Dynamic Grandeur Premium J Wing
RG-MH-32655 · RERA P52100080389 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 17 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dynamic Grandeur Premium J Wing is a Residential / Group Housing project by DYNAMIC REALTY ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100080389 on 29 May 2025. Possession is promised by 31 Dec 2031. 35 of the 161 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameDynamic Grandeur Premium J Wing
- TypeResidential / Group Housing
- Location
- Undri
- Taluka Haveli
- Haveli
- Pune
- 411060
- Pincode411060
- RERA no.P52100080389
- ReraGenie IDRG-MH-32655
Builder
- NameDYNAMIC REALTY ENTERPRISES
- Entity typePartnership
- GSTIN27AALFD8596P1ZA
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersSIddharth Rajeev Sonkar, Rajeev Shivnath Sonkar
- Other registrations8 more →
- Completed3 of 9
- Declared earlier projects20 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2025
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| J Wing | NA | 25 | 21 | 161 | 0 | 161 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 15%.
J Wing: 47% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 5% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 60% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed254
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership19
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Pravin Jivrajbhai Patel | Market Yard | Pune |
| Purushottam Premji Patel | Market Yard | Pune |
| Leelaben Javerbhai Patel | Market Yard | Pune |
| Javherbhai Premji Patel | Market Yard | Pune |
| Dinesh Jivrajbaji Patel | Market Yard | Pune |
| Gulab Ghule | UNDRI | Pune |
| Meena Ghule | UNDRI | Pune |
| Dattatray Kaluram Ghule | UNDRI | Pune |
| Anita Dattatray Ghule | UNDRI | Pune |
| Uttam Ghule | UNDRI | Pune |
| Kasubai Uttam Ghule | UNDRI | Pune |
| Dadasaheb Uttam Ghule | UNDRI | Pune |
| Sheetal Dadasaheb Ghule | UNDRI | Pune |
| Ganesh Uttam Ghule | UNDRI | Pune |
| Urmila Ganesh Ghule | UNDRI | Pune |
| Devanand Sopanrao Ghule | Market Yard | Pune |
| Vandana Devanand Ghule | Market Yard | Pune |
| Rahul Devanand Ghule | Market Yard | Pune |
| Viraj Devanand Ghule | Market Yard | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| J Wing | NA | Rs 22.67 cr | Rs 10.56 cr |
| - | NA | Rs 2.45 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vilas Tarwadi |
| Engineer | Ram Mahadev Ghodake |
| Chartered Accountant | Rege & Thakkar |
| Chartered Accountant | A N J K & Co LLP |
| Chartered Accountant | G N Mantri and Associates |
| Partner | Role in project |
|---|---|
| DYNAMIC REALTY ENTERPRISES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Oct 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2031
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Premium J_Archi Cert_March 2026.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2_Premium J_Engi Cert_March 2026.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3_Premium J_CA Cert_March 2026.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Premium J_Form 1_Archi Cert - Dec 2025.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: Premium J_Form 2_Engi Cert - Dec 2025.pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: Premium J_Form 3_CA Cert - Dec 2025.pdf | 2 Feb 2026 |
| Building plan approvalFile: Parking plan for Premium H J and I Wing.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate - September 2025.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate - September 2025.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate_Dynamic Grandeur Premium J Wing - Signed.pdf | 13 Nov 2025 |
| Layout approvalFile: Layout Approval.pdf | 28 Oct 2025 |
| Building plan approvalFile: Basement & Parking Level.pdf | 28 Oct 2025 |
| Building plan approvalFile: Building Plan J Wing - 41.pdf | 28 Oct 2025 |
| Building plan approvalFile: Building Plan J Wing - 42.pdf | 28 Oct 2025 |
| Building plan approvalFile: Building Plan J Wing - 43.pdf | 28 Oct 2025 |
| Layout approvalFile: Layout Approval.pdf | 24 Oct 2025 |
| Building plan approvalFile: Basement & Parking Level.pdf | 24 Oct 2025 |
| Building plan approvalFile: Building Plan J Wing - 41.pdf | 24 Oct 2025 |
| Building plan approvalFile: Building Plan J Wing - 42.pdf | 24 Oct 2025 |
| Building plan approvalFile: Building Plan J Wing - 43.pdf | 24 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate - September 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate - September 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate - September 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate J Wing - June 2025.pdf | 22 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate - J wing - June 2025.pdf | 22 Jul 2025 |
| Withdrawal Update Form 3File: CA Certificate_Dynamic Grandeur Premium J Wing - June 2025_compressed.pdf | 22 Jul 2025 |
| Other - TechnicalFile: 2 Other - Legal.pdf | 27 May 2025 |
| Other - TechnicalFile: 2 Commencement Certificates _ NA Order for plotted development.pdf | 27 May 2025 |
| Other - TechnicalFile: RERA ACK.pdf | 27 May 2025 |
| Other - TechnicalFile: 4 Other - Legal.pdf | 27 May 2025 |
| Other - TechnicalFile: 3 Other - Legal.pdf | 27 May 2025 |
| Other - TechnicalFile: 1 Other - Legal.pdf | 27 May 2025 |
| Other - LegalFile: DD_Copy.pdf | 29 Apr 2025 |
| Other - LegalFile: 2 Other - Legal.pdf | 29 Apr 2025 |
| Other - FinanceFile: POA Chandrakant Mutha 54(P)_11zon.pdf | 28 Apr 2025 |
| Other - FinanceFile: POA_Devanand Ghule_53_4_2_11zon.pdf | 28 Apr 2025 |
| Other - FinanceFile: POA Gulab Ghule 44 R 53_1_11zon.pdf | 28 Apr 2025 |
| Other - FinanceFile: POA Pur Patel 1 H 70 R 53_2 53_3_11zon.pdf | 28 Apr 2025 |
| Other - FinanceFile: POA Uttam Ghule 44 R 53_1_11zon.pdf | 28 Apr 2025 |
| Other - LegalFile: Promoter_Land Area Declaration.pdf | 24 Apr 2025 |
| Other - LegalFile: DD_Letter.pdf | 24 Apr 2025 |
| Other - FinanceFile: End Use Certificate Signed.pdf | 24 Apr 2025 |
| Building plan approvalFile: 3-43-compressed.pdf | 4 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Email Screenshot - Premium J_CC.pdf | 4 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-43-compressed.pdf | 4 Apr 2025 |
| Other - LegalFile: Architect_Land area declaration.pdf | 4 Apr 2025 |
| CERSAI detailsFile: Asset Based Search.pdf | 4 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: End Use Certificate Signed.pdf | 4 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration Format A for Promoter.pdf | 4 Apr 2025 |
| Other - TechnicalFile: Declaration cum Undertaking for Multiple registration for same project.pdf | 4 Apr 2025 |
| Other - TechnicalFile: DP Remarks Declaration.pdf | 4 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report_1242025_11zon.pdf | 4 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: End Use Certificate Signed.pdf | 4 Apr 2025 |
| Layout approvalFile: 1-43-compressed - Marked.pdf | 3 Apr 2025 |
| Building plan approvalFile: 42-43-compressed - Marked.pdf | 3 Apr 2025 |
| Building plan approvalFile: 43-43-compressed - Marked.pdf | 3 Apr 2025 |
| Copy of the legal title reportFile: Search Title Report_compressed.pdf | 3 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: 1-43-compressed - Marked.pdf | 3 Apr 2025 |
| Proforma of Allotment letterFile: Allotment Letter Dyanamic Grandeur Premium J.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 43-43-compressed - Marked.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 42-43-compressed - Marked.pdf | 3 Apr 2025 |
| Proforma of Agreement for saleFile: 12042025_Articles of Agreement Dynamic Grandeur Premium J.pdf | 3 Apr 2025 |
| Declaration in FORM BFile: Form B - Declaration by Promoter_compressed.pdf | 30 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Cert_Premium J_Registration_compressed.pdf | 30 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert_Cert_Premium J_Registration.pdf | 30 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report on Allotment Letter.pdf | 30 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Bank declaration Dynamic Grandeur Premium J form b.pdf | 30 Mar 2025 |
| PAN CardFile: PAN _Dyanmic Realty Enterprises.pdf | 25 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert_Premium J wing.pdf | 25 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_J wing_2025.pdf | 25 Mar 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 25 Mar 2025 |
| CERSAI detailsFile: Cersai Declaration.pdf | 25 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf | 25 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration relating to Other Real Estate - RSS.pdf | 25 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration relating to Other Real Estate - SRS.pdf | 25 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project.pdf | 25 Mar 2025 |
Promoter's earlier projects20
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Dynamic Grandeur Premium IP52100015789 | Undri, Pune | 126 | Mar 2018 | Ongoing | Dec 2031 | Not due yet |
| Dynamic Grandeur Premium HP52100046251 | Undri, Pune | 168 | Jun 2022 | Ongoing | Dec 2029 | Not due yet |
| Dynamic Imperia Plus A Phase 4AP52100017545 | pisoli, Pune | 38 | Aug 2018 | Completed | Jun 2028 | Jun 2025 |
| Dynamic Grandeur Premium L Phase IIP52100046186 | Undri, Pune | 13 | Jun 2022 | Ongoing | Dec 2026 | Not due yet |
| Dynamic Grandeur Premium L Phase IP52100045639 | Undri, Pune | 13 | May 2022 | Completed | Dec 2026 | Dec 2024 |
| Dynamic Grandeur Premium GP52100015682 | Undri, Pune | - | Mar 2018 | Completed | Dec 2026 | Nov 2023 |
| Dynamic Imperia Plus D Phase 2BP52100017126 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2026 | Jun 2024 |
| Dynamic Imperia Plus D Phase 2AP52100017073 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2026 | Nov 2022 |
| Dynamic Imperia Plus B Phase 5BP52100017200 | Pisoli, Pune | 144 | Jul 2018 | Completed | Jun 2026 | Jun 2025 |
| Dynamic Imperia Plus B Phase 5AP52100017094 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2026 | Nov 2022 |
| Dynamic Grandstand II Phase IP52100030570 | KHARADI | - | Sep 2021 | Completed | Dec 2025 | Nov 2022 |
| Dynamic GrandeurP52100005396 | Undri, Pune | - | Aug 2017 | Completed | Jun 2024 | Jun 2021 |
| Dynamic GrandeurP52100005396 | Undri, Pune | - | Aug 2017 | Completed | Jun 2024 | Jun 2021 |
| Dynamic GrandeurP52100005396 | Undri, Pune | - | Aug 2017 | Completed | Jun 2024 | Nov 2023 |
| Dynamic Grandstand IIP52100017087 | Kharadi | - | Jul 2018 | Completed | Dec 2023 | Mar 2021 |
| LINEAP52100002743 | Hadapsar, Pune | - | Aug 2017 | Completed | Jun 2023 | Sep 2019 |
| Dynamic Imperia Plus F Phase 3P52100017142 | Pisoli, Pune | - | Jul 2018 | Completed | Jun 2023 | Aug 2019 |
| Dynamic Imperia Plus C Phase 1P52100017070 | Pisoli, Pune | - | Jul 2018 | Completed | Dec 2022 | Nov 2020 |
| Dynamic GrandeurP52100001831 | UNDRI, Pune | - | Jul 2017 | Completed | Dec 2022 | Jun 2021 |
| Dynamic Oasis | Wadachiwadi Road Undri Pune | 1 | - | Completed | Jun 2022 | Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dynamic Grandeur Premium J Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Taluka Haveli13,700+ in Pune
THE SPECTRUM
SHRIRAM PROPERTIES LIMITED
GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N
GOEL GANGA INDIA PVT LTD
NYATI ESTEBAN II
NYATI REALTORS LLP
Lodha Pune NIBM Project
Lodha Developers Limited
KHUSH VISTA
Elated Housing LLP
The Atrium
Arhumashtika Life Spaces
Builder: DYNAMIC REALTY ENTERPRISES
DYNAMIC REALTY ENTERPRISES has 9 registrations on MahaRERA, including Dynamic Grandeur and Dynamic Grandeur. Its filings disclose 20 earlier MahaRERA projects: declares 15 of 15 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Dynamic Grandeur Premium J Wing is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dynamic Grandeur Premium J Wing?
The registered promoter entity is DYNAMIC REALTY ENTERPRISES, a partnership as per the filing. Its GSTIN 27AALFD8596P1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dynamic Grandeur Premium J Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Dynamic Grandeur Premium J Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dynamic Grandeur Premium J Wing?
The professionals named in the filing: Architect: Vilas Tarwadi; Engineer: Ram Mahadev Ghodake; Chartered Accountant: Rege & Thakkar; Chartered Accountant: A N J K & Co LLP; Chartered Accountant: G N Mantri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dynamic Grandeur Premium J Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback