Home / Browse projects / Palghar, Maharashtra / Rashmi Star City Phase 2

Registered Litigation declared Others project

Rashmi Star City Phase 2

By Rashmi Realty Builders Pvt Ltd

RG-MH-26832 · RERA P99000005391 · Last updated on MahaRERA portal: 27 Sep 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 7 complaints at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
29 of 88Construction stages doneacross 15 buildings; furthest along: Slabs of Super Structure, 50%
1,148 of 1,228Units unsoldnot recorded sold or booked
7Complaints at MahaRERAon this registration
Jump to the 362 documents Report an error

Rashmi Star City Phase 2 is a Others project by Rashmi Realty Builders Pvt Ltd in Palghar, Maharashtra, registered with MahaRERA as P99000005391 on 11 Aug 2017. Possession is promised by 30 Dec 2026. 80 of the 1,228 units on this registration are recorded sold or booked, and 29 of 88 construction stages are filed complete. 7 complaints are on record with the regulator.

At a glance

Project

  • NameRashmi Star City Phase 2
  • TypeOthers
  • Location
    • Naigaon East
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000005391
  • ReraGenie IDRG-MH-26832

Builder

  • NameRashmi Realty Builders Pvt Ltd
  • Entity typeCompany
  • Managing DirectorAshok Pranjivan Bosmiya
  • Other registrations3 more →

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings15 building records
  • Documents filed362 files

Current status

7%80 of 1,228 units booked
48.9%Work done, per cost certificate

Figures as on 27 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE B9NA8716016
TYPE D1NA471768472
TYPE D2NA22171025107
TYPE C12NA141224428
TYPE B12NA181713610146
TYPE B13NA181713618154
TYPE B11NA181713610146
TYPE B10NA181713617153
TYPE C13NA121224428
TYPE F1NA212121013223
TYPE F2NA21211478155
TYPE K1NA230000
TYPE K2NA230000
TYPE M1NA230000
TYPE M2NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building15

As on 27 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 88 construction stages are filed complete across 15 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

TYPE B951%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE D151%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE D251%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE C1227%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE B1227%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE B1327%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE B1151%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE B1051%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE C13Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
TYPE F1Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
TYPE F2Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
TYPE K1Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
TYPE K2Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
TYPE M1Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
TYPE M2Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 27 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
TYPE B1211
TYPE B1311
TYPE B1111
TYPE B1011

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,886 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2025

Approvals and building plan

Sanctioning authorityVASAI - VIRAR CITY MUNICIPAL Corporation
Permissible FSI19528.75
Proposed, not sanctioned8,886 sq m
Buildings approved8
Buildings sanctioned15

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch29/A La-Avanti,Junction of SV Road, Santacruz W Mumbai 400054
Estimated costRs 320.83 cr
Cost incurredRs 156.74 cr
Work done48.85%
BuildingWingEstimatedIncurred
-NARs 160.41 crRs 80.20 cr
TYPE F1NARs 29.50 crRs 10.00 cr
TYPE F2NARs 28.75 crRs 11.25 cr
TYPE B12NARs 18.00 crRs 9.00 cr
TYPE B13NARs 18.00 crRs 9.00 cr
TYPE B11NARs 18.00 crRs 9.00 cr
TYPE B10NARs 18.00 crRs 9.00 cr
TYPE D1NARs 12.60 crRs 10.00 cr
TYPE D2NARs 8.57 crRs 4.28 cr
TYPE C12NARs 4.50 crRs 2.50 cr
TYPE C13NARs 4.50 crRs 2.50 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIPUL Adhia
EngineerJANESH KUMAR SINGH
Chartered AccountantASHOK R SHETTY
PartnerRole in project
Rashmi Realty Builders Pvt Ltd-

Litigation declared3

CaseCourtStatus
87/2013/2013HIGH COURT MUMBAIORDER PASSED
505/14/2014VASAI COURTORDER PASSED
424/TC-1/2011ENVIORNMENT DEPARTMENTORDER PASSED

Complaints filed with MahaRERA7

Case no.ComplainantRespondentFiled
CC006000000000248Melwin LoboYogesh Pranjivan Bosmiya10/10/2017
CC006000000000528Geeta TinaniRashmi Realty Builders Pvt Ltd15/09/2017
CC006000000194364MANISHKUMAR RAMRASAD TRIPATHIrashmi realty builders pvt ltd20/10/2020
CC006000000251531Reshmi Reality Builders Private limitedMahendra Yashwant Bhadekar & Ors20/06/2022
CC006000000375208Mohammed Reza SadequianRashmi Realty Pvt. Ltd.10/04/2023
CC006000000398014Sandesh Popat KateM/s. Rashmi Realty Builders Pvt. Ltd31/12/2023
CC12400899Percy ShroffRashmi Realty Builders Pvt Ltd26/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed362

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 362 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 2017 -18.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 2017 -18.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 2017 -18.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 18 -19.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 18 -19.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 18 -19.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 19 - 20.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 19 - 20.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 19 - 20.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 19 - 20.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 19 - 20.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 20 - 21.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025
Form 1File: ARCH.pdf27 Sep 2025
Form 2File: Form 2 22 - 23.pdf27 Sep 2025
Form 3File: CA FORM 3.pdf27 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf27 Sep 2025

How this compares with Palghar

7%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rashmi Star City Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Naigaon East3,200+ in Palghar

2 kmRashmi Star City Phase 2Completed 24Lapsed / revoked 7Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: Rashmi Realty Builders Pvt Ltd

Rashmi Realty Builders Pvt Ltd has 4 registrations on MahaRERA, including Rashmi Star City Phase 2 and Rashmi Star City Phase 3. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Rashmi Star City Phase 2 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rashmi Star City Phase 2?

The registered promoter entity is Rashmi Realty Builders Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rashmi Star City Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Rashmi Star City Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Rashmi Star City Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rashmi Star City Phase 2?

The professionals named in the filing: Architect: VIPUL Adhia; Engineer: JANESH KUMAR SINGH; Chartered Accountant: ASHOK R SHETTY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rashmi Star City Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rashmi Star City Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rashmi Star City Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.