Home / Browse projects / Mumbai Suburban, Maharashtra / Swastik Avighna
Swastik Avighna
RG-MH-47224 · RERA P51800045871 · Last updated on MahaRERA portal: 30 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Swastik Avighna is a Others project by Swastik Realtors in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045871 on 15 Jun 2022. Possession is promised by 31 Dec 2026. 0 of the 99 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSwastik Avighna
- TypeOthers
- Location
- Shreyas Cinemas Road
- Sanghnai Estate
- Kurla
- Mumbai Suburban
- 400086
- Pincode400086
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800045871
- ReraGenie IDRG-MH-47224
Builder
- NameSwastik Realtors
- Entity typePartnership
- GSTIN27ABAFS2576A1ZF
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersKamlesh Bhawarlal Vagrecha, Arvind Chimanlal Shah, Hiren Dinesh Shah, Sandeep Ganeshlal Jain
- Other registrations16 more →
- Completed8 of 17
- Declared earlier projects10 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed56 files
Current status
Figures as on 30 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Swastik Avighna | NA | 14 | 12 | 85 | 14 | 99 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 54%.
Swastik Avighna: 44% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 54% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Narendra R Sanghani | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ashish Bhatt |
| Architect | Pravin Khade |
| Engineer | Danish Ansari |
| Chartered Accountant | MH JAIN & CO |
| Chartered Accountant | J N MEHTA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Swastik Realtors | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 9174/2020 | Bombay High Court | For Admission |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate MAR 2025.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 JUN 24 .pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 SEPT 24 .pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate DEC 24 .pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM-2 SEP '24.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM-2 DEC'24 .pdf | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AVIGHNA MAR 23.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - AVIGHNA FY 2023-24.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 MARCH-24.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate MARCH-2024.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate Jun 2024.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate Sep 2024.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avighna _ Form 2 _ Mar 24.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avighna _ Form 2 _ Jun 24.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PLATINUM RERA CERTIFICATE .pdf | 6 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate DEC 23.pdf | 6 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM-2 DEC'23.pdf | 6 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 DEC 23 .pdf | 6 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 JUN 23.pdf | 30 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 SEPT 23.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM 2 SEPT 22.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM 2 DEC 22.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM 2 MAR 23.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM 2 JUN 23.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVIGHNA FORM 2 SEPT 23.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 SEPT 22.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 DEC 22.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVIGHNA FORM 3 MAR 23.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate SEPT 22.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate DEC 22.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate MAR 23.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate JUN 23.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avighna Architects Certificate SEPT 23.pdf | 24 Nov 2023 |
| Building plan approvalFile: 4484_SALE_IOD_PLAN_signed 1st page_compressed.pdf | 9 Jun 2022 |
| Building plan approvalFile: 2nd Page 4484_SALE_IOD_PLAN_signed.pdf | 9 Jun 2022 |
| Building plan approvalFile: 3rd Page 4484_SALE_IOD_PLAN_signed.pdf | 9 Jun 2022 |
| Building plan approvalFile: 4th Page 4484_SALE_IOD_PLAN_signed.pdf | 9 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4484_SALE_IOD_PLAN_signed 1st page_compressed.pdf | 9 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd Page 4484_SALE_IOD_PLAN_signed.pdf | 9 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3rd Page 4484_SALE_IOD_PLAN_signed.pdf | 9 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4th Page 4484_SALE_IOD_PLAN_signed.pdf | 9 Jun 2022 |
| Proforma of Allotment letterFile: Draft AFS - Swastik Avighna.pdf | 31 May 2022 |
| Proforma of Allotment letterFile: Allotment Letter - Swastik Avighna.pdf | 31 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SALE AVIGHNA MACH 22.pdf | 26 May 2022 |
| Declaration in FORM BFile: Form B Developer Avighna_compressed.pdf | 25 May 2022 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 17 May 2022 |
| Building plan approvalFile: 4484_SALE_IOD_signed.pdf | 16 May 2022 |
| Layout approvalFile: 4484_SALE_IOD_PLAN_signed 1st page_compressed.pdf | 16 May 2022 |
| PAN CardFile: SWASTIK REALTORS GHT PAN.PDF | 16 May 2022 |
| Copy of the legal title reportFile: 4484 - MahaRERA Title Report_compressed.pdf | 16 May 2022 |
| Details of encumbrancesFile: Encrumbrance without Cersai.pdf | 16 May 2022 |
| Copy of Layout Approval (in case of layout)File: 4484_SALE_IOD_PLAN_signed 1st page_compressed.pdf | 16 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4484_SALE_IOD_signed.pdf | 16 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC_4484.pdf | 16 May 2022 |
| CERSAI detailsFile: Cersai Report.pdf | 16 May 2022 |
| CERSAI detailsFile: Encumbrance with Cersai.pdf | 16 May 2022 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Swastik RevantaPR1180002501633 | Chembur, Mumbai Suburban | 74 | Dec 2025 | Ongoing | Dec 2028 | Not due yet |
| SWASTIK LEGACYP51800079199 | Subhash Nagar, Mumbai Suburban | 116 | Feb 2025 | Ongoing | Dec 2028 | Not due yet |
| SWASTIK SHIVAAYP51800048188 | SANGHANI ESTATE, Mumbai Suburban | - | Dec 2022 | Ongoing | Dec 2027 | Not due yet |
| SWASTIK DIVINEP51800046801 | Mulund East, Mumbai Suburban | - | Sep 2022 | Ongoing | Dec 2026 | Not due yet |
| SWASTIK ELEGANCEP51800031928 | Swastik park Chembur, Mumbai Suburban | - | Nov 2021 | Completed | Dec 2023 | Aug 2023 |
| SWASTIK EMERALDP51800014935 | Tagore Nagar, Mumbai Suburban | - | Jan 2018 | Completed | Dec 2022 | Jul 2022 |
| Swastik SapphireP51800000239 | Kurla, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Late, Jan 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 16 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Swastik Avighna on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Sanghnai Estate6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 273 registered projects within 2 km.
Atul Life Phase I
ATUL PROJECTS INDIA PVT LTD
SERENE CITY
SANGHVI BUILDTECH LLP
Neelyog Regent
Ratan Builders
Imperial Indrapuram B & C
Imperial Global Infra
HERITAGE AHURA RESIDENCY
KERSI JAMSHED RANDERIA
O AND S BUSINESS SUITES
SUCHITA ORANGE HDM PROJECT
See every Mumbai Suburban project, with the district possession charts
Builder: Swastik Realtors
Swastik Realtors has 17 registrations on MahaRERA, including Swastik Sapphire and SRISHTI ELEGANCE. Its filings disclose 10 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Swastik Avighna is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Swastik Avighna?
The registered promoter entity is Swastik Realtors, a partnership as per the filing. Its GSTIN 27ABAFS2576A1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Swastik Avighna?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Swastik Avighna?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Swastik Avighna?
The professionals named in the filing: Architect: Ashish Bhatt; Architect: Pravin Khade; Engineer: Danish Ansari; Chartered Accountant: MH JAIN & CO; Chartered Accountant: J N MEHTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Swastik Avighna?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback