Dynamic Grandeur Premium L Phase I

By DYNAMIC REALTY ENTERPRISES

RG-MH-65159 · RERA P52100045639 · Last updated on MahaRERA portal: 8 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 16 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 75%
2 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Dynamic Grandeur Premium L Phase I is a Residential / Group Housing project by DYNAMIC REALTY ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100045639 on 26 May 2022. Possession is promised by 31 Dec 2026. 11 of the 13 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameDynamic Grandeur Premium L Phase I
  • TypeResidential / Group Housing
  • Location
    • Wadachwadi Road
    • Undri
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045639
  • ReraGenie IDRG-MH-65159

Builder

  • NameDYNAMIC REALTY ENTERPRISES
  • Entity typePartnership
  • GSTIN27AALFD8596P1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSIddharth Rajeev Sonkar, Rajeev Shivnath Sonkar
  • Other registrations8 more →
  • Completed3 of 9
  • Declared earlier projects20 →

Key dates

this monthRegisteredMay 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 May 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

85%11 of 13 units booked
79.2%Work done, per cost certificate

Figures as on 8 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dynamic Grandeur Premium L Phase INA3313013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 75%.

Dynamic Grandeur Premium L Phase I: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 8 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes80%
Street LightingYes60%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,334 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
LandownerVillageDistrict
Mr. Uttam GhuleUNDRIPune
Mr. Dadasaheb Uttam GhuleUNDRIPune
Mrs. Kasubai GhuleUNDRIPune
Mrs. Sheetal Dadasaheb GhuleUNDRIPune
Mr. Ganesh Uttam GhuleUNDRIPune
Mrs. Urmila Ganesh GhuleUNDRIPune
Mr Gulab GhuleUNDRIPune
Mrs. Meena Gulab GhuleUNDRIPune
Mr. Dattatraya GhuleUNDRIPune
Mrs. Anita Dattatraya GhuleUNDRIPune
Mr Purushottam Premji PatelMarket YardPune
Pravin Jivrajbhai PatelMarket YardPune
Leelaben Javeribhai PatelMarket YardPune
Mr. Javeribhai Premji PatelMarket YardPune
Mr. Dinesh Jivrajbhai PatelMarket YardPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3436.8
Proposed, not sanctioned3,437 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Bishop School, Undri Pune - 411060
Estimated costRs 12.71 cr
Cost incurredRs 10.07 cr
Work done79.22%
BuildingWingEstimatedIncurred
Dynamic Grandeur Premium L Phase INARs 11.08 crRs 8.97 cr
-NARs 1.63 crRs 1.11 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Tarawadi
ArchitectVilas Tarwadi
EngineerMr Gajanan Wankhade
EngineerRam Ghodake
Chartered AccountantA N J K & CO LLP
Chartered AccountantRege and Thakkar
Chartered AccountantG N Mantri and Associates
PartnerRole in project
DYNAMIC REALTY ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_Premium L Phase I_FY 2024-25 - signed.pdf8 Dec 2025
Form 1File: Form 1 Architect Certificate.pdf4 Dec 2025
Form 2File: Form 2 Engineer Certificate.pdf4 Dec 2025
Form 3File: CA Certificate L Phase I- Sign.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf4 Dec 2025
Form 1File: Form 1 Architect Certificate.pdf4 Dec 2025
Form 2File: Form 2 Engineer Certificate.pdf4 Dec 2025
Form 3File: CA Certificate L Phase I- Sign.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf4 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5_FY 2023-24_Dynamic Grandeur Premium L Phase I - Sign.pdf16 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5_FY 2023-24_Dynamic Grandeur Premium L Phase I - Sign.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate L Phase I- Sign.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf25 Oct 2024
Layout approvalFile: Layout Approval.pdf9 Oct 2024
Building plan approvalFile: 3.pdf9 Oct 2024
Building plan approvalFile: 36.pdf9 Oct 2024
Building plan approvalFile: 37.pdf9 Oct 2024
Building plan approvalFile: 38.pdf9 Oct 2024
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf9 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 36.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 37.pdf9 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 38.pdf9 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate FY 2023-24.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate L Phase I - June 2024 - Sign_11zon.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ce Imperia Plus A_Comm Form 1.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer Premium L Phase I_Form 1.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert A4A Commercial updation 31-03-2024.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Inventory L Phase I.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Premium H form 3 Signed_compressed.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 L Phase I.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate FY 2022-23.pdf19 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate L Phase I- Signed_11zon.pdf16 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 -Rera Dynamic Realty Enterprises -Premium L Phase 1.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Grandeur Premium L1_compressed.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Premium L Phase I.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Premium L Phase 1.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Premium -L phase 1_compressed.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Premium L Phase 1 Engineers Certificate_compressed.pdf6 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A -Premium L Phae I.pdf6 Mar 2023
Details of encumbrances concerned to FinanceFile: mortgage deed L.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: mortgage deed L.pdf10 Jan 2023
Details of encumbrancesFile: Encumbrances certificate.pdf23 May 2022
Details of encumbrancesFile: Capri Mortage Index II_compressed.pdf23 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate signed_final.pdf23 May 2022
Proforma of Allotment letterFile: Allotment Letter -Row House L Phase I.pdf23 May 2022
Layout approvalFile: Layout_compressed.pdf19 May 2022
Building plan approvalFile: Scan Row House 5 to 15_compressed.pdf19 May 2022
Building plan approvalFile: Scan Row House 16 17_compressed.pdf19 May 2022
PAN CardFile: PAN _Dyanmic Realty Enterprises.pdf19 May 2022
Copy of the legal title reportFile: T 1 (2)_compressed.pdf19 May 2022
Copy of the legal title reportFile: T 1 (1)_compressed (1).pdf19 May 2022
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf19 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan Row House 5 to 15_compressed.pdf19 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Scan Row House 16 17_compressed.pdf19 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf19 May 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf19 May 2022
Declaration in FORM BFile: Form B Building L Phase 1 2022_compressed.pdf19 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200237625381_For_Asset_Based_Search_19_05_2022_12_11_58_058.pdf19 May 2022
Proforma of Allotment letterFile: Row House Premium I Unit draft.pdf19 May 2022

Promoter's earlier projects20

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

16 delivered on promise4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Dynamic Grandeur Premium J WingP52100080389Taluka Haveli, Pune161May 2025OngoingDec 2031Not due yet
Dynamic Grandeur Premium IP52100015789Undri, Pune126Mar 2018OngoingDec 2031Not due yet
Dynamic Grandeur Premium HP52100046251Undri, Pune168Jun 2022OngoingDec 2029Not due yet
Dynamic Imperia Plus A Phase 4AP52100017545pisoli, Pune38Aug 2018CompletedJun 2028Jun 2025
Dynamic Grandeur Premium L Phase IIP52100046186Undri, Pune13Jun 2022OngoingDec 2026Not due yet
Dynamic Grandeur Premium GP52100015682Undri, Pune-Mar 2018CompletedDec 2026Nov 2023
Dynamic Imperia Plus D Phase 2BP52100017126Pisoli, Pune-Jul 2018CompletedJun 2026Jun 2024
Dynamic Imperia Plus D Phase 2AP52100017073Pisoli, Pune-Jul 2018CompletedJun 2026Nov 2022
Dynamic Imperia Plus B Phase 5BP52100017200Pisoli, Pune144Jul 2018CompletedJun 2026Jun 2025
Dynamic Imperia Plus B Phase 5AP52100017094Pisoli, Pune-Jul 2018CompletedJun 2026Nov 2022
Dynamic Grandstand II Phase IP52100030570KHARADI-Sep 2021CompletedDec 2025Nov 2022
Dynamic GrandeurP52100005396Undri, Pune-Aug 2017CompletedJun 2024Jun 2021
Dynamic GrandeurP52100005396Undri, Pune-Aug 2017CompletedJun 2024Jun 2021
Dynamic GrandeurP52100005396Undri, Pune-Aug 2017CompletedJun 2024Nov 2023
Dynamic Grandstand IIP52100017087Kharadi-Jul 2018CompletedDec 2023Mar 2021
LINEAP52100002743Hadapsar, Pune-Aug 2017CompletedJun 2023Sep 2019
Dynamic Imperia Plus F Phase 3P52100017142Pisoli, Pune-Jul 2018CompletedJun 2023Aug 2019
Dynamic Imperia Plus C Phase 1P52100017070Pisoli, Pune-Jul 2018CompletedDec 2022Nov 2020
Dynamic GrandeurP52100001831UNDRI, Pune-Jul 2017CompletedDec 2022Jun 2021
Dynamic OasisWadachiwadi Road Undri Pune1-CompletedJun 2022Jun 2022

How this compares with Pune

85%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dynamic Grandeur Premium L Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Undri13,700+ in Pune

2 kmDynamic Grandeur PremiumCompleted 68Lapsed / revoked 26Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: DYNAMIC REALTY ENTERPRISES

DYNAMIC REALTY ENTERPRISES has 9 registrations on MahaRERA, including Dynamic Grandeur and Dynamic Grandeur. Its filings disclose 20 earlier MahaRERA projects: declares 15 of 15 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Dynamic Grandeur Premium L Phase I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dynamic Grandeur Premium L Phase I?

The registered promoter entity is DYNAMIC REALTY ENTERPRISES, a partnership as per the filing. Its GSTIN 27AALFD8596P1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dynamic Grandeur Premium L Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dynamic Grandeur Premium L Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dynamic Grandeur Premium L Phase I?

The professionals named in the filing: Architect: Vilas Tarawadi; Architect: Vilas Tarwadi; Engineer: Mr Gajanan Wankhade; Engineer: Ram Ghodake; Chartered Accountant: A N J K & CO LLP; Chartered Accountant: Rege and Thakkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dynamic Grandeur Premium L Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dynamic Grandeur Premium L Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dynamic Grandeur Premium L Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.