Home / Browse projects / Thane, Maharashtra / PODDAR RIVIERA PHASE - I

Registration lapsed No litigation declared Residential / Group Housing project

PODDAR RIVIERA PHASE - I

By Poddar Housing and Development Limited

RG-MH-21751 · RERA P51700023508 · Last updated on MahaRERA portal: 28 Apr 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date
  • 9 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
15 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 16%
271 of 720Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

PODDAR RIVIERA PHASE - I is a Residential / Group Housing project by Poddar Housing and Development Limited in Thane, Maharashtra, registered with MahaRERA as P51700023508 on 18 Dec 2019. Possession was promised by 30 Sep 2025 and is now 13 months past that date. 449 of the 720 units on this registration are recorded sold or booked, and 15 of 44 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NamePODDAR RIVIERA PHASE - I
  • TypeResidential / Group Housing
  • Location
    • KALYAN MURBAD ROAD
    • MHARAL
    • Mharal Kh. (N.V)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700023508
  • ReraGenie IDRG-MH-21751

Builder

  • NamePoddar Housing and Development Limited
  • Entity typeCompany
  • ChairpersonDipak Kumar Poddar
  • Managing DirectorRohitashwa Poddar
  • Other registrations12 more →
  • Completed2 of 13
  • No longer live9 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

13 months past promisethis monthRegisteredDec 2019PromisedSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Dec 2019
  • Promised completion30 Sep 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed94 files

Current status

62%449 of 720 units booked

Figures as on 28 Apr 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA26231690169
A2NA26231690169
A3NA26231690169
A4NA26232130213

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 28 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 16%.

A127%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A237%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A337%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A438%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities25

As on 28 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Indoor games Pool, Table tennis, Chess, CaromYes0%
Kids play area, Barbeque areaYes0%
Fishing, Amphitheatre, Outdoor organic farm patchYes0%
Club Gym, Open crècheYes0%
Banquet, Party LawnYes0%
Terrace party area on clubYes0%
Swimming pool Adult pool, Kids pool, JacuzziYes0%
Senior citizens’ corner, Jogging / walking trackYes0%
Open air gym, Giant Jenga, Giant chess play areaYes0%
Multipurpose ground, Tennis court, Cricket pitchYes0%

Parking filed672

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots672
Closed/Covered672
BuildingClosed/CoveredTotal
A1168168
A2168168
A3168168
A4168168

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,808 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI30450.72
Proposed, not sanctioned30,451 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJEHANGIR BUILDING, M G ROAD, FORT MUMBAI 400001

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUB ARCHITECTS
ArchitectARCHITECT HAFEEZ CONTRACTOR
Architectubarchitects
EngineerChetan Kubal
Chartered AccountantV. A. Shimpi & Associates
Chartered AccountantM.S. Bajaj & Co
Chartered AccountantBansal Bansal & Company
Chartered AccountantM. S. Bajaj & Co.
Chartered AccountantV A SHIMPI & ASSOCIATES
PartnerRole in project
Poddar Housing and Development Limited-

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000198830MOHAN P. SHIMPIPODDAR HOUSING AND DEVELOPMENT LTD30/10/2021
CC006000000408217Devidas WadhwaniPODDAR HOUSING AND DEVELOPMENT LIMITED24/11/2023
CC006000000408553Manish Vinodrai MehtaPoddar Housing and Development Ltd.19/12/2023
CC12501089Ajay Chandrashekhar TiwariPoddar Housing and Development Limited01/04/2025
CC12504584REHANA NIJAM JAMADARPoddar Housing and Development Limited23/12/2025
CC12504228BIPIN SINGHPoddar Housing and Development Limited29/11/2025
CC12504710Vikas Abhimanyu AdhavPoddar Housing and Development Limited31/12/2025
CC12600684Charudatta Sudhakar KulkarniPoddar Housing and Development Limited05/02/2026
CC12601910Ajay Chandrashekhar TiwariPoddar Housing and Development Limited31/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-9-22.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-12-22.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-3-23.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera I Dec 21.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engin Riviera I Sept 22.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Riviera PH I 2021-22.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Rivera PH I 22-23.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA Sept 22 Phase I.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Riviera PH I Form V 2021-22.pdf13 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineer Certificate_Riviera Phase-I_June 22.pdf22 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Riviera Phase-I_March 22.pdf22 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Riviera Phase-I_June 22.pdf22 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA June 22 Phase I.pdf22 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH I Mar 22.pdf8 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH I June 22.pdf8 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Riviera 1.pdf3 Aug 2022
Details of encumbrancesFile: Encumbrance for RERA Poddar Riviera Phase-I_SIGNED.pdf18 Jul 2022
Declaration in FORM BFile: Poddar Riviera Phase I Signed BW.pdf18 Jul 2022
Building plan approvalFile: A1 to A4 Floor plans_Com.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: A1 to A4 Floor plans_Com.pdf28 Apr 2022
Proforma of Allotment letterFile: Poddar Riviera-Phase I _Draft Agreement for Sale_Com.pdf28 Apr 2022
OtherFile: Architect Certificate-Mharal - A1 To A4_Com.pdf28 Apr 2022
OtherFile: A4 - R_Floor Plan_Com.pdf28 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH I Architect Dec 21.pdf1 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-12-2021 (1).pdf1 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Riviera PH I Qualtity.pdf1 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA PH I Dec 21.pdf1 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA PH I Dec 21 (1).pdf1 Apr 2022
Building plan approvalFile: Mharal_Collector order for Building permission_FOR RERA UPLOAD.pdf29 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Mharal_Collector order for Building permission_FOR RERA UPLOAD.pdf29 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Mharal_Collector order for Building permission_FOR RERA UPLOAD.pdf29 Mar 2022
Layout approvalFile: Poddar Riviera_Layout_Phase_I_1MB.pdf23 Mar 2022
Copy of Layout Approval (in case of layout)File: Poddar Riviera_Layout_Phase_I_1MB.pdf23 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-09-2021 (1).pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera Phase I.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0284_220104182248_001.pdf5 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0296_220105165119_001.pdf5 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera PH I RERA Sept 21.pdf5 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-06-2021 (1) (1).pdf4 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_PHASE-I.pdf4 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 10 14 PG PHDL RIVIERA RERA JUNE 2021 PHASE I.pdf9 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Rivera I_Compressed.pdf28 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Poddar Riviera - Phase I Society declaration.pdf24 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-03-2021-compressed.pdf14 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form-2_Engineers Certificate_Poddar Riviera - I_Mar-21.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Poddar Riviera Phase_I_Form 2A Quality Mar-21.pdf14 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 07 13 PG PHDL RIVIERA PH I RERA MARCH 2021.pdf14 Jul 2021
Layout approvalFile: Layout Approval.pdf23 Mar 2021
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf23 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera - Phase 1.pdf4 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality certificate - all RERA project - PHDL-9 - Riv 1.pdf4 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHDL Riviera Ph I FORM3.pdf3 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-12-2020-compressed.pdf2 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I.pdf4 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera Ph1.pdf4 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rivera Ph1.pdf4 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVIERA PHASE I SEPT.pdf4 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Riviera PH-I Form 2 A_Certificate_March-20 ending.pdf7 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ph 1.pdf7 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rivera Ph 1.pdf1 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rivera Ph1.pdf1 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2020 09 15 PHDL RIVIERA RERA JUNE 2020 PHASE I DS.pdf1 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Ph I-compressed.pdf30 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rivera Ph I.pdf30 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2020 09 08 PHDL RIVIERA RERA MARCH 2020 PHASE I DS.pdf30 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificate Riveria Phase 1-min.pdf30 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Riviera PH-I Form 2 A_Certificate_March-20 ending.pdf17 Aug 2020
Details of Restarting of Construction work post lockdownFile: PODDAR RIVIERA PHASE - I.pdf26 Jun 2020
Layout approvalFile: Copy of Layout Approval_V1_reduced.pdf13 Apr 2020
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval_V1_reduced.pdf13 Apr 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 v1.pdf9 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PH-1 - RIVIERA.pdf9 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera Phase 1.pdf9 Mar 2020
Proforma of Allotment letterFile: RERA Agreement_Final Execuation_Used for Registration.pdf6 Mar 2020
Proforma of Allotment letterFile: NON PMAY Draft Agreement for Sale Mharal_A1,A2,A3,A4_14-Feb-2020.pdf15 Feb 2020
Building plan approvalFile: 7 Mharal IOA 13-02-2020_REDUCED.pdf13 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: 7 Mharal IOA 13-02-2020_REDUCED.pdf13 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: 9 Mharal CC 13-02-2020_REDUCED.pdf13 Feb 2020
Proforma of Allotment letterFile: NON PMAY Draft Agreement for Sale Mharal_A1,A2,A3,A4_10-Feb-2020.pdf10 Feb 2020
Layout approvalFile: 4 Copy of Layout Approvals_Reduced_with mark.pdf12 Dec 2019

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise1 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PODDAR WONDERCITY PHASE - IIP51700020028JOVELI VILLAGE, Thane-Mar 2019Certificate SignedJun 2022Not delivered
SAMRUDDHI EVERGREENS-PHASE-4BBADLAPUR178-CompletedMar 2019Aug 2018
SAMRUDDHI EVERGREENS-PHASE-4ABADLAPUR160-CompletedMar 2018Mar 2018
PODDAR EVERGREEN PHASE 3BADLAPUR796-CompletedDec 2015Late, Mar 2016
PODDAR BRIO INTERNATIONAL SCHOOLBADLAPUR--CompletedAug 2015Aug 2015
CENTRAL HOSPITALBADLAPUR--CompletedMar 2015Mar 2015
PODDAR EVERGREEN PHASE 2BADLAPUR672-CompletedDec 2014Dec 2014
SAMRUDDHI COMPLEXBHIVPURI KARJAT1,264-CompletedApr 2014Apr 2014
SAMRUDDHI COMMERCIAL COMPLEXBHIVPURI KARJAT45-CompletedApr 2014Apr 2014
PODDAR EVERGREEN PHASE 1BADLAPUR516-CompletedAug 2013Aug 2013

How this compares with Thane

62%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PODDAR RIVIERA PHASE - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MHARAL7,600+ in Thane

2 kmPODDAR RIVIERA PHASE - ICompleted 14Lapsed / revoked 4Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Poddar Housing and Development Limited

Poddar Housing and Development Limited has 13 registrations on MahaRERA, including PODDAR SPRAHA DIAMOND PHASE-I and SAMRUDDHI EVERGREENS-PHASE-4A. Its filings disclose 11 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that PODDAR RIVIERA PHASE - I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PODDAR RIVIERA PHASE - I is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PODDAR RIVIERA PHASE - I?

The registered promoter entity is Poddar Housing and Development Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PODDAR RIVIERA PHASE - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PODDAR RIVIERA PHASE - I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PODDAR RIVIERA PHASE - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PODDAR RIVIERA PHASE - I?

The professionals named in the filing: Architect: UB ARCHITECTS; Architect: ARCHITECT HAFEEZ CONTRACTOR; Architect: ubarchitects; Engineer: Chetan Kubal; Chartered Accountant: V. A. Shimpi & Associates; Chartered Accountant: M.S. Bajaj & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PODDAR RIVIERA PHASE - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PODDAR RIVIERA PHASE - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PODDAR RIVIERA PHASE - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.