Home / Browse projects / Nagpur, Maharashtra / SAMRUDDHI - 6
SAMRUDDHI - 6
RG-MH-14780 · RERA P50500047388 · Last updated on MahaRERA portal: 17 Dec 2023
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMRUDDHI - 6 is a Plotted project by TIRUPATI DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500047388 on 27 Oct 2022. The registration is recorded completed; possession was promised by 31 Jul 2027. 41 of the 54 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.
At a glance
Project
- NameSAMRUDDHI - 6
- TypePlotted
- Location
- KH NO 72
- SUKLI (GUPCHUP)
- Sukali(gupchup)
- Hingna
- Nagpur
- 441110
- Pincode441110
- RERA no.P50500047388
- ReraGenie IDRG-MH-14780
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Oct 2022
- Promised completion31 Jul 2027
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed52 files
Current status
Figures as on 17 Dec 2023, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 17 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | UMESH MORESHWAR LAMGE |
| Engineer | MAHESH ASHOKRAO BALPANDE |
| Chartered Accountant | Saloni Bang And Associates |
| Partner | Role in project |
|---|---|
| TIRUPATI DEVELOPERS | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC004000000030530 | CHINMOY UMASHANKAR MUKHERJEE | TIRUPATI DEVELOPERS | 27/07/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Dec 2023
Documents filed52
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Letter.pdf | 17 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: D1 SM6.pdf | 17 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: D2 SM6.pdf | 17 Dec 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 SM6.pdf | 17 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SMR-6.pdf | 8 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A -2022.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A -2023.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 20 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organization (Rahul Upganlawar) (1).pdf | 3 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organization (Prashant Bongirwar) (1).pdf | 3 Sep 2023 |
| Other - LegalFile: SMR-6RL(1-3).pdf | 2 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold SMR-6 7-02-23.pdf | 11 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance For Mortgage SMR-6(FINANCE).pdf | 15 Oct 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE for Legal SMR-6.pdf | 15 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: SMR-6 DEVIATION REPORT (ALLOTMENT LETTER).pdf | 14 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: SMR-6 DEVIATION REPORT (AGREEEMENT LETTER).pdf | 14 Oct 2022 |
| Proforma of Allotment letterFile: SMR-6 MODEL RERA AGREEMENT (16-10-2022) FINAL.pdf | 7 Oct 2022 |
| Proforma of Agreement for saleFile: SMR-6 MODEL RERA AGREEMENT (16-10-2022) FINAL.pdf | 7 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SMR-6 Declaration about Separate Bank Account final.pdf | 7 Oct 2022 |
| Proforma of Agreement for saleFile: FORMAT OF ALLOTMENT LETTER SMR-6 1.pdf | 26 Sep 2022 |
| Proforma of Allotment letterFile: FORMAT OF ALLOTMENT LETTER SMR-6 1.pdf | 26 Sep 2022 |
| Proforma of Allotment letterFile: FORMAT OF ALLOTMENT LETTER SMR-6 2.pdf | 26 Sep 2022 |
| Proforma of Agreement for saleFile: FORMAT OF ALLOTMENT LETTER SMR-6 2.pdf | 26 Sep 2022 |
| Proforma of Agreement for saleFile: FORMAT OF ALLOTMENT LETTER SMR-6 3.pdf | 26 Sep 2022 |
| Proforma of Allotment letterFile: FORMAT OF ALLOTMENT LETTER SMR-6 3.pdf | 26 Sep 2022 |
| Declaration in FORM BFile: ALLOTMENT LETTER SMR-6-5-6.pdf | 12 Sep 2022 |
| Declaration in FORM BFile: From B Rera SMR-6-1.pdf | 6 Aug 2022 |
| Declaration in FORM BFile: From B Rera SMR-6-2-3.pdf | 6 Aug 2022 |
| Declaration in FORM BFile: From B Rera SMR-6-4.pdf | 6 Aug 2022 |
| Layout approvalFile: FINAL MAP of Sanctioned plan SMR-6.pdf | 3 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: FINAL MAP of Sanctioned plan SMR-6.pdf | 3 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order for plotted development 1.pdf | 3 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order for plotted development 2.pdf | 3 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200243879065_Asset_Based_Search_03_08_2022_.pdf | 3 Aug 2022 |
| Copy of the legal title reportFile: Legal Title Report 1.pdf | 14 Jul 2022 |
| Copy of the legal title reportFile: Legal Title Report 2.pdf | 14 Jul 2022 |
| Copy of the legal title reportFile: Legal Title Report 3.pdf | 14 Jul 2022 |
| Copy of the legal title reportFile: Legal Title Report 4.pdf | 14 Jul 2022 |
| Copy of the legal title reportFile: Legal Title Report 5.pdf | 14 Jul 2022 |
| Copy of the legal title reportFile: Legal Title Report 6.pdf | 14 Jul 2022 |
| Building plan approval or NA orderFile: SAMRUDDHI 6 NA ORDER -1-2.pdf | 6 Jul 2022 |
| Building plan approval or NA orderFile: SAMRUDDHI 6 NA ORDER -3-4.pdf | 6 Jul 2022 |
| PAN CardFile: PANCARD(TIRUPATI DEVELOPERS).pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: SAMRUDDHI 6 NA ORDER -1-2.pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: SAMRUDDHI 6 NA ORDER -3-4.pdf | 6 Jul 2022 |
| Declaration about Commencement CertificateFile: SMR6 Declaration commencement.pdf | 6 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAMRUDDHI-6 ( CA CERTIFICATE)-1-2.pdf | 6 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAMRUDDHI-6 ( CA CERTIFICATE)-3-4.pdf | 6 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAMRUDDHI-6 ( CA CERTIFICATE)-5-6.pdf | 6 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAMRUDDHI-6 ( CA CERTIFICATE)-7.pdf | 6 Jul 2022 |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| RAJATBHOOMI - 13P50500079362 | MOUZA DONGARGAON, Nagpur | 59 | Feb 2025 | Ongoing | Dec 2029 | Not due yet |
| SILVER WOODS 1P50500078257 | MONDHA HINGNA, Nagpur | 61 | Dec 2024 | Ongoing | Oct 2029 | Not due yet |
| SILVER STAR 4P50500078957 | KH NO 105 PH NO 6B MOUZA NAGALWADI TAHSIL HINGNA AND DISTRICT NAGPUR, Nagpur | 47 | Jan 2025 | Ongoing | Oct 2029 | Not due yet |
| Silver Pride - 3P50500056076 | Mouza - Dongargaon, Nagpur | 55 | May 2024 | Ongoing | Mar 2029 | Not due yet |
| VRINDAVAN PARK - 4P50500079234 | KH NO 30 PART PH NO 45 SUKLI GUPCHUP HINGNA NAGPUR, Nagpur | 22 | Feb 2025 | Ongoing | Jan 2029 | Not due yet |
| SILVER STAR - 1P50500054832 | Kh No 107, P. H. No. 6B Nagalwadi Hingna Nagpur, Nagpur | 160 | Feb 2024 | Ongoing | Jan 2029 | Not due yet |
| SILVER STAR-2P50500055267 | Nagalwadi, Nagpur | 37 | Mar 2024 | Ongoing | Jan 2029 | Not due yet |
| SILVER PRIDE - 1P50500054735 | MOUZA GAWASI MANAPUR, Nagpur | 102 | Feb 2024 | Completed | Dec 2028 | Mar 2025 |
| VRINDAVAN PARK-6P50500054319 | SUKALI, Nagpur | 36 | Jan 2024 | Ongoing | Nov 2028 | Not due yet |
| VRINDAVAN PARK-3P50500054315 | MOUZA SUKALI GUPCHUP TAHSIL HINGNA DISTRICT NAGPUR, Nagpur | 59 | Jan 2024 | Ongoing | Nov 2028 | Not due yet |
| SILVER PARK-14P50500054108 | NAGPUR, Nagpur | 59 | Dec 2023 | Completed | Nov 2028 | Sep 2024 |
| SILVER PARK 15P50500054435 | PANJRI FARM NAGPUR GRAMIN, Nagpur | 65 | Jan 2024 | Completed | Nov 2028 | Jul 2024 |
| VRINDAVAN PARK-5P50500051805 | MOUZA SUKALI GUPCHUP, Nagpur | 42 | Jul 2023 | Completed | May 2028 | Sep 2024 |
| SILVER PARK-13P50500052018 | KHATE NO 56 SHANKARPUR, Nagpur | 50 | Jul 2023 | Completed | May 2028 | Sep 2024 |
| SAMRUDDHI 8P50500053273 | GUPCHUP, Nagpur | 45 | Oct 2023 | Completed | Mar 2028 | Sep 2024 |
| Silvericon 2P50500052818 | Gotal Panjari, Nagpur | 45 | Oct 2023 | Completed | Jan 2028 | Oct 2024 |
| Samruddhi 4P50500047743 | Sukali, Nagpur | 65 | Nov 2022 | Completed | Oct 2027 | Dec 2023 |
| HIGHWAY GLORYP50500023401 | KH NO 14 DONGARGAON, Nagpur | 35 | Dec 2019 | Completed | Sep 2027Registered original: Sep 2022 | May 2024 |
| SILVER ICON - 1P50500048096 | MOUZA GOTAL PANJARI, Nagpur | 67 | Dec 2022 | Completed | Jul 2027 | Oct 2024 |
| Rajatbhoomi 11P50500048070 | Dongargaon, Nagpur | 39 | Dec 2022 | Ongoing | Jul 2027 | Not due yet |
| SAMRUDDHI 2P50500045310 | HINGNA, Nagpur | 53 | May 2022 | Completed | Apr 2027 | Jun 2023 |
| SILVER PARK - 12P50500034842 | SHANKARPUR, Nagpur | 40 | Apr 2022 | Completed | Mar 2027 | Jun 2023 |
| SAMRUDDHI 1P50500034791 | HINGNA TAHSIL, Nagpur | 15 | Apr 2022 | Completed | Mar 2027 | Jun 2023 |
| RAJATBHOOMI - 3P50500017744 | NEAR JAMTHA STADIUM, Nagpur | 101 | Sep 2018 | Completed | Mar 2027Registered original: Dec 2019 | Apr 2025 |
| Samruddhi3P50500033334 | SUKLI - GUPCHUP, Nagpur | 47 | Feb 2022 | Completed | Jan 2027 | Jun 2023 |
| SAMRUDDHI 5P50500033426 | SUKLI (GUPCHUP), Nagpur | 73 | Feb 2022 | Completed | Jan 2027 | Dec 2023 |
| SILVERPARK - 8P50500033401 | MOUZA SHANKARPUR KH NO 25/2/A, Nagpur | 31 | Feb 2022 | Completed | Sep 2026 | Feb 2023 |
| SILVERPARK - 7P50500032992 | TAH AND DIST NAGPUR, Nagpur | 40 | Feb 2022 | Completed | Sep 2026 | Feb 2023 |
| SILVERPARK - 11P50500032908 | KH NO 31/1/ PART, Nagpur | 75 | Feb 2022 | Completed | Sep 2026 | Apr 2023 |
| SILVER PARK - 9P50500032837 | NAGPUR, Nagpur | 79 | Feb 2022 | Completed | Sep 2026 | Jun 2023 |
| SILVER PARK - 10P50500032628 | NAGPUR, Nagpur | 62 | Jan 2022 | Completed | Sep 2026 | Mar 2023 |
| SUVARNABHOOMIP50500008330 | NAGPUR GRAMIN, Nagpur | 324 | Aug 2017 | Ongoing | Mar 2026Registered original: Sep 2020 | Not delivered |
| SILVER CITY - 2P50500029462 | NAGPUR, Nagpur | 184 | May 2021 | Ongoing | Mar 2026 | Not delivered |
| SILVER CITYP50500018573 | KOTHEWADA, Nagpur | 220 | Nov 2018 | Ongoing | Mar 2026Registered original: Sep 2020 | Not delivered |
| DHANBHOOMI 1P50500008320 | HINGNA TAH, Nagpur | 185 | Aug 2017 | Ongoing | Mar 2026Registered original: Sep 2020 | Not delivered |
| VRINDAVAN PARK - 2P50500030295 | MOUZA KHADKA TAH HINGNA, Nagpur | 36 | Aug 2021 | Completed | Dec 2025 | Dec 2023 |
| RAJATBHOOMI - 6P50500017852 | NEAR JAMTHA STADIUM, Nagpur | 34 | Sep 2018 | Ongoing | Sep 2025Registered original: Dec 2019 | Not delivered |
| RAJATBHOOMI - 5P50500018095 | NEAR JAMTHA STADIUM, Nagpur | 56 | Oct 2018 | Completed | Sep 2025Registered original: Dec 2019 | May 2025 |
| RAJATBHOOMI - 2P50500017735 | NEAR JAMTHA STADIUM, Nagpur | 9 | Sep 2018 | Ongoing | Sep 2025Registered original: Dec 2019 | Not delivered |
| DHANBHOOMI 2P50500027114 | HINGNA, Nagpur | 156 | Nov 2020 | Ongoing | Sep 2025Registered original: Sep 2023 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 80 other registrations, which the RERA portal never shows together
- All 52 filed documents as one ZIP, foldered, with a manifest
Keep SAMRUDDHI - 6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SUKLI (GUPCHUP)2,800+ in Nagpur
A2 Universal
Aditya Anagha Multi State Credit Co-Operat
Nagpur Marina
HOABL Impactum Land Private Limited
CANAL FRONT-02
SHIVAJI LAND BUILDERS AND DEVELOPERS
MAuli Nagar 12
P SQUARE REALTY
KANCHAN NAGARI 7
SHUBH INFRASTRUCTURE
MAULI TOWN- 21
KIRTISAGAR REALTY PRIVATE LIMITED
See every Nagpur project, with the district possession charts
Builder: TIRUPATI DEVELOPERS
TIRUPATI DEVELOPERS has 81 registrations on MahaRERA, including SUVARNABHOOMI and DHANBHOOMI 1. Its filings disclose 86 earlier MahaRERA projects: declares 55 of 67 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SAMRUDDHI - 6 is delayed beyond 31 Jul 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMRUDDHI - 6?
The registered promoter entity is TIRUPATI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMRUDDHI - 6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAMRUDDHI - 6?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAMRUDDHI - 6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMRUDDHI - 6?
The professionals named in the filing: Architect: UMESH MORESHWAR LAMGE; Engineer: MAHESH ASHOKRAO BALPANDE; Chartered Accountant: Saloni Bang And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMRUDDHI - 6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback