Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 14 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
26 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Dynamic Grandeur is a Others project by DYNAMIC REALTY ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100005396 on 11 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2024.

At a glance

Project

  • NameDynamic Grandeur
  • TypeOthers
  • Location
    • Wadachiwadi Road
    • Undri
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005396
  • ReraGenie IDRG-MH-12046

Builder

  • NameDYNAMIC REALTY ENTERPRISES
  • Entity typePartnership
  • GSTIN27AALFD8596P1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSIddharth Rajeev Sonkar, Rajeev Shivnath Sonkar
  • Other registrations8 more →
  • Completed3 of 9
  • Declared earlier projects20 →

Key dates

this monthRegisteredAug 2017PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Essentia - CNA160000
Essentia - DNA170000
Essentia - ENA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

Essentia - C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Essentia - D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Essentia - E55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 13 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes30%
Street LightingYes15%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes40%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes15%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68
BuildingClosed/CoveredTotal
Essentia - C2020
Essentia - D4444
Essentia - E44

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,910 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Chandrakant Mutha-Pune
Shradha Mutha-Pune

Approvals and building plan

Permissible FSI20311.54
Proposed, not sanctioned15,969 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS B Road Pune 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Tarwadi
EngineerGulab Anandrao Bhilare
PartnerRole in project
DYNAMIC REALTY ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Feb 2023

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Grandeur C,D, E.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Forn 5 2018 - 2019.pdf24 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Grandeur E Building OC.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc grandeur c.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Wing D OC.pdf2 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Essentia C.pdf2 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Essentia D.pdf2 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5_FY 2021-22_Dynamic Grandeur CDE.pdf3 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 -Essentia Enterprises_compressed.pdf5 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Granduer CDE-March-20_compressed.pdf8 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Granduer CDE-March-21_compressed.pdf8 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dynamic Grandeur C D E Bldg Arch Cer.pdf17 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Gramduer-Engg-Cert-C-D-E_compressed.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: DRE-Grandeur Disclosure Sold-Unsold booked Inventory-31-03-2021_compressed.pdf12 Aug 2021
Certificates of CA (Form 3)File: CA Cert DRE CDE Signed.pdf12 Aug 2021
Declaration about Commencement CertificateFile: Essentia CDE CC Declaration.pdf8 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Rera Form 5 DRE Grandeur Essencia Signed_compressed.pdf31 Mar 2021
OtherFile: DRE Ass Credai Certificate.pdf10 Feb 2020
Certificates of CA (Form 5)File: Form 5 Grandeur Essentia.pdf30 Sep 2019
Certificates of CA (Form 5)File: RERA CA CERTIFICATES-Essentia.pdf29 Sep 2018
Proforma of Allotment letterFile: Grandeur Draft.pdf31 Aug 2018
Details of encumbrancesFile: Self Declaration of Mortgage Deed.pdf4 Jul 2018
Details of encumbrancesFile: SBI Mortgage Deed-Index II.pdf3 Jul 2018
Layout approvalFile: LAYOUT.pdf27 Feb 2018
Building plan approvalFile: Essentia E.pdf27 Feb 2018
Building plan approvalFile: Essentia E1.pdf27 Feb 2018
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf27 Feb 2018
Building Plan Approval (IOD)File: Essentia E.pdf27 Feb 2018
Building Plan Approval (IOD)File: Essentia E1.pdf27 Feb 2018
Proforma of Allotment letterFile: Final Grandeur Essentia Draft.pdf27 Feb 2018
Proforma of Allotment letterFile: RERA Draft 31-10-2017.pdf31 Oct 2017
Layout approvalFile: PROJECT LAYOUT -1.pdf27 Jul 2017
Layout approvalFile: PROJECT LAYOUT -2.pdf27 Jul 2017
Layout approvalFile: PROPOSED LAYOUT OF PROJECT.pdf27 Jul 2017
Building plan approvalFile: Building Plan -1.pdf27 Jul 2017
Building plan approvalFile: Building Plan -2.pdf27 Jul 2017
Building plan approvalFile: Building Plan -3.pdf27 Jul 2017
Building plan approvalFile: Building Plan -4.pdf27 Jul 2017
Building plan approvalFile: Building Plan -5.pdf27 Jul 2017
Building plan approvalFile: Building Plan -6.pdf27 Jul 2017
Building plan approvalFile: Building Plan -7.pdf27 Jul 2017
Building plan approvalFile: Building Plan -8.pdf27 Jul 2017
PAN CardFile: PAN _Dyanmic Realty Enterprises.pdf27 Jul 2017
Copy of the legal title reportFile: Search and Tittle Report Final.pdf27 Jul 2017
Details of encumbrancesFile: Search and Tittle Report Final.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT -1.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT -2.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: PROPOSED LAYOUT OF PROJECT.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -1.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -2.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -3.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -4.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -5.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -6.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -7.pdf27 Jul 2017
Building Plan Approval (IOD)File: Building Plan -8.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf27 Jul 2017
Declaration in FORM BFile: Form B Grandeur- final.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Wing CDE.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate of Wing C D E.pdf27 Jul 2017
Certificates of CA (Form 3)File: CDE WING CA CERTIFICATE-.pdf27 Jul 2017
Proforma of Allotment letterFile: ALLOMENT LETTER.PDF27 Jul 2017
Proforma of Allotment letterFile: ESSENTIA DRAFT.pdf27 Jul 2017

Promoter's earlier projects18

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

14 delivered on promise4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Dynamic Grandeur Premium J WingP52100080389Taluka Haveli, Pune161May 2025OngoingDec 2031Not due yet
Dynamic Grandeur Premium IP52100015789Undri, Pune126Mar 2018OngoingDec 2031Not due yet
Dynamic Grandeur Premium HP52100046251Undri, Pune168Jun 2022OngoingDec 2029Not due yet
Dynamic Imperia Plus A Phase 4AP52100017545pisoli, Pune38Aug 2018CompletedJun 2028Jun 2025
Dynamic Grandeur Premium L Phase IIP52100046186Undri, Pune13Jun 2022OngoingDec 2026Not due yet
Dynamic Grandeur Premium L Phase IP52100045639Undri, Pune13May 2022CompletedDec 2026Dec 2024
Dynamic Grandeur Premium GP52100015682Undri, Pune-Mar 2018CompletedDec 2026Nov 2023
Dynamic Imperia Plus D Phase 2BP52100017126Pisoli, Pune-Jul 2018CompletedJun 2026Jun 2024
Dynamic Imperia Plus D Phase 2AP52100017073Pisoli, Pune-Jul 2018CompletedJun 2026Nov 2022
Dynamic Imperia Plus B Phase 5BP52100017200Pisoli, Pune144Jul 2018CompletedJun 2026Jun 2025
Dynamic Imperia Plus B Phase 5AP52100017094Pisoli, Pune-Jul 2018CompletedJun 2026Nov 2022
Dynamic Grandstand II Phase IP52100030570KHARADI-Sep 2021CompletedDec 2025Nov 2022
Dynamic Grandstand IIP52100017087Kharadi-Jul 2018CompletedDec 2023Mar 2021
LINEAP52100002743Hadapsar, Pune-Aug 2017CompletedJun 2023Sep 2019
Dynamic Imperia Plus F Phase 3P52100017142Pisoli, Pune-Jul 2018CompletedJun 2023Aug 2019
Dynamic Imperia Plus C Phase 1P52100017070Pisoli, Pune-Jul 2018CompletedDec 2022Nov 2020
Dynamic GrandeurP52100001831UNDRI, Pune-Jul 2017CompletedDec 2022Jun 2021
Dynamic OasisWadachiwadi Road Undri Pune1-CompletedJun 2022Jun 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dynamic Grandeur on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Undri13,700+ in Pune

2 kmDynamic GrandeurCompleted 72Lapsed / revoked 26Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: DYNAMIC REALTY ENTERPRISES

DYNAMIC REALTY ENTERPRISES has 9 registrations on MahaRERA, including Dynamic Grandeur and Dynamic Grandeur. Its filings disclose 20 earlier MahaRERA projects: declares 15 of 15 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dynamic Grandeur is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dynamic Grandeur?

The registered promoter entity is DYNAMIC REALTY ENTERPRISES, a partnership as per the filing. Its GSTIN 27AALFD8596P1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dynamic Grandeur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dynamic Grandeur?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dynamic Grandeur?

The professionals named in the filing: Architect: Vilas Tarwadi; Engineer: Gulab Anandrao Bhilare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dynamic Grandeur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dynamic Grandeur. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dynamic Grandeur to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.