Registered No litigation declared Residential / Group Housing project

Dynamic Grandeur Premium H

By DYNAMIC REALTY ENTERPRISES

RG-MH-99825 · RERA P52100046251 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of Capri Global Capital Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 17 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 95%
53 of 168Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Dynamic Grandeur Premium H is a Residential / Group Housing project by DYNAMIC REALTY ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100046251 on 20 Jun 2022. Possession is promised by 31 Dec 2029. 115 of the 168 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameDynamic Grandeur Premium H
  • TypeResidential / Group Housing
  • Location
    • Undri Chowk
    • Undri
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • RERA no.P52100046251
  • ReraGenie IDRG-MH-99825

Builder

  • NameDYNAMIC REALTY ENTERPRISES
  • Entity typePartnership
  • GSTIN27AALFD8596P1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSIddharth Rajeev Sonkar, Rajeev Shivnath Sonkar
  • Other registrations8 more →
  • Completed3 of 9
  • Declared earlier projects20 →

Key dates

this monthRegisteredJun 2022PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

68%115 of 168 units booked
49.7%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dynamic Grandeur Premium HNA24211680168

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Dynamic Grandeur Premium H: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes35%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes80%
Street LightingYes60%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed504

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots504
Closed/Covered84
Open Space420

Land and ownership15

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,260 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
Encumbrance on the landDeclared present
Charge in favour ofCapri Global Capital Ltd
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on16 Jul 2025
LandownerVillageDistrict
Uttam Laxman GhuleWadachiwadiPune
Kasubai Uttam GhuleWadachiwadiPune
Dadasaheb Uttam GhuleWadachiwadiPune
Sheetal Dadasaheb GhuleWadachiwadiPune
Ganesh Uttam GhuleWadachiwadiPune
Urmila Ganesh GhuleWadachiwadiPune
Purushottam Premji PatelMarket YardPune
Pravin Jivrajbhai PatelMarket YardPune
Leelaben JaverbhaiMarket YardPune
Javerbhai Premji PatelMarket YardPune
Dinesh Jivrajbhai PatelMarket YardPune
Gulab Kaluram GhuleHadapsarPune
Meena Gulab GhuleHadapsarPune
Dattatraya Kaluram GhuleWadachiwadiPune
Anita Dattatraya GhuleWadachiwadiPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI15766.8
Proposed, not sanctioned15,767 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 5, Undri City Centre, Undri, Pune - 411060
Estimated costRs 51.19 cr
Cost incurredRs 25.43 cr
Work done49.68%
BuildingWingEstimatedIncurred
Dynamic Grandeur Premium HNARs 45.27 crRs 25.43 cr
-NARs 5.92 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Tarwadi
EngineerGajanan Wankhede
EngineerRam Ghodake
Chartered AccountantRege and Thakkar
Chartered AccountantG N Mantri and Associates
Chartered AccountantANJK & CO LLP
PartnerRole in project
DYNAMIC REALTY ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Premium H_Archi Cert_March 2026.pdf20 May 2026
Withdrawal Update Form 2File: Form 2_Premium H_Engi Cert_March 2026.pdf20 May 2026
Withdrawal Update Form 3File: Form 3_Premium H_CA Cert_March 2026.pdf20 May 2026
Withdrawal Update Form 1File: Premium H_Form 1_Archi Cert - Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Premium H_Form 2_Engi Cert - Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 3File: Premium H_Form 3_CA Cert - Dec 2025.pdf2 Feb 2026
Building plan approvalFile: Parking plan for Premium.pdf23 Dec 2025
Building plan approvalFile: Parking plan for Premium H J and I Wing.pdf23 Dec 2025
Withdrawal Update Form 1File: Form 1_Premium H_17th dec.pdf20 Dec 2025
Withdrawal Update Form 2File: Form 2_Premium H.pdf20 Dec 2025
Withdrawal Update Form 3File: Form 3_Premium H_11zon.pdf20 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_Premium H_FY 2024-25 - signed.pdf8 Dec 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - Sept 2025.pdf10 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Sept 2025 - Sign.pdf10 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate - September 2025 - Sign.pdf10 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - June 2025.pdf22 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf22 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate - June 2025 - Sign_Compressed.pdf22 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf22 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Cert_Premium I_March 2025.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Premium H_March 2025 - Signed.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure_Premium H_March 2025.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate December 2024.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate December 2024_Compressed.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - December 2024_Signed.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Inventory_Grandeur Premium H.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5_FY 2023-24_Dynamic Grandeur Premium H - Sign.pdf16 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5_FY 2023-24_Dynamic Grandeur Premium H - Sign.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - Sept 2024- Sign.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf25 Oct 2024
Layout approvalFile: Layout Approval.pdf9 Oct 2024
Building plan approvalFile: 3.pdf9 Oct 2024
Building plan approvalFile: 32.pdf9 Oct 2024
Building plan approvalFile: 33.pdf9 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Oct 2024
Building Plan Approval (IOD)File: 3.pdf9 Oct 2024
Building Plan Approval (IOD)File: 32.pdf9 Oct 2024
Building Plan Approval (IOD)File: 33.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate - June 2024 - Sign.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration format A on Seperate bank account.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf6 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-2023.pdf6 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2023-2024.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Format Signed_11zon.pdf6 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration format A on Seperate bank account.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Premium H_Form 1 -Architect Certificate-12-04-2024.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Premium H engineers certificate.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Premium H inventory.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Premium H form 3 Signed_compressed.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Premium H.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -Rera Dynamic Realty Enterprises -Premium H.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: premium H Architect.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Premium H.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Premium H.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Premium H_compressed.pdf12 Oct 2023
Proforma of Allotment letterFile: Final H building Premium I Unit draft.pdf12 Sep 2023
Details of encumbrances concerned to FinanceFile: Mortgage deed H.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: Mortgage deed H.pdf10 Jan 2023
Copy of the legal title reportFile: 220613092843_0001_11zon.pdf13 Jun 2022
Copy of the legal title reportFile: T2.pdf13 Jun 2022
Layout approvalFile: Layout_compressed (1).pdf2 Jun 2022
Copy of Layout Approval (in case of layout)File: Layout_compressed (1).pdf2 Jun 2022
Proforma of Allotment letterFile: H building Premium I Unit draft.pdf2 Jun 2022
Details of encumbrancesFile: NEL .pdf1 Jun 2022
Declaration in FORM BFile: B Form H Building(1).pdf1 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_compressed.pdf1 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf31 May 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf31 May 2022

Promoter's earlier projects20

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

17 delivered on promise3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Dynamic Grandeur Premium J WingP52100080389Taluka Haveli, Pune161May 2025OngoingDec 2031Not due yet
Dynamic Grandeur Premium IP52100015789Undri, Pune126Mar 2018OngoingDec 2031Not due yet
Dynamic Imperia Plus A Phase 4AP52100017545pisoli, Pune38Aug 2018CompletedJun 2028Jun 2025
Dynamic Grandeur Premium L Phase IIP52100046186Undri, Pune13Jun 2022OngoingDec 2026Not due yet
Dynamic Grandeur Premium L Phase IP52100045639Undri, Pune13May 2022CompletedDec 2026Dec 2024
Dynamic Grandeur Premium GP52100015682Undri, Pune-Mar 2018CompletedDec 2026Nov 2023
Dynamic Imperia Plus D Phase 2BP52100017126Pisoli, Pune-Jul 2018CompletedJun 2026Jun 2024
Dynamic Imperia Plus D Phase 2AP52100017073Pisoli, Pune-Jul 2018CompletedJun 2026Nov 2022
Dynamic Imperia Plus B Phase 5BP52100017200Pisoli, Pune144Jul 2018CompletedJun 2026Jun 2025
Dynamic Imperia Plus B Phase 5AP52100017094Pisoli, Pune-Jul 2018CompletedJun 2026Nov 2022
Dynamic Grandstand II Phase IP52100030570KHARADI-Sep 2021CompletedDec 2025Nov 2022
Dynamic GrandeurP52100005396Undri, Pune-Aug 2017CompletedJun 2024Jun 2021
Dynamic GrandeurP52100005396Undri, Pune-Aug 2017CompletedJun 2024Jun 2021
Dynamic GrandeurP52100005396Undri, Pune-Aug 2017CompletedJun 2024Nov 2023
Dynamic Grandstand IIP52100017087Kharadi-Jul 2018CompletedDec 2023Mar 2021
LINEAP52100002743Hadapsar, Pune-Aug 2017CompletedJun 2023Sep 2019
Dynamic Imperia Plus F Phase 3P52100017142Pisoli, Pune-Jul 2018CompletedJun 2023Aug 2019
Dynamic Imperia Plus C Phase 1P52100017070Pisoli, Pune-Jul 2018CompletedDec 2022Nov 2020
Dynamic GrandeurP52100001831UNDRI, Pune-Jul 2017CompletedDec 2022Jun 2021
Dynamic OasisWadachiwadi Road Undri Pune1-CompletedJun 2022Jun 2022

How this compares with Pune

68%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dynamic Grandeur Premium H on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Undri13,700+ in Pune

Builder: DYNAMIC REALTY ENTERPRISES

DYNAMIC REALTY ENTERPRISES has 9 registrations on MahaRERA, including Dynamic Grandeur and Dynamic Grandeur. Its filings disclose 20 earlier MahaRERA projects: declares 15 of 15 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dynamic Grandeur Premium H is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dynamic Grandeur Premium H?

The registered promoter entity is DYNAMIC REALTY ENTERPRISES, a partnership as per the filing. Its GSTIN 27AALFD8596P1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dynamic Grandeur Premium H?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dynamic Grandeur Premium H?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dynamic Grandeur Premium H?

The professionals named in the filing: Architect: Vilas Tarwadi; Engineer: Gajanan Wankhede; Engineer: Ram Ghodake; Chartered Accountant: Rege and Thakkar; Chartered Accountant: G N Mantri and Associates; Chartered Accountant: ANJK & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dynamic Grandeur Premium H?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dynamic Grandeur Premium H. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dynamic Grandeur Premium H to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.