Registered No litigation declared Commercial project

Dynamic Imperia Plus A Phase 4A

By Vedant Dynamic Associates

RG-MH-66880 · RERA P52100017545 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
20 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Dynamic Imperia Plus A Phase 4A is a Commercial project by Vedant Dynamic Associates in Pune, Maharashtra, registered with MahaRERA as P52100017545 on 24 Aug 2018. Possession is promised by 30 Jun 2028. 18 of the 38 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameDynamic Imperia Plus A Phase 4A
  • TypeCommercial
  • Location
    • Behind Dharmawat Petrol pump
    • pisoli
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • RERA no.P52100017545
  • ReraGenie IDRG-MH-66880

Builder

  • NameVedant Dynamic Associates
  • Entity typePartnership
  • PartnerSiddharth Rajeev Sonkar
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2018PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Aug 2018
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

47%18 of 38 units booked
35.8%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dynamic Imperia Plus A Phase 4ANA5503838

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Dynamic Imperia Plus A Phase 4A: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes70%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes50%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,157 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority
Permissible FSI677.73
Proposed, not sanctioned678 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS B Road Pune 411016
Estimated costRs 17.53 cr
Cost incurredRs 6.28 cr
Work done35.84%
BuildingWingEstimatedIncurred
Dynamic Imperia Plus A Phase 4ANARs 16.04 crRs 4.88 cr
-NARs 1.49 crRs 1.40 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Suresh Tarawadi
EngineerRakesh Jadhav
Chartered AccountantANJK CO & LLP
Chartered AccountantG N Mantri and Associates
PartnerRole in project
Vedant Dynamic Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Imperia Plus A-4A_Dec 2025.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1_Imperia Plus A 4A_Archi Cert_March 2026.pdf29 Jun 2026
Withdrawal Update Form 2File: Form 2_Imperia Plus A-4A_Dec 2025.pdf29 Jun 2026
Withdrawal Update Form 2File: Form 2_Imperia Plus A-4A_Engi Cert_March 2026.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3_Imperia Plus A-4A_Dec 2025.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3_Imperia Plus A-4A_CA Cert_March 2026.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1_Architect Certificate_Imperia Plus A_4A_Comm.pdf20 May 2026
Withdrawal Update Form 2File: Form 2_Imperia Plus A-4A_Engi Cert_March 2026.pdf20 May 2026
Withdrawal Update Form 3File: Form 3_Imperia Plus A-4A_CA Cert_March 2026.pdf20 May 2026
Form 5 (FY 2024-2025)File: CA Form 5_FY 2024-25_Imperia Plus A Phase 4 A - Comm - signed.pdf8 Dec 2025
Withdrawal Update Form 1File: Form 1_Architect Certificate_Imperia Plus A_4A_Comm.pdf11 Oct 2025
Withdrawal Update Form 2File: Form 2_Engineer Certificate_Imperia Plus A_4A.pdf11 Oct 2025
Withdrawal Update Form 3File: Form 3_CA Certificate_Imperia Plus A_4A.pdf11 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - June 2025.pdf22 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - June 2025.pdf22 Jul 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Imperia Plus A 4A - June 2025.pdf22 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate FY 2024-25.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - March 2025.pdf30 Apr 2025
Certificates of CA (Form 3)File: CA Certificate - March 2025 - Signed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Cert_Imperia Plus A_4A- March 2025.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate December 2024.pdf21 Jan 2025
Certificates of CA (Form 3)File: CA Certificate - December 2024_Signed_1_Compressed.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - December 2024_Signed.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Dynamic Imperia Plus A Phase 4A - Sign.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf25 Oct 2024
Certificates of CA (Form 3)File: CA Certificate - Sept 2024 - Sign.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate FY 2022-23.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf14 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Imperia Plus A.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - June 2024.pdf3 Aug 2024
Certificates of CA (Form 3)File: CA Certificate - June 2024 - Sign_11zon.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ce Imperia Plus A_Comm Form 1.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert A4A Commercial updation 31-03-2024.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Inventory A4A -A Commercial -Updation 31-03-2024.pdf9 May 2024
Certificates of CA (Form 3)File: Form 3 CA Imperia Plus -A comm updation 31-03-2024.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory VDA Imperia Plus A Commercial.pdf2 Feb 2024
Certificates of CA (Form 3)File: CA Certificate VDA Imperia Plus A Commercial Signed.pdf2 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VDA-A Commercial A4A.pdf1 Nov 2023
Declaration about Commencement CertificateFile: CC Declaration A Commercial.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Imperia Plus 4A Comm.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory A commercial.pdf12 Oct 2023
Certificates of CA (Form 3)File: CA form 3 A commercial 24-08-2023_compressed.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Imperia Plus A.pdf3 Oct 2023
Layout approvalFile: Layout Plan.pdf21 Jul 2023
Building plan approvalFile: Wing A Commercial.pdf21 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf21 Jul 2023
Building Plan Approval (IOD)File: Wing A Commercial.pdf21 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: New CC 2022.pdf21 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5).pdf24 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers A commercial.pdf15 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Enginners A Commercial.pdf15 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosuer of Inventory A commecial.pdf15 Mar 2023
Certificates of CA (Form 3)File: Form 3 CA A commercial_compressed.pdf15 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form 5_FY 2021-22_Imperia Plus A Phase 4 A - Comm.pdf26 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Form 5 VDA A wing Commercials_FY 2020-21.pdf9 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ImpA-Phase4A-March20_compressed.pdf8 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ImpA-Phase 4A-March21_compressed.pdf8 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: IMP A -Arch-Cert_compressed.pdf27 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Imp Engg Cert APhase 4A_compressed.pdf16 Aug 2021
Disclosure of sold/ booked inventoryFile: Imperia Plus A Phase 4A Commercial.pdf16 Aug 2021
Certificates of CA (Form 3)File: CA Certificate VDA A Comm.pdf16 Aug 2021
Declaration about Commencement CertificateFile: Dynamic Imperia Plus A Com CC Decla.pdf8 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A WING COMMERCIALS.PDF1 Apr 2021
OtherFile: VDA Ass Credai Certificate.pdf10 Feb 2020
Annual Audit Report of Statutory CA (Form 5)File: Form 5 A wing.pdf30 Sep 2019
Building plan approvalFile: A bldg Commercial Plan.pdf10 Aug 2018
Building Plan Approval (IOD)File: A bldg Commercial Plan.pdf10 Aug 2018
Proforma of Allotment letterFile: Unit Sale Agreement Commercial.pdf10 Aug 2018
Layout approvalFile: Layout Plan Imperia Plus.pdf9 Aug 2018
Layout approvalFile: Proposed Plan.pdf9 Aug 2018
Copy of the legal title reportFile: Search-Report.pdf9 Aug 2018
Details of encumbrancesFile: Search-Report.pdf9 Aug 2018
Copy of Layout Approval (in case of layout)File: Layout Plan Imperia Plus.pdf9 Aug 2018

How this compares with Pune

47%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dynamic Imperia Plus A Phase 4A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near pisoli13,700+ in Pune

Builder: Vedant Dynamic Associates

Vedant Dynamic Associates has 7 registrations on MahaRERA, including Dynamic Imperia Plus C Phase 1 and Dynamic Imperia Plus B Phase 5A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dynamic Imperia Plus A Phase 4A is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dynamic Imperia Plus A Phase 4A?

The registered promoter entity is Vedant Dynamic Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dynamic Imperia Plus A Phase 4A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dynamic Imperia Plus A Phase 4A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dynamic Imperia Plus A Phase 4A?

The professionals named in the filing: Architect: Vilas Suresh Tarawadi; Engineer: Rakesh Jadhav; Chartered Accountant: ANJK CO & LLP; Chartered Accountant: G N Mantri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dynamic Imperia Plus A Phase 4A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dynamic Imperia Plus A Phase 4A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dynamic Imperia Plus A Phase 4A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.