Home / Browse projects / Nagpur, Maharashtra / Rajatbhoomi 11

Completed No litigation declared Plotted project

Rajatbhoomi 11

By TIRUPATI DEVELOPERS

RG-MH-47862 · RERA P50500048070 · Last updated on MahaRERA portal: 10 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 80 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedregistration recorded completed
2 of 39Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Rajatbhoomi 11 is a Plotted project by TIRUPATI DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500048070 on 8 Dec 2022. The registration is recorded completed; possession was promised by 31 Jul 2027. 37 of the 39 units on this registration are recorded sold or booked.

At a glance

Project

  • NameRajatbhoomi 11
  • TypePlotted
  • Location
    • Wardha Road
    • Dongargaon
    • Dongargaon (535897)
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • RERA no.P50500048070
  • ReraGenie IDRG-MH-47862

Builder

  • NameTIRUPATI DEVELOPERS
  • Entity typePartnership
  • PartnersRahul Arunrao Upganlawar, Prashant Manoharrao Bongirwar
  • Other registrations80 more →
  • Completed56 of 81
  • No longer live6 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects86 →

Key dates

this monthRegisteredDec 2022PromisedJul 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Dec 2022
  • Promised completion31 Jul 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed89 files

Current status

95%37 of 39 units booked
100.0%Work done, per cost certificate

Figures as on 10 Oct 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 10 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,880 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025

Approvals and building plan

Sanctioning authorityNagpur Metro Region Development Authority (NMRDA)

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVeer Savarkar Marg, Kotwal Nagar
Estimated costRs 57.78 lakh
Cost incurredRs 57.78 lakh
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 57.78 lakhRs 57.78 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Lamge
EngineerMahesh Balpande
EngineerMayur Karingwar
Chartered AccountantPayal Taori
Chartered AccountantMJM Associates
Chartered AccountantSaloni Bang
Chartered AccountantKND & Associates
Chartered AccountantSonam Thakur
PartnerRole in project
TIRUPATI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Aug 2025

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 , 10-12 2022 Rajatbhoomi 11.pdf10 Oct 2025
Form 2File: Form 2 , 10-12 2022 Rajatbhoomi 11.pdf10 Oct 2025
Form 3File: Form 3 , 10-12 2022 Rajatbhoomi 11.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 10-12 2022 Rajatbhoomi 11.pdf10 Oct 2025
Form 1File: Form 1 , 10-12 2023 Rajatbhoomi 11.pdf10 Oct 2025
Form 2File: Form 2 , 10-12 2023 Rajatbhoomi 11.pdf10 Oct 2025
Form 3File: Form 3 , 10-12 2023 Rajatbhoomi 11.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 10-12 2023 Rajatbhoomi 11.pdf10 Oct 2025
Completion CertificateFile: Completion Certificate.pdf21 Aug 2025
Completion CertificateFile: FORM 4 RAJATBHOOMI 11.pdf21 Aug 2025
Completion CertificateFile: CC Verification mail_.pdf21 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 RAJATBHOOMI 11.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RB 11.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI RB 11.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RB 11.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Layout approvalFile: NA MAP RB-11_compressed.pdf13 Jan 2025
Building plan approval or NA orderFile: NA COVERING LETTER.pdf13 Jan 2025
Copy of Layout Approval (in case of layout)File: NA MAP RB-11_compressed.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf13 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER RB-11.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: NA COVERING LETTER.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: DSBI.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 RB 11.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 RB 11.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July-Sep2024.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July-Sep 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July-Sep 2024.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: DSBI July-Sep 2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE RAJATBHOOMI 11.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: DSBI.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 RB 11 1-4-23 TO 30-06-23.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 RB 11 DATE 01-9-23 TO 31-12-23.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RB 11.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: DSBI 31-12-22.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: DSBI 31-03-2023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: DSBI 31-03-2023_.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: DSBI 30-6-23.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: DSBI 30-09-2023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: DSBI 31-12-2023.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: DSBI 31-03-2024.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 31-12-2022.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 31-03-2023.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 30-6-23.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 oct -dec.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 30-12-2023.pdf20 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 FORM 2 RB 11 DT 30 12 2022.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2 RB 11 DT 30 06 2023.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DT 30 09 2024.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 FORM 2 RB 11 DT 31 12 2023.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-03-2023.pdf20 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 31-5-23.pdf20 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 oct -dec.pdf29 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 RB 11.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA CERTIFICATE.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA CERTIFICATE.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2RB-11.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf26 Oct 2023
Copy of the legal title reportFile: Rajat Bhoomi TITLE -1.pdf17 Nov 2022
Copy of the legal title reportFile: Rajat Bhoomi TITLE 2.pdf17 Nov 2022
Copy of the legal title reportFile: Rajat Bhoomi TITLE 3.pdf17 Nov 2022
Copy of the legal title reportFile: RB-11 SEARCH AND TITLE REPORT_compressed.pdf17 Nov 2022
Deviation Report with respect to Allotment letterFile: RB-11 NO DEVIATION FROM ALLOTMENT LETTER.pdf17 Nov 2022
Deviation Report with respect to model copy of AgreementFile: RB-11 NO DEVIATION FROM AGREEMENT TO SALE.pdf17 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration About for Bank Account RB-11.pdf7 Nov 2022
Layout approvalFile: KH NO 77-1 RB-11 Layout PLAN compressed.pdf29 Oct 2022
Building plan approval or NA orderFile: NA Order RB 11.pdf29 Oct 2022
PAN CardFile: Pan card TD.pdf29 Oct 2022
Details of encumbrances concerned to FinanceFile: RB-11 the is no legal encumbrance.pdf29 Oct 2022
Details of encumbrances concerned to LegalFile: RB-11 the is no legal encumbrance.pdf29 Oct 2022
Copy of Layout Approval (in case of layout)File: KH NO 77-1 RB-11 Layout PLAN compressed.pdf29 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: NA Order RB 11.pdf29 Oct 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SILVER PARK 15P50500054435PANJRI FARM NAGPUR GRAMIN, Nagpur65Jan 2024CompletedNov 2028Jul 2024
IMPERIALSHANKARPUR--CompletedMay 2013Late, Nov 2013

How this compares with Nagpur

95%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rajatbhoomi 11 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dongargaon2,800+ in Nagpur

Builder: TIRUPATI DEVELOPERS

TIRUPATI DEVELOPERS has 81 registrations on MahaRERA, including SUVARNABHOOMI and DHANBHOOMI 1. Its filings disclose 86 earlier MahaRERA projects: declares 55 of 67 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Rajatbhoomi 11 is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rajatbhoomi 11?

The registered promoter entity is TIRUPATI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rajatbhoomi 11?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rajatbhoomi 11?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rajatbhoomi 11?

The professionals named in the filing: Architect: Umesh Lamge; Engineer: Mahesh Balpande; Engineer: Mayur Karingwar; Chartered Accountant: Payal Taori; Chartered Accountant: MJM Associates; Chartered Accountant: Saloni Bang. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rajatbhoomi 11?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rajatbhoomi 11. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rajatbhoomi 11 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.