Spraha Diamond-compressed.pdf | 4 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality certificate - all RERA project - PHDL-1 - PSD.pdf | 4 Mar 2021 |
| Certificates of CA (Form 3)File: PHDL PSD FORM3.pdf | 3 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPRAHA DIAMOND DEC-20 - Archiects Certificate-compressed.pdf | 2 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect PSD.pdf | 4 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PSD.pdf | 4 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PSD.pdf | 4 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: psd - March 20 -2A.pdf | 7 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: psd - June 2020 -2A c.pdf | 7 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PSD-min.pdf | 1 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Spraha Diamond Engineer Ceritificate Jun-20.pdf | 1 Oct 2020 |
| Certificates of CA (Form 3)File: 2020 09 17 PHDL PSD AB RERA JUNE 2020 R DIGI SIGNED.pdf | 1 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spraha Diamond Architect Ceritificate Mar-20_reduce.pdf | 30 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 PSD - March.pdf | 30 Sep 2020 |
| Certificates of CA (Form 3)File: 2020 09 10 PHDL PSD AB RERA MARCH 2020 R DIGI SIGNED.pdf | 30 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificate Sphara Phase 1-min.pdf | 30 Sep 2020 |
| Details of Restarting of Construction work post lockdownFile: PODDAR SPRAHA DIAMOND PHASE - I.pdf | 26 Jun 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -completion Certificate V1.pdf | 4 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Chembur Dec-19.pdf | 4 Mar 2020 |
| Certificates of CA (Form 3)File: PSD Form 3.pdf | 4 Mar 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Spraha Diamond Ph I June-19.pdf | 9 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Spraha Diamond Ph I Sep-19.pdf | 9 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Spraha Diamond Ph I Dec-19.pdf | 9 Jan 2020 |
| Proforma of Allotment letterFile: Draft Sale Agreement_Spraha Diamond_Revised.pdf | 24 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PSD - 30-09-2019.pdf | 18 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Chembur.pdf | 11 Dec 2019 |
| Certificates of CA (Form 3)File: 2019 12 08 PHDL PSD AB RERA FORM 3.pdf | 11 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Chembur Engineer's Certificate June-19.pdf | 3 Oct 2019 |
| Certificates of CA (Form 3)File: 2019 09 23 PHDL PSD WING AB RERA JUNE 2019.pdf | 3 Oct 2019 |
| Certificates of CA (Form 5)File: Spraha Diamond_Form 5_Mar-19.pdf | 20 Sep 2019 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PODDAR RIVIERA PHASE - IP51700023508 | MHARAL, Thane | 720 | Dec 2019 | Ongoing | Sep 2025 | Not delivered |
| PODDAR WONDERCITY PHASE - IIP51700020028 | JOVELI VILLAGE, Thane | - | Mar 2019 | Certificate Signed | Jun 2022 | Not delivered |
| SAMRUDDHI EVERGREENS-PHASE-4B | BADLAPUR | 178 | - | Completed | Mar 2019 | Aug 2018 |
| SAMRUDDHI EVERGREENS-PHASE-4A | BADLAPUR | 160 | - | Completed | Mar 2018 | Mar 2018 |
| PODDAR EVERGREEN PHASE 3 | BADLAPUR | 796 | - | Completed | Dec 2015 | Late, Mar 2016 |
| PODDAR BRIO INTERNATIONAL SCHOOL | BADLAPUR | - | - | Completed | Aug 2015 | Aug 2015 |
| CENTRAL HOSPITAL | BADLAPUR | - | - | Completed | Mar 2015 | Mar 2015 |
| PODDAR EVERGREEN PHASE 2 | BADLAPUR | 672 | - | Completed | Dec 2014 | Dec 2014 |
| SAMRUDDHI COMPLEX | BHIVPURI KARJAT | 1,264 | - | Completed | Apr 2014 | Apr 2014 |
| SAMRUDDHI COMMERCIAL COMPLEX | BHIVPURI KARJAT | 45 | - | Completed | Apr 2014 | Apr 2014 |
| PODDAR EVERGREEN PHASE 1 | BADLAPUR | 516 | - | Completed | Aug 2013 | Aug 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 130 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PODDAR SPRAHA DIAMOND PHASE-I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Subhash Nagar780+ in Mumbai City
Filed coordinates, straight-line distance. 233 registered projects within 2 km.
Hiranandani Maitri Park Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Premiere by Panache
Panache Developers Pvt Ltd.
Sai Shrushti
Shree Sai Realtors
MASS METROPOLIS
GRACE URBAN DEVELOPMENT CORPORATION
ELEVIA
VIDA INFRAHUB LLP
PODDAR HARMONY
PODDAR CREATORS LLP
See every Mumbai City project, with the district possession charts
Builder: Poddar Housing and Development Limited
Poddar Housing and Development Limited has 13 registrations on MahaRERA, including PODDAR SPRAHA DIAMOND PHASE-I and SAMRUDDHI EVERGREENS-PHASE-4A. Its filings disclose 11 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that PODDAR SPRAHA DIAMOND PHASE-I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PODDAR SPRAHA DIAMOND PHASE-I is delayed beyond 30 Sep 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PODDAR SPRAHA DIAMOND PHASE-I?
The registered promoter entity is Poddar Housing and Development Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PODDAR SPRAHA DIAMOND PHASE-I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PODDAR SPRAHA DIAMOND PHASE-I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PODDAR SPRAHA DIAMOND PHASE-I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PODDAR SPRAHA DIAMOND PHASE-I?
The professionals named in the filing: Architect: VISION ARCHITECTS DESIGNER PLANNER; Engineer: EPICONS CONSULTANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PODDAR SPRAHA DIAMOND PHASE-I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback