Home / Browse projects / Thane, Maharashtra / PODDAR RIVIERA PHASE - I
PODDAR RIVIERA PHASE - I
By Poddar Housing and Development Limited
RG-MH-21751 · RERA P51700023508 · Last updated on MahaRERA portal: 28 Apr 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 13 months past the filed date
- 9 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PODDAR RIVIERA PHASE - I is a Residential / Group Housing project by Poddar Housing and Development Limited in Thane, Maharashtra, registered with MahaRERA as P51700023508 on 18 Dec 2019. Possession was promised by 30 Sep 2025 and is now 13 months past that date. 449 of the 720 units on this registration are recorded sold or booked, and 15 of 44 construction stages are filed complete. 9 complaints are on record with the regulator.
At a glance
Project
- NamePODDAR RIVIERA PHASE - I
- TypeResidential / Group Housing
- Location
- KALYAN MURBAD ROAD
- MHARAL
- Mharal Kh. (N.V)
- Kalyan
- Thane
- 421301
- Pincode421301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700023508
- ReraGenie IDRG-MH-21751
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Dec 2019
- Promised completion30 Sep 2025
- Revised completionNone
- Buildings4 building records
- Documents filed94 files
Current status
Figures as on 28 Apr 2023, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A1 | NA | 26 | 23 | 169 | 0 | 169 |
| A2 | NA | 26 | 23 | 169 | 0 | 169 |
| A3 | NA | 26 | 23 | 169 | 0 | 169 |
| A4 | NA | 26 | 23 | 213 | 0 | 213 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 28 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 16%.
A127%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A237%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 4% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A337%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 12% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A438%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 16% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities25
As on 28 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Indoor games Pool, Table tennis, Chess, Carom | Yes | 0% |
| Kids play area, Barbeque area | Yes | 0% |
| Fishing, Amphitheatre, Outdoor organic farm patch | Yes | 0% |
| Club Gym, Open crèche | Yes | 0% |
| Banquet, Party Lawn | Yes | 0% |
| Terrace party area on club | Yes | 0% |
| Swimming pool Adult pool, Kids pool, Jacuzzi | Yes | 0% |
| Senior citizens’ corner, Jogging / walking track | Yes | 0% |
| Open air gym, Giant Jenga, Giant chess play area | Yes | 0% |
| Multipurpose ground, Tennis court, Cricket pitch | Yes | 0% |
Parking filed672
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A1 | 168 | 168 |
| A2 | 168 | 168 |
| A3 | 168 | 168 |
| A4 | 168 | 168 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UB ARCHITECTS |
| Architect | ARCHITECT HAFEEZ CONTRACTOR |
| Architect | ubarchitects |
| Engineer | Chetan Kubal |
| Chartered Accountant | V. A. Shimpi & Associates |
| Chartered Accountant | M.S. Bajaj & Co |
| Chartered Accountant | Bansal Bansal & Company |
| Chartered Accountant | M. S. Bajaj & Co. |
| Chartered Accountant | V A SHIMPI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Poddar Housing and Development Limited | - |
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000198830 | MOHAN P. SHIMPI | PODDAR HOUSING AND DEVELOPMENT LTD | 30/10/2021 |
| CC006000000408217 | Devidas Wadhwani | PODDAR HOUSING AND DEVELOPMENT LIMITED | 24/11/2023 |
| CC006000000408553 | Manish Vinodrai Mehta | Poddar Housing and Development Ltd. | 19/12/2023 |
| CC12501089 | Ajay Chandrashekhar Tiwari | Poddar Housing and Development Limited | 01/04/2025 |
| CC12504584 | REHANA NIJAM JAMADAR | Poddar Housing and Development Limited | 23/12/2025 |
| CC12504228 | BIPIN SINGH | Poddar Housing and Development Limited | 29/11/2025 |
| CC12504710 | Vikas Abhimanyu Adhav | Poddar Housing and Development Limited | 31/12/2025 |
| CC12600684 | Charudatta Sudhakar Kulkarni | Poddar Housing and Development Limited | 05/02/2026 |
| CC12601910 | Ajay Chandrashekhar Tiwari | Poddar Housing and Development Limited | 31/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-9-22.pdf | 28 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-12-22.pdf | 28 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-3-23.pdf | 28 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera I Dec 21.pdf | 28 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engin Riviera I Sept 22.pdf | 28 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Riviera PH I 2021-22.pdf | 28 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Rivera PH I 22-23.pdf | 28 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA Sept 22 Phase I.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Riviera PH I Form V 2021-22.pdf | 13 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineer Certificate_Riviera Phase-I_June 22.pdf | 22 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Riviera Phase-I_March 22.pdf | 22 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Riviera Phase-I_June 22.pdf | 22 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA June 22 Phase I.pdf | 22 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH I Mar 22.pdf | 8 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH I June 22.pdf | 8 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Riviera 1.pdf | 3 Aug 2022 |
| Details of encumbrancesFile: Encumbrance for RERA Poddar Riviera Phase-I_SIGNED.pdf | 18 Jul 2022 |
| Declaration in FORM BFile: Poddar Riviera Phase I Signed BW.pdf | 18 Jul 2022 |
| Building plan approvalFile: A1 to A4 Floor plans_Com.pdf | 28 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: A1 to A4 Floor plans_Com.pdf | 28 Apr 2022 |
| Proforma of Allotment letterFile: Poddar Riviera-Phase I _Draft Agreement for Sale_Com.pdf | 28 Apr 2022 |
| OtherFile: Architect Certificate-Mharal - A1 To A4_Com.pdf | 28 Apr 2022 |
| OtherFile: A4 - R_Floor Plan_Com.pdf | 28 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH I Architect Dec 21.pdf | 1 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-12-2021 (1).pdf | 1 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Riviera PH I Qualtity.pdf | 1 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA PH I Dec 21.pdf | 1 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA PH I Dec 21 (1).pdf | 1 Apr 2022 |
| Building plan approvalFile: Mharal_Collector order for Building permission_FOR RERA UPLOAD.pdf | 29 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Mharal_Collector order for Building permission_FOR RERA UPLOAD.pdf | 29 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Mharal_Collector order for Building permission_FOR RERA UPLOAD.pdf | 29 Mar 2022 |
| Layout approvalFile: Poddar Riviera_Layout_Phase_I_1MB.pdf | 23 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Poddar Riviera_Layout_Phase_I_1MB.pdf | 23 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-09-2021 (1).pdf | 7 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera Phase I.pdf | 7 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0284_220104182248_001.pdf | 5 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0296_220105165119_001.pdf | 5 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera PH I RERA Sept 21.pdf | 5 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 30-06-2021 (1) (1).pdf | 4 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_PHASE-I.pdf | 4 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 10 14 PG PHDL RIVIERA RERA JUNE 2021 PHASE I.pdf | 9 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Rivera I_Compressed.pdf | 28 Sep 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Poddar Riviera - Phase I Society declaration.pdf | 24 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-03-2021-compressed.pdf | 14 Jul 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form-2_Engineers Certificate_Poddar Riviera - I_Mar-21.pdf | 14 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Poddar Riviera Phase_I_Form 2A Quality Mar-21.pdf | 14 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 07 13 PG PHDL RIVIERA PH I RERA MARCH 2021.pdf | 14 Jul 2021 |
| Layout approvalFile: Layout Approval.pdf | 23 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 23 Mar 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera - Phase 1.pdf | 4 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality certificate - all RERA project - PHDL-9 - Riv 1.pdf | 4 Mar 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHDL Riviera Ph I FORM3.pdf | 3 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 - ARCHITECT'S CERTIFICATE 31-12-2020-compressed.pdf | 2 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I.pdf | 4 Jan 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera Ph1.pdf | 4 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rivera Ph1.pdf | 4 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVIERA PHASE I SEPT.pdf | 4 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Riviera PH-I Form 2 A_Certificate_March-20 ending.pdf | 7 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ph 1.pdf | 7 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rivera Ph 1.pdf | 1 Oct 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rivera Ph1.pdf | 1 Oct 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2020 09 15 PHDL RIVIERA RERA JUNE 2020 PHASE I DS.pdf | 1 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Ph I-compressed.pdf | 30 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rivera Ph I.pdf | 30 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2020 09 08 PHDL RIVIERA RERA MARCH 2020 PHASE I DS.pdf | 30 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificate Riveria Phase 1-min.pdf | 30 Sep 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Riviera PH-I Form 2 A_Certificate_March-20 ending.pdf | 17 Aug 2020 |
| Details of Restarting of Construction work post lockdownFile: PODDAR RIVIERA PHASE - I.pdf | 26 Jun 2020 |
| Layout approvalFile: Copy of Layout Approval_V1_reduced.pdf | 13 Apr 2020 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout Approval_V1_reduced.pdf | 13 Apr 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase I - FORM 1 v1.pdf | 9 Mar 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PH-1 - RIVIERA.pdf | 9 Mar 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera Phase 1.pdf | 9 Mar 2020 |
| Proforma of Allotment letterFile: RERA Agreement_Final Execuation_Used for Registration.pdf | 6 Mar 2020 |
| Proforma of Allotment letterFile: NON PMAY Draft Agreement for Sale Mharal_A1,A2,A3,A4_14-Feb-2020.pdf | 15 Feb 2020 |
| Building plan approvalFile: 7 Mharal IOA 13-02-2020_REDUCED.pdf | 13 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 7 Mharal IOA 13-02-2020_REDUCED.pdf | 13 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 9 Mharal CC 13-02-2020_REDUCED.pdf | 13 Feb 2020 |
| Proforma of Allotment letterFile: NON PMAY Draft Agreement for Sale Mharal_A1,A2,A3,A4_10-Feb-2020.pdf | 10 Feb 2020 |
| Layout approvalFile: 4 Copy of Layout Approvals_Reduced_with mark.pdf | 12 Dec 2019 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PODDAR WONDERCITY PHASE - IIP51700020028 | JOVELI VILLAGE, Thane | - | Mar 2019 | Certificate Signed | Jun 2022 | Not delivered |
| SAMRUDDHI EVERGREENS-PHASE-4B | BADLAPUR | 178 | - | Completed | Mar 2019 | Aug 2018 |
| SAMRUDDHI EVERGREENS-PHASE-4A | BADLAPUR | 160 | - | Completed | Mar 2018 | Mar 2018 |
| PODDAR EVERGREEN PHASE 3 | BADLAPUR | 796 | - | Completed | Dec 2015 | Late, Mar 2016 |
| PODDAR BRIO INTERNATIONAL SCHOOL | BADLAPUR | - | - | Completed | Aug 2015 | Aug 2015 |
| CENTRAL HOSPITAL | BADLAPUR | - | - | Completed | Mar 2015 | Mar 2015 |
| PODDAR EVERGREEN PHASE 2 | BADLAPUR | 672 | - | Completed | Dec 2014 | Dec 2014 |
| SAMRUDDHI COMPLEX | BHIVPURI KARJAT | 1,264 | - | Completed | Apr 2014 | Apr 2014 |
| SAMRUDDHI COMMERCIAL COMPLEX | BHIVPURI KARJAT | 45 | - | Completed | Apr 2014 | Apr 2014 |
| PODDAR EVERGREEN PHASE 1 | BADLAPUR | 516 | - | Completed | Aug 2013 | Aug 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PODDAR RIVIERA PHASE - I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MHARAL7,600+ in Thane
Filed coordinates, straight-line distance. 22 registered projects within 2 km.
Sinhagad by Bhagwati Haware - Wing - B
Bhagwati Haware Properties Supertech
Pratapgad by Bhagwati Haware - Wing - C
Bhagwati Haware Properties Supertech
Rajgad by Bhagwati Haware - Wing - D
Bhagwati Haware Properties Supertech
PODDAR RIVIERA PHASE - III
Poddar Housing and Development Limited
THARWANI PARKGLEN PHASE I
THARWANI REALTORS
SEASONS GREEN
JAI BALAJI SAI REALTORS
See every Thane project, with the district possession charts
Builder: Poddar Housing and Development Limited
Poddar Housing and Development Limited has 13 registrations on MahaRERA, including PODDAR SPRAHA DIAMOND PHASE-I and SAMRUDDHI EVERGREENS-PHASE-4A. Its filings disclose 11 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that PODDAR RIVIERA PHASE - I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PODDAR RIVIERA PHASE - I is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PODDAR RIVIERA PHASE - I?
The registered promoter entity is Poddar Housing and Development Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PODDAR RIVIERA PHASE - I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PODDAR RIVIERA PHASE - I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PODDAR RIVIERA PHASE - I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PODDAR RIVIERA PHASE - I?
The professionals named in the filing: Architect: UB ARCHITECTS; Architect: ARCHITECT HAFEEZ CONTRACTOR; Architect: ubarchitects; Engineer: Chetan Kubal; Chartered Accountant: V. A. Shimpi & Associates; Chartered Accountant: M.S. Bajaj & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PODDAR RIVIERA PHASE - I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback