ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / VRINDAVAN PARK - 4

Completed No litigation declared Plotted project

VRINDAVAN PARK - 4

By TIRUPATI DEVELOPERS

RG-MH-30896 · RERA P50500079234 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 80 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jan 2029Possession promisedregistration recorded completed
1 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

VRINDAVAN PARK - 4 is a Plotted project by TIRUPATI DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500079234 on 18 Feb 2025. The registration is recorded completed; possession was promised by 31 Jan 2029. 21 of the 22 units on this registration are recorded sold or booked.

At a glance

Project

  • NameVRINDAVAN PARK - 4
  • TypePlotted
  • Location
    • HINGNA
    • KH NO 30 PART PH NO 45 SUKLI GUPCHUP HINGNA NAGPUR
    • Sukali(gupchup)
    • Nagpur
    • 441110
  • Pincode441110
  • RERA no.P50500079234
  • ReraGenie IDRG-MH-30896

Builder

  • NameTIRUPATI DEVELOPERS
  • Entity typePartnership
  • PartnersRAHUL UPGANLAWAR, PRASHANT BONGIRWAR
  • Other registrations80 more →
  • Completed56 of 81
  • No longer live6 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects86 →

Key dates

this monthRegisteredFeb 2025PromisedJan 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Feb 2025
  • Promised completion31 Jan 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed58 files

Current status

95%21 of 22 units booked
95.0%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,737 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitian Region Development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRD AND MEZZ FLOOR ANANDAM WORLD CITY SHOP NO 4 TO 6 MODEL MILL COMPOUND GANESHPETH DIST NAGPUR NAGPUR MAHARASHTRA 440018
Estimated costRs 66.29 lakh
Cost incurredRs 62.97 lakh
Work done95.0%
BuildingWingEstimatedIncurred
-NARs 66.29 lakhRs 62.97 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH LAMGE
EngineerMahesh Balpande
EngineerMayur Karingwar
Chartered AccountantSharma N CO
Chartered AccountantMJM Associates
Chartered AccountantSonam Thakur
Chartered AccountantSaloni Bang
Chartered AccountantKND Associates
PartnerRole in project
TIRUPATI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Apr 2026

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: Sukli kh no 30 completion certificate.pdf27 Apr 2026
Completion CertificateFile: VP 4 CC VERIFICATION COMPLETION 22 04 2026.pdf27 Apr 2026
Completion CertificateFile: FORM 4 ARCHITECT CERTIFICATE VRINDAVAN PARK 4.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1 VRINDAVAN PARK 4.pdf16 Apr 2026
Withdrawal Update Form 2File: FORM 2 VRINDAVAN PARK 4.pdf16 Apr 2026
Withdrawal Update Form 3File: FROM 3 CA CERTIFICATE VRINDAVAN PARK 4 DATE 15 04 2026.pdf16 Apr 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE VRINDAVAN PARK 4.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE VRINDAVAN PARK 4.pdf16 Jan 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE VRINDAVAN PARK 4.pdf16 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECTu0027S CERTIFICATE VRINDAVAN PARK 4.pdf18 Nov 2025
Withdrawal Update Form 2File: FORM 2 ENGINEERu0027S CERTIFICATE VRINDAVAN PARK 4.pdf18 Nov 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE VRINDAVAN PARK 4 DATE 28 08 2025.pdf18 Nov 2025
Form 2A (FY 2024-2025)File: FORM-2 A VIRNDAVAN PARK-4.pdf8 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 CA CERTIFICATE VP 4 F Y 2024 2025.pdf8 Nov 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECTu0027S CERTIFICATE VRINDAVAN PARK 4.pdf20 Sep 2025
Withdrawal Update Form 2File: FORM 2 ENGINEERu0027S CERTIFICATE VRINDAVAN PARK 4.pdf20 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE VRINDAVAN PARK 4 DATE 28 08 2025.pdf20 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRINDAVAN PARK 4.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 VP 4 Jan-Mar 25.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VP 4 Jan-MAr 25.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI VP 4 Jan-Mar 25.pdf18 Apr 2025
Building plan approval or NA orderFile: Letter for RERA.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Letter for RERA.pdf12 Feb 2025
Building plan approval or NA orderFile: CC Verification pdf.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: CC Verification pdf.pdf7 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: NA COVERING LETTER.pdf3 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Declaration about CC.pdf3 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B Bank Declaration.pdf31 Jan 2025
Declaration in FORM BFile: Declaration Form B_compressed.pdf29 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration Format A.pdf28 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FOR SECURED.pdf28 Jan 2025
Layout approvalFile: Layout_compressed.pdf23 Jan 2025
Building plan approval or NA orderFile: Layout_compressed.pdf23 Jan 2025
Copy of the legal title reportFile: Title Report.pdf23 Jan 2025
Copy of the legal title reportFile: Search Report_compressed.pdf23 Jan 2025
Details of encumbrances concerned to FinanceFile: Nil Financial Encumberance.pdf23 Jan 2025
Details of encumbrances concerned to FinanceFile: Nil legal Encumberance.pdf23 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf23 Jan 2025
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout_compressed.pdf23 Jan 2025
Other - LegalFile: Sale Deed.pdf23 Jan 2025
Other - LegalFile: Ownership Declaration.pdf23 Jan 2025
Other - LegalFile: 7-12 Abstract_ SUKLI KH NO 30.pdf23 Jan 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf23 Jan 2025
CERSAI detailsFile: Undertaking CERSAI.pdf23 Jan 2025
Deviation Report with respect to Allotment letterFile: No Deviation AL.pdf23 Jan 2025
Details of encumbrances concerned to LegalFile: Nil Financial Encumberance.pdf23 Jan 2025
Details of encumbrances concerned to LegalFile: Nil legal Encumberance.pdf23 Jan 2025
Other - TechnicalFile: No Double Registration.pdf23 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation AFS.pdf23 Jan 2025
Proforma of Agreement for saleFile: AFS.pdf23 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Anne Rahul_compressed.pdf23 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Anne Prashant_compressed.pdf23 Jan 2025
PAN CardFile: Tirupati Developers_PAN.pdf30 Dec 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationStatusPromisedDelivered
Samruddhi-2SUKLI GUPCHUPCompletedApr 2027Jun 2023
Samruddhi-1SUKLI GUPCHUPCompletedMar 2027Jun 2023
Samruddhi-3MOUZA SUKLI GUPCHUPCompletedJan 2027Jun 2023

How this compares with Nagpur

95%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN PARK - 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KH NO 30 PART PH NO 45 SUKLI GUPCHUP HINGNA NAGPUR2,800+ in Nagpur

Builder: TIRUPATI DEVELOPERS

TIRUPATI DEVELOPERS has 81 registrations on MahaRERA, including SUVARNABHOOMI and DHANBHOOMI 1. Its filings disclose 86 earlier MahaRERA projects: declares 55 of 67 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if VRINDAVAN PARK - 4 is delayed beyond 31 Jan 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN PARK - 4?

The registered promoter entity is TIRUPATI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN PARK - 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRINDAVAN PARK - 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN PARK - 4?

The professionals named in the filing: Architect: UMESH LAMGE; Engineer: Mahesh Balpande; Engineer: Mayur Karingwar; Chartered Accountant: Sharma N CO; Chartered Accountant: MJM Associates; Chartered Accountant: Sonam Thakur. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN PARK - 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN PARK - 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN PARK - 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.