Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 14 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dynamic Grandeur is a Others project by DYNAMIC REALTY ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100005396 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2024.
At a glance
Project
- NameDynamic Grandeur
- TypeOthers
- Location
- Wadachiwadi Road
- Undri
- Haveli
- Pune
- 411060
- Pincode411060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100005396
- ReraGenie IDRG-MH-12046
Builder
- NameDYNAMIC REALTY ENTERPRISES
- Entity typePartnership
- GSTIN27AALFD8596P1ZA
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSIddharth Rajeev Sonkar, Rajeev Shivnath Sonkar
- Other registrations8 more →
- Completed3 of 9
- Declared earlier projects20 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Aug 2017
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings3 building records
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Essentia - C | NA | 16 | 0 | 0 | 0 | 0 |
| Essentia - D | NA | 17 | 0 | 0 | 0 | 0 |
| Essentia - E | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 13 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
26 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.
Essentia - C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Essentia - D100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Essentia - E55%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
Progress on shared amenities15
As on 13 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 55% |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 15% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 15% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Essentia - C | 20 | 20 |
| Essentia - D | 44 | 44 |
| Essentia - E | 4 | 4 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Chandrakant Mutha | - | Pune |
| Shradha Mutha | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vilas Tarwadi |
| Engineer | Gulab Anandrao Bhilare |
| Partner | Role in project |
|---|---|
| DYNAMIC REALTY ENTERPRISES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Feb 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Feb 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Feb 2023
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Grandeur C,D, E.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Forn 5 2018 - 2019.pdf | 24 Mar 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Grandeur E Building OC.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc grandeur c.pdf | 2 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Wing D OC.pdf | 2 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Essentia C.pdf | 2 Feb 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Essentia D.pdf | 2 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5_FY 2021-22_Dynamic Grandeur CDE.pdf | 3 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -Essentia Enterprises_compressed.pdf | 5 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Granduer CDE-March-20_compressed.pdf | 8 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Granduer CDE-March-21_compressed.pdf | 8 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dynamic Grandeur C D E Bldg Arch Cer.pdf | 17 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gramduer-Engg-Cert-C-D-E_compressed.pdf | 12 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: DRE-Grandeur Disclosure Sold-Unsold booked Inventory-31-03-2021_compressed.pdf | 12 Aug 2021 |
| Certificates of CA (Form 3)File: CA Cert DRE CDE Signed.pdf | 12 Aug 2021 |
| Declaration about Commencement CertificateFile: Essentia CDE CC Declaration.pdf | 8 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Rera Form 5 DRE Grandeur Essencia Signed_compressed.pdf | 31 Mar 2021 |
| OtherFile: DRE Ass Credai Certificate.pdf | 10 Feb 2020 |
| Certificates of CA (Form 5)File: Form 5 Grandeur Essentia.pdf | 30 Sep 2019 |
| Certificates of CA (Form 5)File: RERA CA CERTIFICATES-Essentia.pdf | 29 Sep 2018 |
| Proforma of Allotment letterFile: Grandeur Draft.pdf | 31 Aug 2018 |
| Details of encumbrancesFile: Self Declaration of Mortgage Deed.pdf | 4 Jul 2018 |
| Details of encumbrancesFile: SBI Mortgage Deed-Index II.pdf | 3 Jul 2018 |
| Layout approvalFile: LAYOUT.pdf | 27 Feb 2018 |
| Building plan approvalFile: Essentia E.pdf | 27 Feb 2018 |
| Building plan approvalFile: Essentia E1.pdf | 27 Feb 2018 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 27 Feb 2018 |
| Building Plan Approval (IOD)File: Essentia E.pdf | 27 Feb 2018 |
| Building Plan Approval (IOD)File: Essentia E1.pdf | 27 Feb 2018 |
| Proforma of Allotment letterFile: Final Grandeur Essentia Draft.pdf | 27 Feb 2018 |
| Proforma of Allotment letterFile: RERA Draft 31-10-2017.pdf | 31 Oct 2017 |
| Layout approvalFile: PROJECT LAYOUT -1.pdf | 27 Jul 2017 |
| Layout approvalFile: PROJECT LAYOUT -2.pdf | 27 Jul 2017 |
| Layout approvalFile: PROPOSED LAYOUT OF PROJECT.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -1.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -2.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -3.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -4.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -5.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -6.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -7.pdf | 27 Jul 2017 |
| Building plan approvalFile: Building Plan -8.pdf | 27 Jul 2017 |
| PAN CardFile: PAN _Dyanmic Realty Enterprises.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Search and Tittle Report Final.pdf | 27 Jul 2017 |
| Details of encumbrancesFile: Search and Tittle Report Final.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT -1.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT -2.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: PROPOSED LAYOUT OF PROJECT.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -1.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -2.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -3.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -4.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -5.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -6.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -7.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan -8.pdf | 27 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: Form B Grandeur- final.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Wing CDE.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate of Wing C D E.pdf | 27 Jul 2017 |
| Certificates of CA (Form 3)File: CDE WING CA CERTIFICATE-.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: ALLOMENT LETTER.PDF | 27 Jul 2017 |
| Proforma of Allotment letterFile: ESSENTIA DRAFT.pdf | 27 Jul 2017 |
Promoter's earlier projects18
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Dynamic Grandeur Premium J WingP52100080389 | Taluka Haveli, Pune | 161 | May 2025 | Ongoing | Dec 2031 | Not due yet |
| Dynamic Grandeur Premium IP52100015789 | Undri, Pune | 126 | Mar 2018 | Ongoing | Dec 2031 | Not due yet |
| Dynamic Grandeur Premium HP52100046251 | Undri, Pune | 168 | Jun 2022 | Ongoing | Dec 2029 | Not due yet |
| Dynamic Imperia Plus A Phase 4AP52100017545 | pisoli, Pune | 38 | Aug 2018 | Completed | Jun 2028 | Jun 2025 |
| Dynamic Grandeur Premium L Phase IIP52100046186 | Undri, Pune | 13 | Jun 2022 | Ongoing | Dec 2026 | Not due yet |
| Dynamic Grandeur Premium L Phase IP52100045639 | Undri, Pune | 13 | May 2022 | Completed | Dec 2026 | Dec 2024 |
| Dynamic Grandeur Premium GP52100015682 | Undri, Pune | - | Mar 2018 | Completed | Dec 2026 | Nov 2023 |
| Dynamic Imperia Plus D Phase 2BP52100017126 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2026 | Jun 2024 |
| Dynamic Imperia Plus D Phase 2AP52100017073 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2026 | Nov 2022 |
| Dynamic Imperia Plus B Phase 5BP52100017200 | Pisoli, Pune | 144 | Jul 2018 | Completed | Jun 2026 | Jun 2025 |
| Dynamic Imperia Plus B Phase 5AP52100017094 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2026 | Nov 2022 |
| Dynamic Grandstand II Phase IP52100030570 | KHARADI | - | Sep 2021 | Completed | Dec 2025 | Nov 2022 |
| Dynamic Grandstand IIP52100017087 | Kharadi | - | Jul 2018 | Completed | Dec 2023 | Mar 2021 |
| LINEAP52100002743 | Hadapsar, Pune | - | Aug 2017 | Completed | Jun 2023 | Sep 2019 |
| Dynamic Imperia Plus F Phase 3P52100017142 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2023 | Aug 2019 |
| Dynamic Imperia Plus C Phase 1P52100017070 | Pisoli, Pune | - | Jul 2018 | Completed | Dec 2022 | Nov 2020 |
| Dynamic GrandeurP52100001831 | UNDRI, Pune | - | Jul 2017 | Completed | Dec 2022 | Jun 2021 |
| Dynamic Oasis | Wadachiwadi Road Undri Pune | 1 | - | Completed | Jun 2022 | Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
Keep Dynamic Grandeur on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Undri13,700+ in Pune
Filed coordinates, straight-line distance. 147 registered projects within 2 km.
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: DYNAMIC REALTY ENTERPRISES
DYNAMIC REALTY ENTERPRISES has 9 registrations on MahaRERA, including Dynamic Grandeur and Dynamic Grandeur. Its filings disclose 20 earlier MahaRERA projects: declares 15 of 15 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Dynamic Grandeur is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dynamic Grandeur?
The registered promoter entity is DYNAMIC REALTY ENTERPRISES, a partnership as per the filing. Its GSTIN 27AALFD8596P1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dynamic Grandeur?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dynamic Grandeur?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dynamic Grandeur?
The professionals named in the filing: Architect: Vilas Tarwadi; Engineer: Gulab Anandrao Bhilare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dynamic Grandeur?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback