Home / Browse projects / Palghar, Maharashtra / SPRING FIELD
SPRING FIELD
RG-MH-02899 · RERA P99000020393 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 70 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SPRING FIELD is a Residential / Group Housing project by SHantee Homes Realty LLP in Palghar, Maharashtra, registered with MahaRERA as P99000020393 on 9 Apr 2019. Possession is promised by 31 Dec 2030. The completion date has moved by 70 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameSPRING FIELD
- TypeResidential / Group Housing
- Location
- KAMAN
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- RERA no.P99000020393
- ReraGenie IDRG-MH-02899
Builder
- NameSHantee Homes Realty LLP
- Entity typePartnership
- GSTIN27ACNFS5210P1ZK
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnerNiyaz Abdulsamad Pathan
- Other registrations7 more →
- Completed3 of 8
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Apr 2019
- Promised completion31 Dec 2030
- Revised completionRevised to 31 Dec 2030 (originally 28 Feb 2025)
- Buildings23 building records
- Documents filed101 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RESI ROW HOUSE CLUSTER 1 TYPE A | NA | 34 | 2 | 0 | 0 | 0 |
| CLUSTER 2 TYPE B1 | NA | 2 | 2 | 0 | 0 | 0 |
| CLUSTER 3 TYPE B2 | NA | 2 | 2 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 4 TYPE C2 | NA | 1 | 1 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 5 TYPE C1 | NA | 1 | 1 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 9 TYPE C1 | NA | 1 | 1 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 10 TYPE C3 | NA | 1 | 1 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 11 TYPE C4 | NA | 1 | 1 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 12 TYPE D | NA | 19 | 16 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 13 TYPE D | NA | 7 | 4 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 6 TYPE C1 | NA | 1 | 1 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 7 TYPE C1 | NA | 1 | 1 | 0 | 0 | 0 |
| RESI ROW HOUSE CLUSTER 8 TYPE C1 | NA | 1 | 1 | 0 | 0 | 0 |
| Proposed Bldg | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
| PROPOSED BLDG | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 23 buildings; the table lists the first 20.
27 of 253 construction stages are filed complete across 23 buildings. The stage furthest along is Stilt Floor, at 98%.
RESI ROW HOUSE CLUSTER 1 TYPE A87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 98% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
CLUSTER 2 TYPE B127%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
CLUSTER 3 TYPE B224%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 4 TYPE C20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 5 TYPE C134%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 9 TYPE C10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 10 TYPE C30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 11 TYPE C40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 12 TYPE D77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
RESI ROW HOUSE CLUSTER 13 TYPE D81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
RESI ROW HOUSE CLUSTER 6 TYPE C174%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 7 TYPE C174%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
RESI ROW HOUSE CLUSTER 8 TYPE C125%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Bldg0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PROPOSED BLDG0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PROPOSED BLDG0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PROPOSED BLDG0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PROPOSED BLDG0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PROPOSED BLDG0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
PROPOSED BLDG0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 40% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 40% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 40% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 40% |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| RESI ROW HOUSE CLUSTER 1 TYPE A | 31 | 31 |
| RESI ROW HOUSE CLUSTER 12 TYPE D | 16 | 16 |
| RESI ROW HOUSE CLUSTER 13 TYPE D | 4 | 4 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY MALOO AND ASSOCIATES |
| Architect | MUFADDAL MERCHANT |
| Engineer | MOHAMMED SHOEB BHATI |
| Chartered Accountant | JINESH JOSHI |
| Chartered Accountant | HARESH MEHTA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHantee Homes Realty LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDate: 21/11/2023 To, The Chairman MahaRera REF: NAME OF PROJECT : - SPRING FIELD COMPANY NAME: M/S SHANTEE HOMES REALTY LLP SUBJECT : MAHARERA PROJECT DATE EXTENSION MAHA RERA NO. P99000020393 Respect Sir, There is delay in some approvals and few changes in the Approved Plan vide revised development permission no. VVCMC/TP/RDP/VP-5915/89/2019-20 Dated 18/09/2019. We request your goodself to please consider our request and extend project MahaRera date to 31ST JANURARY 2026.
Reason as filed by the promoterDate: 09/02/2025 To, The Chairman MahaRera REF: NAME OF PROJECT : - SPRING FIELD COMPANY NAME: M/S SHANTEE HOMES REALTY LLP SUBJECT : MAHARERA PROJECT DATE EXTENSION MAHA RERA NO. P99000020393 Respect Sir, I Raaz Mohammed Abdul Samad Pathan designated Partner of Shantee Homes Realty LLP do hereby declare as follows: This is with reference to our MahaRERA registered project “Spring Field” situated at Survey no. S.NO. 116 Vill-Kaman, Tal-Vasai, Dist-Palghar bearing MahaRERA registration number P99000020393 We have obtained 2/3 Consent as prescribed under RERA from the allottees of the project as
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504207 | Taj Azim Khan | SHantee Homes Realty LLP | 28/11/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 SPRING FIELD.pdf | 24 Apr 2026 |
| Form 2File: FORM 2- SPRING FEILD CL- 1 TO 13.pdf | 24 Apr 2026 |
| Form 3File: FORM-03 SPRING FIELD.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SPRING FIELD-DISCLOSURE OF INVENTORY.pdf | 24 Apr 2026 |
| Form 1File: FORM 1 SPRING FEILD_compressed.pdf | 5 Feb 2026 |
| Form 2File: FORM 2 SPRING FEILD.pdf | 5 Feb 2026 |
| Form 3File: FORM 3 SPRING FIELD_compressed.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SPRING FIELD_compressed.pdf | 5 Feb 2026 |
| Form 5 (FY 2024-2025)File: FORM -05 SPRING FIELD.pdf | 1 Feb 2026 |
| Form 1File: FORM 1 SPRING FIELD_compressed.pdf | 9 Nov 2025 |
| Form 2File: FORM 2 SPRING FIELD.pdf | 9 Nov 2025 |
| Form 3File: FORM 3 SPRING FIELD_compressed.pdf | 9 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SPRING30092025_compressed.pdf | 9 Nov 2025 |
| Form 1File: FORM 1 SPRING FIELD.pdf | 7 Nov 2025 |
| Form 2File: FORM-2 SPRING FIELD CL-1 TO13.pdf | 7 Nov 2025 |
| Form 3File: FORM-3 SPRING FIELD CL-1 TO 13.pdf | 7 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SPRING FIELD 30062025.pdf | 7 Nov 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SPRING MAR 25.pdf | 29 Apr 2025 |
| Certificates of CA (Form 3)File: FORM-3 SPRING FEILD.pdf | 29 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SPRING FIELD MAR 25.pdf | 29 Apr 2025 |
| Declaration in FORM BFile: FORM B SPRING FIELD.pdf | 18 Mar 2025 |
| Declaration in FORM BFile: FORM B SPRING FIELD EXTENSION.pdf | 18 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPRING FIELD FORM 1_compressed.pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: SPRING FIELD FORM 3 REDUCE.pdf | 24 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SPRING FIELD FORM 2.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 SHANTEE REALTY LLP SPRING FIELD.pdf | 27 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPRING FIELD CL-1 TO 13.pdf | 30 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SPRING FIELD.pdf | 30 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SPRING FIELD.pdf | 30 Jul 2024 |
| Certificates of CA (Form 3)File: SPRING FILED.pdf | 30 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SPRING FIELD.pdf | 8 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 SPRING FIELD.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A SPRING FIELD 31032024.pdf | 8 May 2024 |
| Disclosure of sold/ booked inventoryFile: SPRING FILED1.pdf | 8 May 2024 |
| Certificates of CA (Form 3)File: FORM-3 SPRING FIELD CL-1-13.pdf | 8 May 2024 |
| Building plan approvalFile: SPRING APPROVED PLAN 1.pdf | 12 Feb 2024 |
| Building plan approvalFile: SPRING APPROVED PLAN 2.pdf | 12 Feb 2024 |
| Building plan approvalFile: SPRING APPROVED PLAN 3.pdf | 12 Feb 2024 |
| Building plan approvalFile: SPRING APPROVED PLAN 4.pdf | 12 Feb 2024 |
| Building plan approvalFile: SPRING APPROVED PLAN 5.pdf | 12 Feb 2024 |
| Building plan approvalFile: SPRING APPROVED PLAN 7.pdf | 12 Feb 2024 |
| Layout approvalFile: SPRINGFIELD LAYOUT.pdf | 12 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: SPRINGFIELD LAYOUT.pdf | 12 Feb 2024 |
| Building Plan Approval (IOD)File: SPRING APPROVED PLAN 1.pdf | 12 Feb 2024 |
| Building Plan Approval (IOD)File: SPRING APPROVED PLAN 2.pdf | 12 Feb 2024 |
| Building Plan Approval (IOD)File: SPRING APPROVED PLAN 3.pdf | 12 Feb 2024 |
| Building Plan Approval (IOD)File: SPRING APPROVED PLAN 4.pdf | 12 Feb 2024 |
| Building Plan Approval (IOD)File: SPRING APPROVED PLAN 5.pdf | 12 Feb 2024 |
| Building Plan Approval (IOD)File: SPRING APPROVED PLAN 7.pdf | 12 Feb 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 12 Feb 2024 |
| CERSAI detailsFile: UNDERTAKING FOR NO CERSAI REPORT.pdf | 12 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST OTHER THAN.pdf | 12 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf | 12 Feb 2024 |
| Layout approvalFile: SPRINGFIELD LAYOUT.pdf | 10 Feb 2024 |
| Building plan approvalFile: SPRING APPROVED PLAN 1.pdf | 10 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: SPRINGFIELD LAYOUT.pdf | 10 Feb 2024 |
| Building Plan Approval (IOD)File: SPRING APPROVED PLAN 1.pdf | 10 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SPRING FIELD CL-1.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SPRING FIELD CL-2.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SPRING FIELD CL-3-13.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 SPRING FIELD.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: FORM-3 SPRING FIELD CL 1 TO 13.pdf | 6 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 SPRING FIELD.pdf | 25 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SPARING FIELD 21-22.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SPRING FIELD FORM 2A AJHAR.pdf | 6 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SPRING FIELD.pdf | 13 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 SPRING FIELD.pdf | 13 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SPRING FIELD.pdf | 13 Nov 2023 |
| Certificates of CA (Form 3)File: FORM-3 SPRING FIELD.pdf | 13 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPRING FIELD CL-01.pdf | 25 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SPRING FIELD CL-01-13.pdf | 25 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SPRING FIELD.pdf | 25 Feb 2023 |
| Certificates of CA (Form 3)File: SPRING FILED.pdf | 25 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SPRING FIELD FY 2021-22.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SPRING FIELD.pdf | 28 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: SPRING FIELD.pdf | 10 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: SPRING FIELD.pdf | 10 Mar 2022 |
| Form 2AFile: FORM 2A ASRAR SPRING FIELD.pdf | 8 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SPRING FIELD FORM 2A 30-06-21 AZHAR.pdf | 19 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SPRINGFIELD FORM 2A AZHAR.pdf | 19 Aug 2021 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SUNSHINE GREEN PARK PHASE -3P99000017859 | GOKHIVARE, Palghar | 180 | Sep 2018 | Completed | Dec 2026Registered original: Jun 2022 | Jan 2025 |
| SUNSHINE GREEN PARK PHASE 2P99000001294 | VASAI EAST, Palghar | - | Jul 2017 | Completed | Jun 2025Registered original: Mar 2019 | Jan 2025 |
| SHAMROCK RESIDENCYP99000020998 | MANICKPUR, Palghar | - | May 2019 | Completed | Apr 2024 | Sep 2021 |
| ROMAN RESIDENCYP99000021827 | WADAVALI, Palghar | 62 | Jul 2019 | Completed | Dec 2023 | Jan 1970 |
| SARGAM RESIDENCYP99000016959 | NAIGAON, Palghar | 203 | Jun 2018 | Completed | Dec 2022 | Jan 1970 |
| SUNSHINE GREEN PARK PHASE IP99000001370 | VASAI EAST, Palghar | - | Jul 2017 | Completed | Mar 2018 | Late, Jul 2018 |
| SARGAM AVENUEP99000001489 | Chandrapada, Palghar | 132 | Jul 2017 | Completed | Mar 2018 | Jan 1970 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SPRING FIELD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KAMAN3,200+ in Palghar
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: SHantee Homes Realty LLP
SHantee Homes Realty LLP has 8 registrations on MahaRERA, including SUNSHINE GREEN PARK PHASE I and SUNSHINE GREEN PARK PHASE 2. Its filings disclose 7 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SPRING FIELD is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SPRING FIELD?
The registered promoter entity is SHantee Homes Realty LLP, a partnership as per the filing. Its GSTIN 27ACNFS5210P1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SPRING FIELD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SPRING FIELD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SPRING FIELD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SPRING FIELD?
The professionals named in the filing: Architect: SANJAY MALOO AND ASSOCIATES; Architect: MUFADDAL MERCHANT; Engineer: MOHAMMED SHOEB BHATI; Chartered Accountant: JINESH JOSHI; Chartered Accountant: HARESH MEHTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SPRING FIELD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback