SWASTIK LEGACY

By Swastik Realtors

RG-MH-30861 · RERA P51800079199 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 70%
63 of 116Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SWASTIK LEGACY is a Others project by Swastik Realtors in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079199 on 14 Feb 2025. Possession is promised by 31 Dec 2028. 53 of the 116 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSWASTIK LEGACY
  • TypeOthers
  • Location
    • Narayan Gajanan Acharya Marg
    • Subhash Nagar
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079199
  • ReraGenie IDRG-MH-30861

Builder

  • NameSwastik Realtors
  • Entity typePartnership
  • GSTIN27ABAFS2576A1ZF
  • PartnersKamlesh Bhawarlal Vagrecha, Arvind Chimanlal Shah, Hiren Dinesh Shah, Sandeep Ganeshlal Jain
  • Other registrations16 more →
  • Completed8 of 17
  • Declared earlier projects10 →

Key dates

this monthRegisteredFeb 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Current status

46%53 of 116 units booked

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWASTIK LEGACYNA14147937116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 70%.

SWASTIK LEGACY: 10% average across the applicable activities

ActivityProgress
Excavation70%
Basement (if any)20%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,648 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Subhash Nagar Sairaj CHS LtdChemburMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI10000.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 22A and Shop No 3 B Wing Kailash Esplanade Opp Shreyas Talkies LBS Marg Ghatkopar West Mumba

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSai Sampada DBS
EngineerAshfaque Khan
Chartered AccountantMH Jain & Company
Chartered AccountantJ N MEHTA & ASSOCIATES
PartnerRole in project
Swastik Realtors-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 3 RD ARCHITECT CERTIFICATE DEC 25.pdf2 Jul 2026
Form 2File: 3 RD Engineer Certificate - DEC 2025.pdf2 Jul 2026
Form 3File: form 3 swastik legacy Dec 25.pdf2 Jul 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD DEC 25.pdf2 Jul 2026
Form 1File: 4 TH ARCHITECT CERTIFICATE MARCH 26.pdf2 Jul 2026
Form 2File: 4 TH Engineer Certificate - MAR 2026.pdf2 Jul 2026
Form 3File: form 3 swastik legacy Mar 26.pdf2 Jul 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD MARCH 26.pdf2 Jul 2026
Form 1File: 1ST ARCHITECT CERTIFICATE JUNE 25.pdf26 Jun 2026
Form 2File: 1 ST Engineer Certificate - JUNE 2025.pdf26 Jun 2026
Form 3File: form 3 swastik legacy June 25.pdf26 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD JUNE 25.pdf26 Jun 2026
Form 1File: 2 ND ARCHITECT CERTIFICATE SEPT 25.pdf26 Jun 2026
Form 2File: 2 ND Engineer Certificate - SEPT 2025.pdf26 Jun 2026
Form 3File: form 3 swastik legacy Sep 25.pdf26 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD SEPT 25.pdf26 Jun 2026
Form 1File: Form 1 Legacy Mar 2025 .pdf23 Jun 2026
Form 2File: Legacy _ Engineer Certificate - MAR 2025 .pdf23 Jun 2026
Form 3File: form 3 swastik legacy Mar 25.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD MARCH 2025.pdf23 Jun 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Legacy _ Engineer Certificate - MAR 2025 .pdf21 May 2025
Commencement Certificates / NA Order for plotted developmentFile: 12606_ccrevalidation_signed.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_LEGACY_DEC'24.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Legacy Mar 2025 .pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swastik Legacy - FORM 3 - Sept 24 Signed .pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Swastik Legacy - FORM 3 - Dec 24 signed .pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - SEP -2024 .pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - DEC -2024 .pdf22 Apr 2025
Other - FinanceFile: Self Declaration _ Other Doc .pdf6 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Legacy- Disclosure on Unsecured Loan with CA certificate .pdf22 Jan 2025
Copy of the legal title reportFile: Title Report - Dec2024 .pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SIGNED.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _ signed New.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _ New.pdf5 Nov 2024
Proforma of Agreement for saleFile: AFS with highlights.pdf22 Oct 2024
Proforma of Allotment letterFile: Proforma Allotment Letter 14 10 2024.pdf14 Oct 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1).pdf10 Oct 2024
CERSAI detailsFile: Encumbrance_Format_Cersai.pdf10 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1 Declaration about all RERA Designated Bank Accounts (Format A) (1).pdf10 Oct 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (1).pdf10 Oct 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (1).pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: ilovepdf_merged.pdf9 Oct 2024
CERSAI detailsFile: CERSAI_Search_Report_200323582182_For_Asset_Based_Search_09_10_2024_15_36_42_163.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: ilovepdf_merged.pdf9 Oct 2024
Other - TechnicalFile: ANNEXURE-A As per order 50.pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (1).pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations (1).pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations (2).pdf9 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Disclosure of Interest in Other Real Estate Organizations (1).pdf9 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf12 Aug 2024
Layout approvalFile: Zero FSI IOD Plan.pdf1 Aug 2024
Building plan approvalFile: Zero FSI IOD.pdf1 Aug 2024
Building plan approvalFile: Zero FSI IOD Plan.pdf1 Aug 2024
PAN CardFile: PAN- Swastik Realtors.pdf1 Aug 2024
Copy of Layout Approval (in case of layout)File: Zero FSI IOD Plan.pdf1 Aug 2024
Declaration in FORM BFile: FORM -B (Declaration From Promoter).pdf1 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC - Feb 2024.pdf1 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Zero FSI IOD.pdf1 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Zero FSI IOD Plan.pdf1 Aug 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late4 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Swastik RevantaPR1180002501633Chembur, Mumbai Suburban74Dec 2025OngoingDec 2028Not due yet
SWASTIK SHIVAAYP51800048188SANGHANI ESTATE, Mumbai Suburban-Dec 2022OngoingDec 2027Not due yet
Swastik AvighnaP51800045871Sanghnai Estate, Mumbai Suburban99Jun 2022OngoingDec 2026Not due yet
SWASTIK DIVINEP51800046801Mulund East, Mumbai Suburban-Sep 2022OngoingDec 2026Not due yet
SWASTIK ELEGANCEP51800031928Swastik park Chembur, Mumbai Suburban-Nov 2021CompletedDec 2023Aug 2023
SWASTIK EMERALDP51800014935Tagore Nagar, Mumbai Suburban-Jan 2018CompletedDec 2022Jul 2022
Swastik SapphireP51800000239Kurla, Mumbai Suburban-Jul 2017CompletedDec 2019Late, Jan 2020

How this compares with Mumbai Suburban

46%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWASTIK LEGACY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Subhash Nagar6,700+ in Mumbai Suburban

Builder: Swastik Realtors

Swastik Realtors has 17 registrations on MahaRERA, including Swastik Sapphire and SRISHTI ELEGANCE. Its filings disclose 10 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SWASTIK LEGACY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWASTIK LEGACY?

The registered promoter entity is Swastik Realtors, a partnership as per the filing. Its GSTIN 27ABAFS2576A1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWASTIK LEGACY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWASTIK LEGACY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWASTIK LEGACY?

The professionals named in the filing: Architect: Sai Sampada DBS; Engineer: Ashfaque Khan; Chartered Accountant: MH Jain & Company; Chartered Accountant: J N MEHTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWASTIK LEGACY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWASTIK LEGACY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWASTIK LEGACY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.